Construction Project Environmental Impact Report Form


 

 Table of contents

  1. Basic information of the construction project ................................................ ................. ERROR! Bookmark not defined.

  2. Engineering analysis of construction projects ................................................ ................................................. 19

  3. The status quo of regional environmental quality, environmental protection goals and evaluation standards ................................................ ........ 51

  4. Main environmental impacts and protection measures ................................................ ...................................... 56

  V. Supervision and Inspection List of Environmental Protection Measures ................................................ ................................. 79

  6. Conclusion ................................................................ ...................................................... ................. 81

  Attached table:

  Attached Table 1 Summary Table of Pollutant Emissions from Construction Projects Attachment:

  Attached picture:

  Attached Figure 1: Project Geographical Location Map

  Attached Figure 2: Location map of the surrounding relationship of the project

  Attached figure: 3: Project water system diagram

  Attached Figure 4: Plant Floor Plan

  Figure 5: Layout of conductor car/cable workshop

  Figure 6: Layout plan of electric wire workshop

  Attached Figure 7: Ambient Air Status Monitoring Site Map

  Attached Figure 8: Location relationship between the project and Yangzonghai Reserve

  appendix:

  Attachment 1: Project Power of Attorney

  Appendix 2: Project Investment Recordation Certificate

  Appendix 3: Project Business License

  Attachment 4: Environmental impact assessment approval for the relocation project of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.

  Attachment 5: Environmental Impact Assessment Approval of the Environmental Impact Supplementary Report of the Relocation Project of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.

  Appendix 6: Acceptance Opinions on Environmental Protection Acceptance for the Relocation of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.

  Annex 7: Monitoring report commissioned by Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.

  Appendix 8: Environmental Status Monitoring Report of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.

  Annex 9: Hazardous Waste Entrustment Agreement

  Attachment 10: Yunnan Municipal Environmental Protection Bureau on the "Master Plan of Yangzonghai Area in Kunming (2010-2020)"

  Review Opinions of the Environmental Impact Statement

  Annex 11: Level 3 Audit Form

  Attachment 12: Screenshot of public announcement before submission for trial

Table 1. Basic information of construction projects

Construction project name Kunming Kunbao Wire and Cable Manufacturing Co., Ltd. Green New Energy Cable Production Line Construction Project
project code

2205-530133-23-02-862812

Construction unit contact
people
Yao Wei contact details

18088266790

Construction site Qidian Industrial Park, Yangzonghai Scenic Area, Kunming Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.
geographic coordinates 102 degrees 55 minutes 13.766 seconds east longitude, 24 degrees 57 minutes 54.129 seconds north latitude

 

National economic industry category

 

C3831 Wire and Cable Manufacturing

 

Construction Project Industry Category

35. Electrical machinery and equipment manufacturing 38-77, wire and cable, optical fiber cable and electrical equipment manufacturing 383-other (except for only dividing, welding and assembling; annual non-solvent type low VOCs
Except for paints with a content of less than 10 tons)

 

Construction nature

new (relocation)
rebuild
R Expansion

Technological transformation

Construction project application

R first application project

Re-apply project after disapproval
Over five-year re-examination project
Major changes to re-approval projects

 

Project approval (approval
/filing) department

Yangzonghai Scenic Area Management Committee
Economic Development Bureau

 

Project approval (approval/filing) document number

 

2205-530133-23-02-862812

Total investment
(10,000 yuan)

8000

Environmental protection investment (ten thousand yuan)

54

Proportion of environmental protection investment
(%)

0.675%

Construction period September 2022 - October 2022

 

Whether to start construction

R no

Yes:

 

Land area (m2)

 

40565.85m2

 

Special evaluation settings

According to "Technical Guidelines for Compilation of Environmental Impact Report Form for Construction Projects (Pollution Impact)" (Trial)
In Table 1, determine whether to set up project-specific evaluation.

Table 1-1 Principles for setting up special evaluations

 

Types of special evaluations

set principle

Situation of this project

Special evaluation settings

 

atmosphere

The exhaust gas contains toxic and harmful pollutants 1. Dioxin, benzo[a]pyrene, cyanide, chlorine

The exhaust gas emitted by the project does not involve toxic and harmful pollutants, dioxins, benzo[a]pyrene, cyanide

not set

 

 

 

 

And there is ambient air within 500 meters outside the factory boundary chemicals, chlorine, so the project does not need to be carried out

 

 

Construction Projects for Gas Protection Objective 2 Special air evaluation.

 

 

Project cooling water recycling, no production waste

 

 

 

Newly added industrial wastewater direct discharge construction project (tank Water is generated, and the domestic wastewater of employees is regionalized by production

 

surface water

Except for tankers sent to sewage treatment plants);

After treatment in the septic tank, it will be discharged into the sewage in the Qidian area. not set

 

New centralized sewage treatment plant with direct wastewater discharge Therefore, this evaluation of surface water will not be carried out

 

 

 

special evaluation.

 

 

environmental risk

Construction projects with storage of toxic, hazardous and flammable and explosive hazardous substances exceeding the critical mass 3 After analysis, the storage capacity of hazardous substances in this project
The total does not exceed the critical amount, so special environmental risk assessment will not be carried out.

 

not set

 

 

ecology

Natural spawning grounds for important aquatic organisms, feeding grounds overwintering grounds and new river access for migratory passages within 500 meters downstream of the water intake
Water pollution construction projects
The water in this project is supplied by the pipeline network in the park, and does not involve water intake from rivers, so no ecological specialization will be carried out.
item evaluation.

 

not set

 

 

ocean

Marine engineering construction projects that discharge pollutants directly into the sea

This project is not a marine project and does not involve the discharge of pollutants into the sea, so no special marine evaluation will be carried out.

 

not set

 

Note: 1. The indicators of toxic and harmful pollutants in exhaust gas are included in the "List of Toxic and Harmful Air Pollutants" (excluding pollutants without emission standards).

 

 
2. Ambient air protection targets refer to areas with a high concentration of people in nature reserves, scenic spots, residential areas, cultural areas and rural areas.
 
3. For the critical quantity and its calculation method, please refer to Appendix B and Appendix C of "Technical Guidelines for Environmental Risk Assessment of Construction Projects" (HJ169).
 

 

Planning situation

Planning name: "Kunming Yangzonghai Regional Master Plan" (2010-2020);
Approval authority: Kunming Municipal People's Government
Examination document name and document number: "Approval of the Kunming Yangzonghai Regional Master Plan (2010-2020)" Kunzhengfu [2012] No. 85.

 

Planning Environmental Impact Assessment

Name of planning EIA: "Environmental Impact Report on the Overall Planning of Yangzonghai District, Kunming (2010-2020)";
Examining authority: Kunming Environmental Protection Bureau;
Examination document name and document number: Letter of Provincial Inspection Opinions on Environmental Impact Report of Kunming Yangzonghai District Master Plan (2010-2020) from Kunming Environmental Protection Bureau

 

Planning and planning environmental impact assessment compliance analysis

1、Planning Compliance Analysis
      (1)Planning and development orientation: The overall development of Yangzonghai District in Kunming is premised on the management and protection of plateau lakes, and is an internationally renowned eco-cultural tourism and leisure resort with leisure, health preservation and vacation as the leading functions.
Qidian Industrial Planning Zone - New Kunming Green Industry and Tourism Equipment R&D and Manufacturing Industrial Base, the main development industries are low-carbon green industries such as food, medicine, textile, and materials.

  Tangchi Tourist Town - a holiday and leisure town mainly for holiday tourism, hot spring recuperation, business meetings, and mountain leisure and living functions.

  Yangzong Tourism Town - a characteristic folk culture town formed by combining ecological environment protection and restoration construction, combined with local folk culture.

  Meadow Tourism Town - the central area of Yangzonghai, a comprehensive service town focusing on tourism services, administrative offices and urban facilities.

  Around the lake tourism and resort circle - a characteristic coastal sports and leisure tourism circle with functions such as tourism and vacation, leisure sports, hot spring recuperation, business meetings and so on.

  (2) Planning and development goals: fully grasp the opportunity of Kunming's bridgehead position, give full play to the superior geographical location and natural resources of Yangzonghai, take the ecological environment as the lifeblood, and take the transportation network as the foundation, through vigorous implementation of the full coverage of the plan, strong ecological governance, and industrial re-distribution, Regional urbanization, striving for 10 years to build Yangzonghai Scenic Spot into an international high-end tourist resort, tourism equipment manufacturing base, urban boutique agricultural tourism exhibition area, regional urbanization development experimental area, and natural ecological livable area. It is an international eco-tourism area with unique regional characteristics with reasonable layout, complete infrastructure, concentrated industrial development, complete urban functions, beautiful and pleasant environment. It has become a new business card for charming Kunming leisure and vacation, a new benchmark for ecological and environmental protection, a new model for livability and business, and a new model for urban and rural planning.

  (3) Regional Planning Structure

  Combined with the Yangzonghai Scenic Area, the regional planning determines the strategy of "axis series, fragmented growth, and multi-group aggregation", forming a group layout structure of "one core, one garden, three towns, and one circle" as a whole.

  "One core": refers to the core of Yangzonghai landscape, that is, the area along the Yangzonghai waters and the horizontal extension of 100 meters with the highest operating water level of 1769.9 meters (1985 national elevation benchmark); "One Garden": refers to the Qidian Industrial Planning Area, It is a regional sub-center area. As the focus of recent development and construction, it will build a low-carbon industrial planning area suitable for business and livability, transform and relocate heavy industrial areas, optimize and upgrade traditional basic industries, promote the development and construction of ecological economy, and highlight life. , production and service functions; "Three Towns": including Tangchi Tourist Town, Meadow Tourist Town and Yangzong Tourist Town, of which Tangchi Tourist Town is an important waterfront tourist area in the region, which will be built into an international hot spring convalescence and tourism town. Leisure resort base; Meadow tourist town as the regional central area; Yangzong tourist town is a concentrated area of ​​eco-tourism service facilities, mainly with functions such as folk culture, life and residence, and characteristic tourism; Zonghai as the core, is a tourism and vacation circle around the lake connected by landscape roads and expressways around the lake.

  It is mainly used for spa recuperation, business meetings and other functions.

  This project is located in Kunming Kunbao Wire and Cable Manufacturing Co., Ltd., Qidian Industrial Park, Yangzonghai Scenic Area, Kunming. It produces green new energy cable production lines, which is in line with the development orientation of Qidian Industrial Planning Zone and the development of regional industrial structure. In addition, Yangzong On May 6, 2022, the Economic Development Bureau of the Management Committee of the Sea Scenic Spots and Scenic Areas filed the project with the project code of 2205-530133-23-02-862812, and agreed to carry out the preliminary work of the project, so the project construction is in line with the overall construction of the Yangzonghai District of Kunming. planning.


2、Planning EIA compliance analysis
See Table 1-2 for the compliance analysis between the project and the "Environmental Impact Report of Kunming Yangzonghai District Master Plan (2010-2020)".

Table 1-2 List of Project and Planning EIA Compliance Analysis

 

serial number

Planning EIA Requirements

Situation of this project

compliance

 

一、Project entry requirements

 

 

1

Items that conform to the National "Industrial Structure Adjustment Guidance Catalogue (2011 Edition) (Amendment)" and provincial and municipal industrial policies. Items listed in the phase-out and restricted category are not allowed to enter the planning area The project complies with the provisions of the "Industrial Structure Adjustment Guidance Catalogue (2019 Edition)", and does not belong to the national "restricted" and "eliminated" projects

 

meets the

 

 

2

The settled enterprises must have advanced production technology, good safety performance, and meet the requirements of clean production; support the entry of light-polluting processing enterprises supporting environmental protection industries and high-tech industries. This project is a green new energy cable production line production project with advanced production technology and good safety.

 

meets the

 

 

 

3

The planning area prohibits the introduction of industries such as iron and steel, metallurgy, chemical industry, large and medium-sized machinery manufacturing, building materials, papermaking, tanning, slaughtering, and sugar making with high pollution and high energy consumption. Other industry projects planned

During the operation period of the project, the cooling water is recycled and not discharged; the canteen wastewater is treated by the grease trap and enters the septic tank of the plant together with other domestic wastewater for treatment, and then discharged to the sewage pipe network of the park, and finally enters the sewage treatment plant in the Qidian area for treatment. direct discharge.

 

 

meets the

 

 

4

All enterprises entering the park in the planning area shall comply with the relevant laws of the state
According to the requirements of laws and regulations, carry out environmental impact assessment of individual projects and go through relevant environmental protection procedures

The project is preparing an environmental impact assessment report

 

meets the

 

 

5

According to relevant geological data, there are Xiaojiang active fault zones and unidentified faults passing through the planned area.
Before the project is developed, it is necessary to do a detailed geological survey to determine the nature of the fault and make reasonable avoidance

 

This project is only to be expanded in the factory area that has been approved before, and no new land is involved.

 

meets the

 

 

6

Scenic spots in the planning area are prohibited from building facilities for storing explosive, flammable, radioactive, toxic and corrosive substances; it is prohibited to violate the planning of scenic spots by setting up various development zones in scenic spots and building hotels and guest houses in core scenic spots , training centers, nursing homes, and landscapes

The project is located in the Qidian Industrial Park area and does not involve scenic spots.

 

meets the

 

To sum up, the project construction and the "Environmental Impact Report on the Overall Planning of Haikou Industrial Park in Xishan District"
(2013-2030)” review opinion.

 

 

 

Other buildings unrelated to the conservation of scenic resources. The construction activities of scenic spots shall comply with the requirements of relevant laws and regulations such as the Regulations on Scenic Spots.

 

 

 

二、Requirements for EIA of Construction Projects

 

 

1

The construction projects in the planning area should carry out environmental impact assessment of individual projects in accordance with the requirements of relevant national laws and regulations, and the content of the environmental assessment report can be appropriately simplified

 

The project is preparing an environmental impact assessment report

 

meets the

 

 

 

2

Since the specific engineering design content and construction content of each construction project in the planning stage have not yet been determined, there will be certain deviations in the process of calculating the amount of related pollutants generated. Therefore, the EIA of a specific construction project should be based on the detailed design of the construction project. , calculate the amount of pollutants, etc.,
and perform predictive analytics

 

The project is preparing an environmental impact assessment report, and the production and discharge accounting will be carried out according to the specific conditions of the construction project

 

 

meets the

 

 

3

The EIA of construction projects should pay attention to the analysis of the consistency with the "Overall Planning of Yangzonghai District in Kunming": site selection and positioning, functional zoning, industrial layout, supporting public facilities, environmental protection facilities, etc. After site selection, functional zoning, and industrial layout analysis, the construction of the project meets the requirements of the overall plan

 

meets the

 

According to the above table, the construction of this project complies with the planning and environmental impact assessment requirements of the park.

3、Compliance Analysis of the Review Opinions of the Planning EIA

See Table 1-3 for the conformity analysis of the project and the provincial inspection opinion of the Kunming Environmental Protection Bureau on Environmental Impact Report on the Overall Planning of Yangzonghai District in Kunming (2010-2020).

Table 1-3 List of Conformance Analysis of Project and Planning EIA Review Opinions

serial number

Review opinion

Situation of this project

compliance

 

The planning area should be strictly accessible to the environment, and the industrial layout should comply with the "Regulations on the Protection of Yangzonghai in Yunnan Province" and the national industrial policy. The construction and development of the planning area should be carried out under the premise of abiding by the laws and regulations. Tourism and real estate development should be moderately controlled, and management and Pollution control, and earnestly protect the ecological environment of Yangzonghai area. The project complies with the provisions of the "Industrial Structure Adjustment Guidance Catalogue (2019 Edition)", does not belong to the national "restricted" and "eliminated" projects, and also complies with the "Regulations on the Protection of Yangzonghai in Yunnan Province"

 

 

 

 

1

 

meets the

 

 

 

 

 

 

 

2

The industrial layout should be carried out according to the "Yangzonghai Regional Master Plan (2010-2020)", zoning planning and layout should be done well, and the functions and layout of the park should be clarified, so that each enterprise can meet the requirements of the industry's sanitary protection distance. The construction project is located in the Qidian industrial planning area, which is in line with the development orientation and industrial layout of the park. The construction of this project is only to add some new equipment in the original factory area.

 

meets the

 

   

 

 

   

 

 

3

Establish an environmental risk prevention mechanism. Strengthen the environmental management of the planning area, improve the awareness of environmental risk prevention, formulate contingency plans for possible environmental risks, and implement risk prevention measures. After the completion of the project construction, the enterprise shall formulate an emergency plan for environmental emergencies in accordance with the requirements of the park

 

meets the

 

 

 

 

 

 

Other compliance analysis

     

  1. Analysis of the consistency of industrial policies

  The construction of this project only produces mining mobile metal shielded monitoring type rubber-sheathed flexible cables, photovoltaic low-voltage aluminum alloy cables, photovoltaic DC cables, and special rubber-sheathed cables for electric welding machines (excluding 6 kV and above (land use) dry cross-linking Electric power cable), which belongs to wire and cable manufacturing (national economic industry classification code C3831). After comparing with the "Industrial Structure Adjustment Guidance Catalogue" (2019 version), the project does not belong to the encouraged, restricted or prohibited projects. It is a permitted project. "Industrial Structure Adjustment Guidance Catalog" (2019 version). According to the "Notice of Yunnan Provincial Department of Commerce of Yunnan Provincial Development and Reform Commission on Forwarding the Negative List of Market Access (2020 Edition)" (Yunfa Gai Gai [2021] No. 42), the project does not belong to the prohibited items in the negative list , nor is it a licensing access matter, it is an industry outside the negative list of market access, and does not involve prohibitive provisions related to market access. In addition, on May 6, 2022, the Economic Development Bureau of Yangzonghai Scenic Area Management Committee filed the project with the project code of 2205-530133-23-02-862812, and agreed to carry out the preliminary work of the project. To sum up, the project is in line with the current industrial policy requirements.

  2. The compliance analysis with the "Implementation Opinions of the Kunming Municipal People's Government on the Ecological Environment Zone Management and Control of "Three Lines and One Single" in Kunming City (Kunzheng Fa [2021] No. 21) Notice on Strengthening Environmental Impact Assessment Management with Environmental Quality as the Core” (Environmental Environmental Assessment [2016] No. 150), which requires that the management of environmental impact assessment should be effectively strengthened, and the “red line of ecological protection, bottom line of environmental quality, upper limit of resource utilization and negative list of environmental access” should be implemented. Constraints, establish project EIA approval and planning EIA, existing project environmental management, regional environmental quality linkage mechanism, better play the role of the EIA system to prevent environmental pollution and ecological damage from the source, and accelerate the improvement of environmental quality.

  (1) The ecological protection red line and general ecological space project is located in Kunming Qidian Industrial Park Kunbao Wire and Cable Manufacturing Co., Ltd., and does not belong to drinking water source protection areas, scenic spots, nature reserves, areas near cultural relics protection units and other needs In the specially protected area, no ecological control area is involved, and it conforms to the ecological protection red line plan.

  (2) The bottom line of environmental quality According to the "Implementation Opinions of the People's Government of Kunming on Kunming's "Three Lines and One Single" Ecological Environment Zone Control (Kunzheng Fa [2021] No. 21)", the bottom line of Kunming's water environment quality is: "Included in the national The water quality rate of the surface water monitoring section assessed at the provincial level has steadily improved, the water quality of the Dianchi Lake Basin and Yangzonghai Basin has been significantly improved, and the functions of the water ecosystem have gradually recovered. Chemical oxygen demand ≤ 40 mg/L), the water quality of Yangzong Sea reaches Class III, and the quality of centralized drinking water sources has been consolidated and improved”; the nearest surface water body involved in the project construction area is the Yaochong River, according to the Kunming Ecological Environment Bureau According to the 2021 Kunming Ecological Environment Status Bulletin, all the indicators of the surface water in the project area can meet the Grade III water quality standard of the "Surface Water Environmental Quality Standard" (GB3838-2002). There is no production wastewater in the project. The domestic sewage of employees is treated by the self-built septic tank in the factory and then enters the sewage treatment plant in Qidian area. The completion and operation of the project will not change the surface water quality of the project area. According to the "Implementation Opinions of the Kunming Municipal People's Government on the Ecological Environment Zone Management and Control of "Three Lines and One Order" in Kunming (Kunzheng Fa [2021] No. 21)", the bottom line of Kunming's atmospheric environmental quality is: "By 2025, the city's ecological environment quality will be improved. With continuous improvement, the ecological space has been optimized and effectively protected, and the regional ecological safety barrier has become more solid. The city's ambient air quality has generally remained excellent, and the number of days with good air quality in the built-up area of ​​the main city accounted for more than 99%, and sulfur dioxide (SO2) and nitrogen oxides ( NOX) total emissions are controlled within the provincial target, and particulate matter (PM10, PM2.5) in the air in the main urban area is stably above the standard of the "Ambient Air Quality Standard"." According to the "2021 Kunming Ecological Environment Status Bulletin" issued by the Kunming Ecological Environment Bureau, the ambient air quality in the project area can meet the requirements of the "Ambient Air Quality Standard" (GB3095-2012) standard, and it is an area that meets the ambient air quality standard and still has capacity. The project construction is carried out, and the project only produces a small amount of waste gas. After relevant measures are taken, the ambient air function of the project area will not be changed. According to the "Implementation Opinions of the Kunming Municipal People's Government on the "Three Lines and One Single" Ecological Environment Zone Management and Control in Kunming (Kunzheng Fa [2021] No. 21)", the bottom line of soil environmental risk prevention and control in Kunming is: "The soil environmental risk prevention system further Improvement, the safe utilization rate of polluted farmland and the safe utilization rate of contaminated plots have been further improved, the quality of the city's soil environment has been gradually improved, the trend of soil pollution deterioration has been curbed, and soil environmental risks have been basically controlled. National and Yunnan Province assessment requirements." This project is a green new energy cable production line construction project. The project is located in Qidian Industrial Park Kunbao Wire and Cable Manufacturing Co., Ltd. The production workshop does not involve direct soil pollution, and the waste water, waste gas and solid waste generated by the project are all If properly disposed of, the soil environment safety in the project area can be effectively guaranteed.

 

  1.   Resource utilization online

      During the operation of the project, the water is mainly used for the domestic public use of employees, and the water is supplied by municipal tap water; the electricity used in the project is mainly supplied by the municipal power grid, and the consumption of project resources is less than the total utilization of regional resources. The positive benefits of the project construction are far greater than the negative benefits , so the project meets the online requirements for resource utilization.

  1.   Ecological Environment Access List

      According to the "Implementation Opinions of the Kunming Municipal People's Government on the Ecological Environment Zone Management and Control of "Three Lines and One Order" in Kunming (Kunzheng Fa [2021] No. 21)", the city is divided into 129 ecological environment management and control units, which are divided into priority protection and key management and control. and general control category 3. The name of the unit where the project is located is "Chenggong Industrial Park (Qidi)", the unit code is "ZH53011420003", and the unit is classified as "key control unit". The control requirements and implementation are shown in Table 1-3 below.


1-3 Management and control requirements and implementation of key management and control units

 

unit classification

control requirements

this project

compliance

 

 

 

 

 

 

 

 

key control unit

 

Space layout constraints

Focus on the development of green food industry, green traditional Chinese medicine industry, clean energy, and green materials.
Restrict metallurgy, machinery manufacturing, chemical, paper, leather, building materials and other industries.
The industrial park is close to the receptor sensitive area, so the development scope and scale of the heavily polluting industries in the park should not be expanded.

 

This project belongs to the manufacture of wires and cables, not a heavy polluting industry, nor a restricted industry.

 

 

meets the

 

 

 

 

Pollutant Emission Control

 

  1. During the construction of the park, "rain and sewage diversion" must be strictly implemented to strengthen the supervision of industrial pollution sources, and industrial waste water from enterprises shall not be discharged. The discharge of sewage containing pathogens must be disinfected and discharged after meeting the relevant national standards. Strengthen the construction of heavy metal pollution control facilities in industrial enterprises, and encourage enterprises to carry out in-depth treatment on the basis of standard discharge. Strictly control the discharge of toxic chemical pollutants, and strengthen the disposal of key environmental management chemical wastes and polluted sites.
    management and disposal.

    Implement secondary air quality standards and strengthen the control of total pollutant emissions.

This project implements "Environment Empty. Air Quality Standard (GB3095-2012) secondary standard, only additional equipment installation is required in the existing factory building, and the factory area has built a perfect rain and sewage diversion system; the project does not generate production wastewater, and domestic sewage passes through grease traps and septic tanks. After pretreatment, it will enter the sewage treatment plant in Qidian area; 100% solid waste will be disposed of

 

 

 

meets the

 

 

 

Environmental Risk Prevention and Control

Hazardous waste must be disposed of centrally. The collection and storage of hazardous wastes must be classified in accordance with the standards for hazardous wastes. It is forbidden to collect, store, transport and dispose of hazardous wastes of different natures that have not been safely disposed of, and it is forbidden to mix hazardous wastes with non-hazardous wastes for storage.
When transporting hazardous wastes, measures to prevent environmental pollution must be taken, and national regulations on the management of hazardous waste transport must be followed.

 

The company has established a standardized temporary storage room for hazardous waste, and signed a hazardous waste disposal agreement with Yunnan Dadi Fengyuan Environmental Protection Co., Ltd., which is in line with the national hazardous waste management regulations

 

 

meets the

 

 

 

 

 

 

 

 

 

Resource Development Efficiency Requirements 1. The reclaimed water reuse system is adopted in the planning of the park, which is used as water for green space, road sprinkling and other non-drinking water. The secondary standard water treated by the sewage treatment station and sewage treatment facility is used as the water source, and the water resources that meet the reclaimed water standard are further treated and reused. 2. The comprehensive utilization rate of industrial solid waste reaches 100%. The solid waste discharge of 10,000 yuan of industrial output value dropped by 25%, and the harmless treatment rate of domestic waste in the industrial park reached 100%. The water consumption of this project is small, the production wastewater is recycled after cooling, and water is used for greening in the plant area.
, comes from the reclaimed water station in the park, the general industrial solid waste generated by the project is all recycled and utilized, and the domestic garbage is disposed of by the park's sanitation.
meets the

 

Therefore, the construction of this project complies with the requirements of the national industrial policy. After the project is put into operation, if the corresponding pollution control measures are taken, the waste gas, waste water and noise can meet the corresponding emission standards; all solid wastes have been effectively and reasonably disposed. In conclusion, the project The construction meets the requirements of "three lines and one order".
3、Conformity analysis with "Regulations on the Protection of Yangzonghai in Yunnan Province"
According to the "Regulations on the Protection of Yangzonghai Sea of Yunnan Province", the key protected areas of Yangzonghai Sea are protected by grades and are divided into first-grade, second-grade and third-grade protected areas: the first-grade protected area is the Yangzonghai water body and the highest operating water level.
1769.90 meters horizontally extending to the area within 100 meters, as well as the main inflow channel and the extension on both sides
The area of 20 meters; the second-level protected area is the first-level protected area extending horizontally for 500 meters from east to west, and from north to south.
The area extending horizontally for 1,200 meters, and the area extending 20 meters on both sides of the main river channel into the lake and each extending 50 meters; the third-level protected area is the Yangzonghai runoff area outside the first- and second-level protected areas.
The area where the project is located is Kunming Qidian Industrial Park Kunbao Wire and Cable Manufacturing Co., Ltd., about 6km away from Yangzonghai Protected Area. The location relationship between the project and Yangzonghai’s graded protection range is shown in Figure 8. It can be seen from the figure that it is not located in Yangzonghai. Within the scope of marine protection, it does not involve Yangzonghai Reserve, which is in line with the Regulations on the Protection of Yangzonghai in Yunnan Province.
4、Conformance analysis with the "Detailed Implementation Rules for the Development of the Negative List of the Yangtze River Economic Belt in Yunnan Province (Trial)"

On November 1, 2019, the Yunnan Provincial Leading Group Office for Promoting the Development of the Yangtze River Economic Belt issued a notice on printing and distributing the "Implementation Rules for the Development of the Negative List of the Yangtze River Economic Belt in Yunnan Province (Trial)" (Yunfa Gai Ji [2019] No. 924). See Table 1-4 for an analysis of the compliance of this project with the Detailed Rules for the Implementation of the Negative List for the Development of the Yangtze River Economic Belt in Yunnan Province (for Trial Implementation).

Table 1-4 Consistency Analysis with the Detailed Rules for the Implementation of the Negative List for the Development of the Yangtze River Economic Belt in Yunnan Province (for Trial Implementation)

 

unit name

Negative list

The actual situation of the project

determination

 

 

Various functional areas

(1) All investment and construction projects that do not conform to the main function positioning are prohibited, and any change of use is strictly prohibited. Due to the needs of national major strategic resource exploration, on the premise that the main function positioning is not affected, the exploration project shall be arranged after approval according to law.
(2) Prohibition in the "General Protection, Development and Utilization of the Yangtze River Shoreline"
(1) The project construction conforms to the main function orientation;
(2) The project is located in Kunming Qidian Industrial Park, Kunming City, Kunming
Wire & Cable Manufacturing Co., Ltd.

 

meets the

 

 

 

 

The investment and construction in the shoreline protection area delineated in the Plan shall not only ensure the safety of flood control, river stability, water supply safety, and protection of the ecological environment; , river stability, water supply security, waterway stability and projects other than the protection of the ecological environment. It is forbidden to invest and construct projects that are not conducive to water resources and natural ecological protection in the river protection areas and reserved areas delineated in the "National Water Function Zoning of Important Rivers and Lakes". (3) It is prohibited to invest and construct within the ecological protection red line, except for the national major strategic resource exploration projects, ecological protection restoration and environmental governance projects, major infrastructure projects, military and national defense projects, and basic production and living projects for farmers and herdsmen. project. In principle, the ecological protection red line is managed according to the requirements of the prohibited development area. (4) It is prohibited to invest in and construct projects within the scope of permanent basic farmland, except for major national strategic resource exploration projects, ecological protection restoration and environmental governance projects, major infrastructure projects, military and national defense projects, and basic production and living projects for farmers and herdsmen. If the site selection of major construction projects is indeed difficult to avoid permanent basic farmland, the conversion of farmland and land acquisition shall be handled in accordance with laws and regulations, and supplementary planning and legal procedures shall be revised in accordance with the requirements of no reduction in quantity, quality, and stable layout. Corresponding overall planning for land use.(5) Prohibition of unauthorized occupation and adjustment of demarcated permanent basic farmland, especially permanent basic farmland around cities, no more permanent basic farmland should be reserved for construction and occupation, and it is strictly prohibited to adjust counties and townships without authorization. The overall plan for land use avoids the approval of occupation of permanent basic farmland, and illegal occupation without approval is strictly prohibited. It is prohibited to build secrets, build houses, build graves, dig sand, quarry, mine, borrow soil, and stack solid waste within the scope of permanent basic farmland. It is forbidden for any unit or individual to destroy the cultivation layer of permanent basic farmland; it is forbidden for any unit or individual to leave idle or barren permanent basic farmland. It is forbidden to illegally occupy permanent basic farmland in the name of facility farmland to construct leisure tourism. Resolutely prevent permanent basic farmland from "non-agriculturalization". (6) Prohibit the construction of the Jinsha River and the first-level tributaries of the Yangtze River unless approved by the Party Central Committee, the State Council, the national investment authority, and the relevant provincial departments. River infrastructure projects. It does not involve the coastline protection areas delineated in the "Overall Plan for the Protection, Development and Utilization of the Yangtze River Shoreline" and the river section protection areas and reserved areas delineated in the "National Water Function Zoning for Important Rivers and Lakes";
(3) The project is located in Kunming Qidian Industrial Park Kunbao Wire and Cable Manufacturing Co., Ltd., Kunming City, and is not within the scope of the ecological protection red line;
(4) The project is located in Kunbao Wire and Cable Manufacturing Co., Ltd., Kunming Qidian Industrial Park, Kunming City, adding a production line to the original factory building and does not involve basic farmland;
(5) The project is located in Kunbao Wire and Cable Manufacturing Co., Ltd., Kunming Qidian Industrial Park, Kunming City, adding production lines to the original factory buildings without occupying permanent basic farmland;
(6) The project is constructed in Kunming Qidian Industrial Park Kunbao Wire and Cable Manufacturing Co., Ltd., and does not involve Jinsha River and first-class tributaries of the Yangtze River.

 

 

 

 

Various protected areas

(7) It is prohibited to build any production facilities in the core areas and buffer zones of nature reserves. It is forbidden to build production facilities that pollute the environment, destroy resources or landscapes, and other projects whose pollutant discharge exceeds the national and local pollutant discharge standards in the experimental area of the nature reserve. Activities such as felling, grazing, hunting, fishing, medicine gathering, reclamation, burning, mining, quarrying, and sand dredging are prohibited in nature reserves, unless otherwise stipulated by laws and administrative regulations.
(8) Prohibition of planning for scenic spots without prior approval or violation of
Various construction activities shall be carried out against the approved scenic area planning. It is prohibited to set up various development zones and
(7) The project adds production equipment to the original project workshop. The workshop has been completed, and it does not involve nature reserves, nor does it involve activities such as felling, grazing, hunting, fishing, medicine gathering, reclamation, waste burning, mining, quarrying, sand dredging, etc.;
(8) The project adds production equipment to the original project workshop. The workshop has been completed.
The survey does not involve scenic spots;

 

 

 

meets the

 

 

 

 

Invest in the construction of hotels, guest houses, training centers, sanatoriums and other buildings not related to the protection of scenic resources in the core scenic spots. Activities that destroy landscape, vegetation and topography, such as mountain opening, quarrying, mining, wasteland reclamation, tomb building and monument building, etc., are prohibited in scenic spots; it is prohibited to build facilities for storing explosive, flammable, radioactive, toxic and corrosive substances. (9) Prohibit new construction, reconstruction and expansion of projects unrelated to water supply facilities and protection of water sources within the shorelines and river sections of the first-class protected areas for drinking water sources, as well as investment and construction that may pollute drinking water bodies such as cage culture and tourism project. It is prohibited to build, rebuild or expand investment and construction projects that discharge pollutants within the shoreline and river reach of the secondary protection zone for drinking water sources. (10) It is prohibited to build new sewage outlets within the shoreline and river reach of the aquatic germplasm resources protection area, and projects such as reclamation of land around lakes, land reclamation from lakes, or reclamation of river channels. It is prohibited to engage in any construction projects and development activities that do not conform to the main function positioning, such as real estate, resorts, golf courses, wind power generation, photovoltaic power generation, etc. within the scope of the National Wetland Park; Interrupting wetland water sources, dredging sand, mining, and introducing alien species; prohibiting unauthorized grazing, fishing, borrowing soil, water, sewage, and releasing animals; prohibiting other activities that damage wetlands and their ecological functions. (9) The project is constructed in Kunming Qidian Industrial Park Kunbao Wire and Cable Manufacturing Co., Ltd., and does not involve the first-class protection zone for drinking water sources and the second-class protection zone for drinking water sources;
(10) The project is located in Kunming Qidian Industrial Park Kunbao Wire and Cable Manufacturing Co., Ltd. in Kunming City, and does not involve aquatic germplasm resource reserves and national wetland parks.

 

 

 

 

 

 

 

 

 

Industrial layout

(11) It is prohibited to build or expand chemical parks and chemical projects within 1 km of the shoreline of the Jinsha River and the first-class tributaries of the Yangtze River. The newly built chemical park will fully leave a safe distance from the future expansion and development of surrounding towns, and based on the construction direction of the eco-industrial park, promote the development model of green chemistry and green chemical industry. The establishment of the chemical park and the industrial development plan of the park shall be reviewed and approved by experts organized by the provincial business department in charge.
(12) Prohibit the construction of non-coal mines that do not meet the relevant access standards for the transformation and upgrading of non-coal mines. Banned on the Jinsha River Shoreline 3
1 km and within 1 km of the shoreline of the first-class tributaries of the Yangtze River, build, rebuild and expand tailings ponds.
(13) It is forbidden to build or expand steel, petrochemical, chemical, coking, building materials, non-ferrous metals and other high-polluting projects outside the compliant park. It is forbidden to add new production capacity in industries such as steel, cement, and flat glass. If it is really necessary to build, the production capacity should be replaced by equal or reduced capacity according to regulations.
(14) Prohibit the construction or expansion of projects that do not conform to the national petrochemical, modern coal chemical and other industrial layout plans.
(15) Prohibit the construction or expansion of backward production capacity projects that are explicitly prohibited by laws, regulations and relevant policies, and eliminate unqualified calcium carbide furnaces, open-type calcium carbide furnaces, and single coking production facilities without chemical recycling in accordance with laws and regulations. The production of pyrite acid, sulfuric acid, yellow phosphorus production, calcium sintered chromium compound production plant and organic-inorganic compound fertilizer, superphosphate and calcium magnesium phosphate fertilizer production line that do not meet the requirements.
(16) Prohibit the construction of high-toxicity and high-residue pesticide technical production plants and strict control of urea, ammonium phosphate,
Calcium carbide, coke, yellow phosphorus, caustic soda, soda ash, PVC, etc.
(11) The project is constructed in Kunming Qidian Industrial Park Kunbao Wire and Cable Manufacturing Co., Ltd., and does not involve the Jinsha River and the first-class tributaries of the Yangtze River. This project is for the manufacture of wires and cables, not a chemical project;
(12) The project is a wire and cable manufacturing project, and does not involve coal mines and tailings ponds;
(13) The project is a wire and cable manufacturing project, and does not belong to high-pollution projects such as steel, petrochemical, chemical, coking, building materials, and non-ferrous metals;
(14) The project is a wire and cable manufacturing project, not a petrochemical or modern coal chemical project;
(15) The production equipment to be added to the project belongs to the advanced equipment, the technology belongs to the advanced technology, and does not belong to the backward production capacity project;
(16) The project is a wire and cable manufacturing project. It does not involve the production of pesticide technical materials with high toxicity and residues and has a great impact on the environment. It does not involve urea, ammonium phosphate, electricity, etc.
Stone, coke, yellow phosphorus, caustic soda,

 

 

 

 

 

 

 

meets the

 

 

 

 

Industry added capacity.
(17) It is forbidden to relocate and renovate enterprises listed in the "List of Relocation and Reconstruction of Hazardous Chemicals Production Enterprises in Densely Populated Urban Areas of Yunnan Province" to build or expand hazardous chemical production projects at the original site, and strengthen the relocation into the park, closing and exiting enterprises to vacate land pollution Risk control, governance and restoration to ensure that the vacated land is in line with the planned use
soil environmental quality standards.
Soda ash, PVC and other industries;
(17) Upon inquiry, the construction unit is not included in the List of Relocation and Reconstruction of Hazardous Chemical Manufacturing Enterprises in Densely Populated Urban Areas in Yunnan Province.

 

 

To sum up, the construction of this project does not violate the "Implementation Rules for the Development of the Negative List of the Yangtze River Economic Belt in Yunnan Province (Trial)", and conforms to the "Implementation Rules for the Negative List for the Development of the Yangtze River Economic Belt in Yunnan Province (Trial)".
5. Compliance analysis with the "Guidelines for the Development of the Yangtze River Economic Belt Negative List (Trial, 2022 Edition)"
On January 19, 2022, the Office of the Leading Group for Promoting the Development of the Yangtze River Economic Belt issued a notice on printing and distributing the "Guidelines for the Development of the Yangtze River Economic Belt Negative List (Trial, 2022 Edition)". See Table 1-5 for an analysis of the compatibility between this project and the “Guidelines for the Development of the Negative List of the Yangtze River Economic Belt (Trial, 2022 Edition)”.

Table 1-5 is consistent with the "Guidelines for the Development of the Yangtze River Economic Belt Negative List (Trial, 2022 Edition)"

 

serial number Negative list The actual situation of the project compliance

 

 

1

Prohibit the construction of wharf projects that do not conform to the national and provincial port layout plans and the overall port planning, and prohibit the construction of cross-Yangtze River crossings that do not conform to the "Yangtze River Trunk Line Crossing Channel Layout Plan"
channel item.
This project does not belong to the wharf project, nor does it belong to the project of crossing the Yangtze River.

 

meets the

 

 

2

It is prohibited to invest in the construction of tourism and production and operation projects in the core areas of nature reserves, the shorelines and river sections of buffer zones. It is prohibited to invest in and construct projects unrelated to the protection of scenic resources within the coastlines and river sections of core scenic spots in scenic spots. The project is not within the shoreline and river reach of the core area of the nature reserve, buffer zone, and the shoreline and river reach of the core scenic area of the scenic spot.

 

meets the

 

 

 

3

It is prohibited to build, rebuild and expand projects unrelated to water supply facilities and protection of water sources within the shoreline and river reach of the first-class protected area for drinking water sources, as well as investment in cage breeding, livestock breeding, tourism, etc. that may pollute drinking water bodies Construction projects. It is prohibited to build, rebuild or expand investment and construction projects that discharge pollutants within the shoreline and river reach of the secondary protection zone for drinking water sources.

 

The project is not within the shoreline and river reach of drinking water source-level protection zones and secondary protection zones.

 

 

meets the

 

 

4

It is prohibited to build new investment and construction projects such as reclaiming land from lakes, reclaiming land from seas, or reclamation within the shorelines and river sections of aquatic germplasm resources reserves. Sand dredging, mining, and any investment and construction projects that do not meet the main function positioning are prohibited within the shoreline and river reach of the National Wetland Park. There is no new sewage outlet in this project, no land reclamation from lakes, land reclamation or sea reclamation, and it is not within the shoreline and river reach of the National Wetland Park.

 

meets the

 

 

 

5

Illegal use and occupation of the shorelines of rivers and lakes in the Yangtze River Basin are prohibited. It is prohibited to invest in the construction of shoreline protection areas and reserved areas delineated in the "Overall Plan for the Protection, Development and Utilization of the Yangtze River Shoreline", except for flood control and bank protection, river management, water supply, ecological environment protection, waterway improvement, Projects other than nationally important infrastructure. It is forbidden to invest and construct in the river sections and lake protection areas and reserved areas delineated in the "National Important Rivers and Lakes Water Function Zoning", which is not conducive to water resources and water resources.
Projects for the protection of natural ecology.

 

 

Not involved in this project.

 

 

meets the

 

 

 

6

It is forbidden to build, reconfigure or expand sewage outfalls in the main and tributaries of the Yangtze River and lakes without permission Not involved in this project. meets the

 

7

Production line fishing is prohibited in "one river, one mouth, two lakes and seven rivers" and 332 aquatic life reserves. Not involved in this project. meets the

 

 

8

It is forbidden to build or expand chemical parks and chemical projects within one kilometer of the main and tributaries of the Yangtze River and the shorelines of important lakes. It is prohibited to build, rebuild or expand tailings ponds, smelting slag ponds and phosphogypsum ponds within 1 km of the shoreline of important tributaries within 3 kilometers of the main stream of the Yangtze River, except for the reconstruction for the purpose of improving the level of safety and ecological environment protection.

 

Not involved in this project.

 

meets the

 

 

9

It is forbidden to build or expand high-polluting projects such as steel, petrochemical, chemical, coking, building materials, non-ferrous metals, and pulp and paper outside the compliant park. This project does not belong to high pollution projects such as steel, petrochemical, chemical, coking, building materials, non-ferrous metals, pulp and paper.

 

meets the

 

10

It is forbidden to build or expand projects that do not conform to the national petrochemical, modern coal chemical and other industrial layout plans. This project does not belong to petrochemical and modern coal chemical projects. meets the

 

 

11

Prohibit the construction and expansion of backward production capacity projects that are explicitly prohibited by relevant laws and regulations. It is forbidden to build or expand projects in industries with serious excess capacity that do not meet the national capacity replacement requirements. It is forbidden to build or expand projects with high energy consumption and high emission that do not meet the requirements. This project does not belong to the backward production capacity project, and does not belong to the serious overcapacity industry project. as well as
It does not belong to high energy consumption and high emission projects.

 

meets the

 

12

Laws and regulations and related policy documents have stricter regulations. Not involved in this project. meets the

 

In summary, the construction of this project meets the requirements of the "Guidelines for the Development of the Negative List of the Yangtze River Economic Belt (Trial, 2022 Edition").
6. Compliance analysis with the Yangtze River Protection Law of the People's Republic of China
See Table 1-6 for an analysis of the compliance of this project with the Yangtze River Protection Law of the People's Republic of China.

Table 1-6 Consistency Analysis with "The Yangtze River Protection Law of the People's Republic of China)"

 

serial number

related information

The actual situation of the project

compliance

 

 

1

It is forbidden to deploy industries that have a serious impact on the ecosystem in the key ecological functional areas of the Yangtze River Basin. The transfer of heavily polluting enterprises and projects to the middle and upper reaches of the Yangtze River is prohibited.

 

This project is located in the Qidian production area of Yangzonghai, and is not a heavy pollutant enterprise.

 

meets the

 

 

2

It is forbidden to build or expand chemical parks and chemical projects within one kilometer of the shoreline of the main and tributaries of the Yangtze River. This project is located in the new area of Haikou Industrial Park, Xishan District, about 1.46km away from Yaochong River; this project is a wire and cable manufacturing project, not a chemical project. meets the

 

 

 

3

 

It is prohibited to build, rebuild or expand tailings ponds within 3 kilometers of the shoreline of the main stream of the Yangtze River and within 1 kilometer of the shoreline of important tributaries; except for the reconstruction for the purpose of improving the level of safety and ecological environment protection.

 

This project is located in the Qidian production area of Yangzonghai. It is a wire and cable manufacturing project, not a project of new construction, reconstruction and expansion of tailings ponds.

 

 

meets the

 

4

Strengthen the management of water quotas for high water consumption industries and key water consumption units, and strictly control high water consumption This project does not belong to high water consumption industries and key water consumption units. meets the

 

 

 

 

Project construction

 

 

 

 

5

It is prohibited to dump, landfill, stack, discard and dispose of solid waste within the management scope of rivers and lakes in the Yangtze River Basin. This project is a wire and cable manufacturing project. The hazardous waste generated is entrusted to Yunnan Dadi Fengyuan Environmental Protection Technology Co., Ltd. for removal and disposal, and general industrial solid waste is recycled.

 

meets the

 

 

6

It is forbidden to transport highly toxic chemicals and other dangerous chemicals through inland rivers prohibited by state regulations in the Yangtze River Basin. The company has signed a hazardous waste removal and disposal agreement with Yunnan Dadi Fengyuan Environmental Protection Technology Co., Ltd.

 

meets the

 

In conclusion, the construction of this project complies with the requirements of the Yangtze River Protection Law of the People's Republic of China.

7、Environmental Management Policy Compliance
According to the requirements of relevant documents, carry out relevant policy compliance analysis on the project construction situation. The products of this project are mainly wires and cables, which belong to wire and cable manufacturing C3831, and do not belong to the key industries (petrochemical, chemical, industrial coating, packaging and printing, oil storage, transportation and sales, etc.) See Table 1-7 for the specific content of the relevant compliance analysis.

Table 1-7 Relevant compliance analysis table

 

 

"Notice on Printing and Distributing the "Comprehensive Control Plan for Volatile Organic Compounds in Key Industries" (Huanqiqi [2019] No. 53)

Situation of this project

compliance

 

 

 

1

 

Vigorously promote source substitution

By using water-based, powder, high-solid, solvent-free, radiation-curing and other low-VOCs-content coatings, water-based, radiation-curing, plant-based and other low-VOCs-content inks, water-based, hot-melt, solvent-free, radiation-curing, modified , biodegradable adhesives with low VOCs content, and cleaning agents with low VOCs content and low reactivity, etc., to replace solvent-based coatings
materials, inks, adhesives, cleaning agents, etc., to reduce the generation of VOCs from the source.

 

 

The project does not belong to a key industry, and the amount of ink used in the coding process of this project is relatively small.

 

 

meets the

 

 

 

 

2

 

 

Comprehensively strengthen fugitive emission control

Focus on five categories of VOCs-containing materials (including VOCs-containing raw and auxiliary materials, VOCs-containing products, VOCs-containing wastes, and organic polymer materials, etc.) The emission source is controlled, and the unorganized emission of VOCs is reduced by taking measures such as equipment and site sealing, process improvement, and effective waste gas collection. In this project, PVC and PE do not generate VOCs without heating. After being collected by the gas collecting hood during the production process, after being treated by the activated carbon adsorption box treatment device, it is discharged from the 15m high exhaust pipe.

 

 

meets the

 

Improve exhaust gas collection rate. Following the principle of "collecting all receivables and collecting by quality", the waste gas collection system is scientifically designed to convert unorganized emissions into organized emissions for control.

 

The project adopts the method of collecting hood to collect organic waste gas.

 

meets the

 

 

 

3

 

Strengthen enterprise operation management

Enterprises should systematically sort out the main links and procedures of VOCs emission, including start-up and shutdown, inspection and maintenance operations, etc., formulate specific operating procedures, and implement them to specific responsible persons. Improve the internal assessment system. Strengthen personnel capacity training and technical exchanges. Establish a management ledger to record the key parameters of the company's production and pollution control facilities. Online monitoring parameters should be ensured to be available in real time, and relevant ledger records should be kept for at least three years.

 

The company has set up an environmental protection management system and formulated a management plan for VOCs prevention and control measures. After the project is completed, it will be incorporated into the existing management system.

 

 

meets the

 

 

 

 

 

 

 

 

 

"Notice on Printing and Distributing the 2020 Volatile Organic Compound Control Plan" (Huanqiqi [2020] No. 33) Situation of this project compliance

 

 

 

 

 

 

Strictly implement the national and local product VOCs content limit standards.

This project strictly implements the national and local product VOCs content limit standards.

 

meets the

 

 

Vigorously promote source substitution, Promote the replacement of raw and auxiliary materials with low (no) VOCs content. Enterprises should establish a raw and auxiliary material ledger to record the name, composition, VOCs content, purchase amount, usage, inventory, recycling method, recycling amount and other information of VOCs raw and auxiliary materials, and keep relevant certification materials. If the paints, inks, adhesives, etc. that comply with the national regulations on products with low VOCs content are used, the emission concentration is stable and the emission rate meets the relevant regulations, and the corresponding production process does not require the construction of end treatment facilities. For processes where the VOCs content (mass ratio) of the raw and auxiliary materials used is less than 10%, fugitive emission collection and treatment measures may not be required.

 

In the coding process of the project, inks with low VOCs content are used, and the amount of use is small, and a raw and auxiliary material ledger is established to record the name, composition, VOCs content of VOCs raw and auxiliary materials, purchase amount, usage amount, inventory amount, recycling method, and recycling amount. and other information, and keep relevant supporting materials.

 

 

 

 

 

 

 

 

1

Effectively reduce the production of VOCs, fully implement the standard requirements, strengthen the

meets the

 

 

 

 

 

 

 

 

 

 

  Implement and implement the "Volatile Organic Compound Emission Control Standards"; formulate VOCs fugitive emission control procedures, detailing specific processes and production links, as well as start-up and shutdown, inspection and maintenance operations, etc., and implement them to specific responsible persons; Improve the internal assessment system , produced in strict accordance with the operating procedures. The project implements and implements the "Volatile Organic Compound Emission Control Standard", and formulates the volatile organic compound fugitive emission control regulations.

meets the

 

 

   

 

 

   

 

 

   

 

 

   

 

 

  The storage link should use airtight containers, packaging bags, high-efficiency sealed storage tanks, closed storage warehouses, silos, etc. The loading and unloading, transfer and conveying links should use closed pipelines or closed containers, tankers, etc. The raw and auxiliary materials used in this project are stored in airtight packaging drums.

meets the

 

 

   

 

 

   

 

 

   

 

 

  The production and use links should use closed equipment, or operate in a closed space and effectively collect waste gas, or conduct local gas collection; the container should be closed when not in use. In the disposal process, the packaging containers containing VOCs materials, waste adsorbents containing VOCs (slag, liquid), etc. should be sealed by capping, packaging, etc., and stored properly, and should not be discarded at will. The organic waste gas produced by extrusion and injection molding is collected locally by the gas collecting hood. waste ink bucket
, and other contaminated wastes are entrusted to Yunnan Dadi Fengyuan Environmental Protection Co., Ltd. for disposal as hazardous waste.

 

 

 

  meets the

 

 

 

2

Organize emission control to improve comprehensive management efficiency

 

 

 

 

The collection, transportation, storage and treatment of wastewater with high VOCs content should be covered and sealed. If there are more than 2,000 sealing points of equipment and pipeline components containing gaseous and liquid VOCs materials in the enterprise, a comprehensive ledger should be established; petroleum refining, petrochemical, and synthetic resin enterprises should carry out development in strict accordance with the requirements of emission standards
LDAR work, strengthen the inspection of standby pumps, pumps in use, regulating valves, agitators, open pipelines, etc., and strengthen quality control; VOCs treatment facilities and
The sealing point of the tank is included in the inspection plan.

 

 

 

 

 

 

 

 

 

 

 

 

  This project does not produce waste water with high VOCs content; there are no gaseous and liquid VOCs materials.

meets the

 

 

 

 

 

 

 

 

 

 

Enterprises in petrochemical, chemical, coal chemical, pharmaceutical, pesticide and other industries should strengthen VOCs emission control during start-up and shutdown, as well as in cleaning, material returning, purging, venting, drying and other links to ensure that the standard requirements are met. The anti-corrosion, waterproof and anti-rust coating of enterprise production facilities should avoid summer or use low VOCs content coatings. Contaminated wastes such as waste ink drums used in this project are entrusted to Yunnan Dadi Fengyuan Environmental Protection Co., Ltd. for disposal as hazardous waste.

 

meets the

 

 

 

   

 

 

 

   

 

 

 

   

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

 

 

 

 

 

 

 

 

Focus on the "three rates" of pollution control facilities to improve the efficiency of comprehensive treatment

Replace or upgrade the VOCs collection and treatment facilities that fail to meet the requirements to ensure compliance with emission standards. In addition to odor control, generally do not use low
Warm plasma, photocatalysis, photooxidation and other technologies.
Replace or upgrade the VOCs collection and treatment facilities that fail to meet the requirements to ensure compliance with emission standards. In addition to odor control, generally do not use low
Warm plasma, photocatalysis, photooxidation and other technologies.

 

meets the

 

Increase the exhaust gas collection rate in accordance with the principle of "collect as much as possible". Promote the cancellation of the bypass of the exhaust gas emission system. If it must be retained due to safety production and other reasons, the list of retained bypass should be reported to the local ecological environment department. Strengthen supervision by means of planning and other methods, and promptly report to the local ecological environment department after opening.
Report and keep records.

 

The organic waste gas generated by the extrusion and injection molding process of this project is collected locally by the gas collecting hood. No exhaust system bypass.

 

 

meets the

 

Transform unorganized emissions into organized emissions for control, preferably using closed equipment, operating in a closed space or using a fully closed gas collecting hood for collection; for those using partial gas collecting hoods, the collection point should be reasonably selected according to the characteristics of exhaust gas emissions , the farthest VOCs fugitive emission position from the opening surface of the gas collecting hood, the control wind speed is not less than 0.3m/s, which does not meet the requirements
Timely renovation by replacing high-power fans, adding flue fans, and adding vertical curtains.

 

The project adopts the gas collecting hood for local collection, and the VOCs fugitive emission position farthest from the opening surface of the gas collecting hood is controlled to control the wind speed to be greater than 0.3m/s.

 

 

meets the

 

Improve the operation rate of treatment facilities in accordance with the principle of "starting and stopping at the same time" with production equipment. According to the requirements of the treatment process, the production equipment can be started only after the treatment facility reaches the normal operating conditions, and the treatment facility can be shut down only after the production equipment is stopped and the residual VOCs waste gas is collected and treated. The VOCS waste gas collection and treatment system of the project runs synchronously with the production process equipment. After the production process equipment stops running, the VOCS waste gas collection and treatment system can stop running.
Row.

 

 

meets the

 

When an enterprise builds new pollution control facilities or implements renovations on existing pollution control facilities, a reasonable selection of control technologies should be made based on the characteristics of exhaust gas, VOCs components and concentrations, and production conditions. A combination of multiple techniques is used. If activated carbon adsorption technology is adopted, activated carbon with an iodine value of not less than 800 mg/g should be selected, and a sufficient amount should be added and replaced in time according to the design requirements, and the replacement time and usage amount should be recorded. The project uses an activated carbon adsorption box to treat organic waste gas, and the selected activated carbon has an iodine value of 800 mg/g. This evaluation requires the enterprise to replace the activated carbon every 3 months, and record the replacement time and usage.

 

 

meets the

 

"Implementation Plan for Comprehensive Treatment of Volatile Organic Compounds in Key Industries in Yunnan Province"

Project Status

compliance

 

 

 

1

Vigorously promote source substitution. By using water-based, powder, high-solid, solvent-free, radiation-curing and other low-VOCs content coatings, water-based, radiation-curing, plant-based and other low-VOCs content inks, water-based, hot-melt, solvent-free, radiation-curing, modified , biodegradable adhesives with low VOCs content, and cleaning agents with low VOCs content and low reactivity, etc., to replace solvent-based coatings, inks,
Adhesives, cleaning agents, etc., reduce the generation of VOCs from the source.

 

This project does not belong to key industries. This project uses less ink in the coding process.

 

 

meets the

 

 

2

Comprehensively strengthen fugitive emission control. Focus on the storage, transfer and storage of VOCs-containing materials (including VOCs-containing raw and auxiliary materials, VOCs-containing products, VOCs-containing wastes, and organic polymer materials, etc.) The raw materials of the project are stored in sealed bags before use. The organic waste gas of this project is collected through gas collection.

 

meets the

 

 

 

 

Five types of emission sources such as transportation, leakage of equipment and pipeline components, open liquid surface escape, and technological processes are controlled and controlled, and the unorganized emissions of VOCs are reduced by taking measures such as equipment and site sealing, process improvement, and effective waste gas collection. After the hood is collected, it enters the activated carbon adsorption device for treatment and is discharged by three 15m high exhaust pipes.

 

 

 

 

3

 

Promote the construction of suitable and efficient pollution control facilities. When an enterprise builds new pollution control facilities or implements renovation of existing pollution control facilities, the control technology should be reasonably selected according to the concentration, composition, air volume, temperature, humidity, pressure, and production conditions of the exhaust gas. Encourage enterprises to adopt a combination of various technologies to improve the efficiency of VOCs treatment.

The project belongs to the expansion project. By adopting the measures of replacing the old with the new, the generated organic waste gas is collected and processed by the activated carbon adsorption box, and then discharged through three exhaust pipes with a height of 15m.

 

 

meets the

 

After analysis and comparison, this project complies with the requirements of the above relevant environmental management policies.

8、Site selection rationality analysis

The project is a wire and cable manufacturing project. It is located in Qidian Industrial Park, Kunming. It is an industrial land. The infrastructure construction of the park is complete. After taking corresponding environmental protection measures, the waste gas generated by the project has little impact on the surrounding environment. The waste water is discharged into the park pipe network after treatment, which has little impact on the surrounding surface water environment. All can be properly disposed of and the project is compatible with the surrounding environment. At present, the surrounding environment of the project is of good quality, with well-constructed infrastructure such as water and electricity, and the external environment is relatively simple, and there are no major environmental constraints. There are no cultural relics, scenic spots, historic sites and cultural and natural heritages that need special protection around the construction land, and they do not belong to the protection scope of nature reserves and scenic spots.
To sum up, the project construction site conditions, transportation, environmental protection, water, electricity, communication and other conditions are good, there are no major environmental constraints, and the project site selection is reasonable.
9、Environmental Compatibility Analysis
There are no environmental protection targets such as concentrated residential areas, schools, hospitals, schools, etc. within the scope of the project land and the surrounding 500m; Forests, important wetlands and other ecologically sensitive and fragile areas. There is no distribution of ancient and famous trees and cultural relics protection units in and around the project land area, there are no obvious environmental constraints, and there is no environmental protection target that requires special protection.

Table 1-8 List of surveys on pollution sources of surrounding enterprises of the project

 

Company Name

Relationship to project location

Main business

position

major air pollutants

 

Yunnan Tianqi Green Food Development Co., Ltd.

 

135m

Prepackaged food sales;
Vegetable products, roasted seeds and nuts, nut products, squares

 

southeast

 

particulates

 

 

 

 

 

instant food processing

 

 

 

Kunming Gao Shang Gao Food Co., Ltd.

 

157m

Meat products, agricultural and sideline products acquisition and processing and cold storage services;

 

southwest

Particulate matter, SO2, NOx

 

 

 

Dendrobium and other Chinese herbs

 

 

 

Yunnan Jinjiudi Biotechnology Co., Ltd.

 

131m

Planting, development and sales of medicinal materials; wholesale of Chinese medicinal materials and proprietary Chinese medicines; medicine

 

south

 

particulates

 

 

Manufacturing, pharmaceutical distribution;

 

 

Qidian Industrial Park Management Committee

245m

administration southeast

/

 

 
Kunming Dingyue Plastic Products Co., Ltd.

35m

Production and processing of plastic products, supply and marketing of materials north Particulate matter, organic waste gas

 

   

Sanchuan Cable Group

160m

Wire and cable manufacturing

northwest

Particulate matter, organic waste gas

 

 

 

Copper, Nickel and Their Alloys Casting

 

 

 

Chinalco Kunming Copper

260

Manufacturing, processing products, selling
sales, inspection, research and development,

north

Particulate matter, SO2, NOx

 

 

Promotion and Consulting Services

 

 

It can be seen from the investigation of the surrounding enterprises of the project that the surrounding enterprises have no restrictive factors to the project. The main pollutants of the project are exhaust gas, solid waste and noise. Production and processing enterprises have little impact on surrounding enterprises.
In conclusion, the project is compatible with the surrounding environment.

 

Table 2. Engineering analysis of construction projects

 

 

 

 

 

Construction Content  

  1. Origin of the project

  Kunming Kunbao Wire and Cable Manufacturing Co., Ltd. is a private enterprise specializing in the production of various wires and cables. In June 2009, the company rented a temporary workshop in Shiba Village, Ala Street Office, Kunming Economic and Technological Development Zone for production. At the beginning of 2013, the company was located in Kunming. In June 2014, the company entrusted Kunming University of Science and Technology to compile the Environmental Impact Report Form for the Relocation of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd. Reply to Kunbao Wire and Cable Manufacturing Co., Ltd. Environmental Impact Report Form for Relocation and Technical Transformation Project (Kunbaofu [2014] No. 319). Construction began in September 2014, and it was completed and put into operation in October 2015. Due to changes in some project contents and production processes during the construction process, the project contents, production processes, pollution production links, pollution control measures and pollutant discharges were all different from those of the project. The original EIA report and its approval requirements have changed. In November 2017, Kunming Kunbao Wire and Cable Manufacturing Co., Ltd. entrusted Beijing Guohuan Tsinghua Environmental Engineering Design and Research Institute Co., Ltd. to compile the "Environment of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd. Relocation Technical Transformation Project" In January 2018, the Kunming Environmental Protection Bureau approved the “Supplementary Report on the Environmental Impact of the Relocation Project of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.” (Kunhuaufufu [2018] No. 9).

  In order to meet the needs of market development, the construction unit purchased some new production equipment to expand the production capacity, and used the vacant area of ​​the existing workshop for construction, without involving the construction of new workshops and structures. The total investment is 80 million yuan to add more than 20 production equipment. After the project is completed, 30km of mining mobile metal shielded monitoring type rubber sheathed flexible cable, 800km of photovoltaic low-voltage aluminum alloy cable, 600km of photovoltaic DC cable, and 500km of special rubber sheathed cable for electric welding machine will be added. Improve the company's wire and cable manufacturing level and production capacity. According to the relevant regulations of the "Environmental Impact Assessment Classification Management Catalogue of Construction Projects" (2021 Edition), this project belongs to "Others" in "35. Electrical Machinery and Equipment Manufacturing; 77-Wire, Cable, Optical Cable and Electrical Equipment Manufacturing 383" ” (except for splitting, welding, and assembly; except for non-solvent-based low VOCs content paints with an annual use of less than 10 tons), so this project should prepare an environmental impact report form. According to relevant regulations, field investigations were carried out on the surrounding environmental conditions of the project construction site, relevant local environmental data were collected and verified, and the "Kunming Kunbao Wire and Cable Manufacturing Co., Ltd. Green New Energy Cable Production Line Construction Project Report was compiled in accordance with the relevant technical specifications of environmental impact assessment." Form" for the construction unit to submit for approval.

  2. Construction content and scale

  (1) Main project content

 

In order to improve the overall manufacturing level and production capacity of the company's wires and cables, the expansion project has added supporting production equipment of the original project, and added more than 20 sets of main production equipment. The public works rely on the supporting facilities of the original project. The specific project construction content is shown in Table 2-1.

Table 2-1 List of main project contents of the project

 

Project composition

name

Construction content and scale

Remark

 

 

 

 

structural work

 

1# Factory

 

Conductor workshop

The conductor semi-finished products for the production of wire and cable are only simply twisted, and the wire and cable are not outsourced. This time, 1 large aluminum alloy wire drawing machine, 1 continuous annealing copper large wire drawing machine, 1 wire harnessing machine, and frame type are added. 2 stranding machines, 1 bow stranding machine

 

new

 

 

 

2# workshop

 

cable workshop

In the non-independent operation room, 1 new cable forming machine, steel tape armoring machine, SJ120 plastic extruder, SJ90 plastic extruder, horizontal high-speed braiding machine, 630 single stranding machine, 36 type braiding machine, 60 type Metal argon arc welded pipe unit

new

 

 

wire workshop

In the non-independent operation room, the new SX-150/16 rubber extruder, SX-120+90/16 type rubber extruder, SX-70/16 type rubber extruder, JXL-150+90+ 65 type rubber extruder, JXL-65+45 type rubber extruder, GJ-630 bow stranding machine

 

new

 

Auxiliary Engineering

Dormitory, canteen, office

The building area is 40565.85m2,
Canteen on the 1st floor, staff dormitory on the 2nd-4th floor, office on the 5th-6th floor

 rely on

 

 

 

public works

water supply

Municipal water supply network supply.

rely on

 

drain

Rainwater and sewage are separated; rainwater is discharged into the rainwater pipe network of the park; domestic wastewater is discharged into the sewage treatment plant in Chenggong Industrial Park.

rely on

 

 powered by

The industrial park has built a complete power supply system, and the power supply of the project is introduced from the 10kV branch line outside the area into the transformation and distribution room in the area. The voltage in the transformation and distribution room is 380V/220V, and the 50Hz low voltage is used by each unit in the enterprise

 

rely on

 

heating

The living facilities of the project use solar energy; the kitchen uses liquefied gas and electricity;

rely on

 

fire

The fire water of the project is supplied by the regional main pipe, and outdoor fire hydrants are set on the annular pipe network.
The spacing is not more than 150m, and the valve wells are set up according to the specifications to make the necessary separation, which can ensure the requirements of fire water.

 

rely on

 

Storage and transportation engineering

Finished product warehouse

Vacant area on the north side of the 2# factory building

rely on

 

Raw material library

2# The raw material warehouse on the east side of the plant

rely on

 

 

 

 

Environmental Engineering

Grease Trap Volume 5m3, located outside the canteen

 

 

rely on

 

septic tank 7 septic tanks with a volume of 10m³ have been constructed
greening 8647.58m2

Garbage room

The west side and south side of the 1# workshop are respectively provided with domestic garbage sorting and collection bins

Kitchen fume control facilities

kitchen fume purifier

General solid waste temporary storage room

There is a 20m2 solid waste temporary storage room on the west side of the 2# workshop

Hazardous waste temporary storage room

Covers an area of 20m2

new

 

Waste gas treatment facilities

A 15m exhaust tube, a set of three-stage activated carbon adsorption device, and two gas collecting hoods were added in the cable workshop, and a 15m exhaust tube, a set of three-stage activated carbon adsorption device, and a gas collecting hood were added in the wire workshop.

 

new

 

Table 2-3 Comparison list of products and capacity before and after expansion

  1. The main production equipment

This project mainly adds 20 production equipments, and other equipments will use the original equipments. Major expansion projects
The equipment is shown in Table 2-4 below, and the equipment changes before and after the expansion are shown in Table 2-5 below.

Table 2-4 List of main equipment of this expansion project

 

 

 

noise

Use low-noise equipment, vibration reduction and sound insulation, and noise reduction measures.

new

 

  1. Product solutions

According to the information provided by the construction unit, most of the equipment for the production of wires and cables is general equipment, and it is only the difference in the production link. Therefore, among the various products produced by this expansion project, there is no clear production line boundary. According to the needs of customers, production equipment is used to produce different products. After the project is completed, a new 30km/a flexible cable of mine-use mobile metal shielded monitoring type rubber sheath is added. , PV low-voltage aluminum alloy cable 800km/a, PV DC cable 600km/a, special rubber sheathed cable for electric welding machine 500km/a, see Table 2-2 for details, see Table 2-3 for changes in production capacity after the expansion .

Table 2-2 Product scheme of this expansion project

 

serial number

device name

Specifications

quantity

 

1

Continuous annealing copper wire drawing machine

LH0-450/11KT

1

 

2

Aluminum alloy large wire drawing machine

LH0-450/13

1

 

serial number

Product number

product name

new capacity
(km/a)

1

MYPTJ

Mine mobile metal shielded monitoring rubber sheathed flexible cable (8.7/10) KV

30

2

ZC-YJLHV22

Photovoltaic low voltage aluminum alloy cable (1.8/3) KV

800

3

PV1-F

Photovoltaic DC cable 1.8KV

600

4

YH

Special rubber sheathed cable for electric welding machine (0.45/0.75) KV

500

 

serial number

 

name

production capacity

unit of measurement

original approval

new

Whole plant capacity

increase or decrease

1

Steel core aluminum stranded wire

1600

/

1600

0

t/a

2

Steel core aluminum alloy stranded wire

540

/

540

0

t/a

3

Overhead Insulated Cables (1KV and 10KV)

380

/

380

0

t/a

4

XLPE insulated power cable

150

/

150

0

t/a

5

PVC insulated power cable

220

/

220

0

t/a

6

Control cable (polyvinyl chloride insulated control cable, cross-linked polyvinyl chloride insulated control cable)

220

/

220

0

t/a

7

PVC insulated wire (fire-resistant, flame-retardant series)

4280

/

4280

0

t/a

8

Mine mobile metal shielded monitoring rubber sheathed flexible cable (8.7/10) KV

/

30

30

+30

km/a

9

Photovoltaic low voltage aluminum alloy cable (1.8/3) KV

/

800

800

+800

km/a

10

Photovoltaic DC cable 1.8KV

/

600

600

+600

km/a

11

Special rubber sheathed cable for electric welding machine (0.45/0.75) KV

/

500

500

+500

km/a

 

 

3

Beaming machine

JGGB-400/6

1

 

4

Frame Stranding Machine

JLK-630/12+18+242#

2

 

5

bow winch

JGGB-630/6

1

 

6

Horizontal high-speed braiding machine

HGSB-16A

1

 

7

Cable forming machine

1250/1+6

1

 

8

Metal argon arc welded pipe unit

DAG60/180

1

 

9

Steel tape armoring machine

800 type

1

 

10

plastic extruder

SJ90

1

 

11

single twister

GJ-630

1

 

12

weaving machine

36 type

1

 

13

Extruder

SJ-120/25

1

 

14

rubber extruder

SX-150/16 type

1

 

15

rubber extruder

SX-120+90/16 type

1

 

16

rubber extruder

SX-70/16 type

1

 

17

rubber extruder

JXL-150+90+65

1

 

18

rubber extruder

JXL-65+45

1

 

19

bow winch

GJ-630

1

 

2-5 本扩建项目主要设备一览表

 

serial number

Production equipment

Model Specifications

Before expansion

after expansion

Changes

 

1

Copper middle drawing machine

ZL-280/17

1

1

constant

 

2

Aluminum alloy large drawing machine

LT-450/13

1

1

constant

 

3

Pipe stranding machine

JG-400/1+6

1

1

constant

 

4

Pipe stranding machine

JG-630/1+6

1

1

constant

 

5

fork winch

JC-400/12+18+24

1

1

constant

 

6

Stranding machine

JP-200/6+12

1

1

constant

 

7

Stranding machine

JP-12/6+12+18

1

1

constant

 

8

cage winch

JL-500/12+18

1

1

constant

 

9

Rewinder

400/500

1

1

constant

 

10

Frame stranding machine

JK-630/6+12+18+24

1

1

constant

 

11

plastic extruder

SJ-65

2

2

constant

 

12

plastic extruder

SJ-90

1

1

constant

 

13

plastic extruder

SJ-70+30

3

3

constant

 

14

plastic extruder

SJ-80

1

1

constant

 

15

Cable forming machine

JC-1250/1+1+3

1

1

constant

 

16

Locking type armoring machine

LZKH-100

1

1

constant

 

17

Cross-linked cable production line

CCV-80+175+100

4

4

constant

 

18

Copper tape shielding machine

PRT-600

1

1

constant

 

19

Disc cable forming machine

JPD-3150

1

1

constant

 

20

Cable forming machine

JC-1250/2+3

1

1

constant

 

21

24 Ingot metal braiding machine

HGSB-24

1

1

constant

 

22

16 Ingot metal braiding machine

HGSB-16

3

3

constant

 

23

Mica strapping machine

TRBW-630

1

1

constant

 

24

Elevator or Hoist

Fuji

1

1

constant

 

25

Rewinder

500/630

2

2

constant

 

26

Partial discharge test system

SR-2000/2500KVA

1

1

constant

 