Construction Project Environmental Impact Report Form
Table of contents
1. Basic information of the construction project ................................................ ................. ERROR! Bookmark not defined.
2. Engineering analysis of construction projects ................................................ ................................................. 19
3. The status quo of regional environmental quality, environmental protection goals and evaluation standards ................................................ ........ 51
4. Main environmental impacts and protection measures ................................................ ...................................... 56
V. Supervision and Inspection List of Environmental Protection Measures ................................................ ................................. 79
6. Conclusion ................................................................ ...................................................... ................. 81
Attached table:
Attached Table 1 Summary Table of Pollutant Emissions from Construction Projects Attachment:
Attached picture:
Attached Figure 1: Project Geographical Location Map
Attached Figure 2: Location map of the surrounding relationship of the project
Attached figure: 3: Project water system diagram
Attached Figure 4: Plant Floor Plan
Figure 5: Layout of conductor car/cable workshop
Figure 6: Layout plan of electric wire workshop
Attached Figure 7: Ambient Air Status Monitoring Site Map
Attached Figure 8: Location relationship between the project and Yangzonghai Reserve
appendix:
Attachment 1: Project Power of Attorney
Appendix 2: Project Investment Recordation Certificate
Appendix 3: Project Business License
Attachment 4: Environmental impact assessment approval for the relocation project of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.
Attachment 5: Environmental Impact Assessment Approval of the Environmental Impact Supplementary Report of the Relocation Project of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.
Appendix 6: Acceptance Opinions on Environmental Protection Acceptance for the Relocation of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.
Annex 7: Monitoring report commissioned by Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.
Appendix 8: Environmental Status Monitoring Report of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.
Annex 9: Hazardous Waste Entrustment Agreement
Attachment 10: Yunnan Municipal Environmental Protection Bureau on the "Master Plan of Yangzonghai Area in Kunming (2010-2020)"
Review Opinions of the Environmental Impact Statement
Annex 11: Level 3 Audit Form
Attachment 12: Screenshot of public announcement before submission for trial
Table 1. Basic information of construction projects
Construction project name | Kunming Kunbao Wire and Cable Manufacturing Co., Ltd. Green New Energy Cable Production Line Construction Project | |||||||
project code |
2205-530133-23-02-862812 |
|||||||
Construction unit contact people |
Yao Wei | contact details |
18088266790 |
|||||
Construction site | Qidian Industrial Park, Yangzonghai Scenic Area, Kunming Kunming Kunbao Wire and Cable Manufacturing Co., Ltd. | |||||||
geographic coordinates | 102 degrees 55 minutes 13.766 seconds east longitude, 24 degrees 57 minutes 54.129 seconds north latitude | |||||||
National economic industry category |
C3831 Wire and Cable Manufacturing |
Construction Project Industry Category |
35. Electrical machinery and equipment manufacturing 38-77, wire and cable, optical fiber cable and electrical equipment manufacturing 383-other (except for only dividing, welding and assembling; annual non-solvent type low VOCs Except for paints with a content of less than 10 tons) |
|||||
Construction nature |
new (relocation) Technological transformation |
Construction project application |
R first application project Re-apply project after disapproval |
|||||
Project approval (approval |
Yangzonghai Scenic Area Management Committee Economic Development Bureau |
Project approval (approval/filing) document number |
2205-530133-23-02-862812 |
|||||
Total investment (10,000 yuan) |
8000 |
Environmental protection investment (ten thousand yuan) |
54 |
|||||
Proportion of environmental protection investment (%) |
0.675% |
Construction period | September 2022 - October 2022 | |||||
Whether to start construction |
R no Yes: |
Land area (m2) |
40565.85m2 |
|||||
Special evaluation settings |
According to "Technical Guidelines for Compilation of Environmental Impact Report Form for Construction Projects (Pollution Impact)" (Trial) Table 1-1 Principles for setting up special evaluations |
|||||||
|
Types of special evaluations |
set principle |
Situation of this project |
Special evaluation settings |
|
|||
atmosphere |
The exhaust gas contains toxic and harmful pollutants 1. Dioxin, benzo[a]pyrene, cyanide, chlorine |
The exhaust gas emitted by the project does not involve toxic and harmful pollutants, dioxins, benzo[a]pyrene, cyanide |
not set |
|
To sum up, the project construction and the "Environmental Impact Report on the Overall Planning of Haikou Industrial Park in Xishan District"
(2013-2030)” review opinion.
serial number |
Review opinion |
Situation of this project |
compliance |
|
The planning area should be strictly accessible to the environment, and the industrial layout should comply with the "Regulations on the Protection of Yangzonghai in Yunnan Province" and the national industrial policy. The construction and development of the planning area should be carried out under the premise of abiding by the laws and regulations. Tourism and real estate development should be moderately controlled, and management and Pollution control, and earnestly protect the ecological environment of Yangzonghai area. | The project complies with the provisions of the "Industrial Structure Adjustment Guidance Catalogue (2019 Edition)", does not belong to the national "restricted" and "eliminated" projects, and also complies with the "Regulations on the Protection of Yangzonghai in Yunnan Province" |
|
|
|
||
1 |
meets the |
||
|
|
||
|
|
||
2 |
The industrial layout should be carried out according to the "Yangzonghai Regional Master Plan (2010-2020)", zoning planning and layout should be done well, and the functions and layout of the park should be clarified, so that each enterprise can meet the requirements of the industry's sanitary protection distance. | The construction project is located in the Qidian industrial planning area, which is in line with the development orientation and industrial layout of the park. The construction of this project is only to add some new equipment in the original factory area. |
meets the |
|
|
||
|
|
||
3 |
Establish an environmental risk prevention mechanism. Strengthen the environmental management of the planning area, improve the awareness of environmental risk prevention, formulate contingency plans for possible environmental risks, and implement risk prevention measures. | After the completion of the project construction, the enterprise shall formulate an emergency plan for environmental emergencies in accordance with the requirements of the park |
meets the |
Other compliance analysis |
1. Analysis of the consistency of industrial policies The construction of this project only produces mining mobile metal shielded monitoring type rubber-sheathed flexible cables, photovoltaic low-voltage aluminum alloy cables, photovoltaic DC cables, and special rubber-sheathed cables for electric welding machines (excluding 6 kV and above (land use) dry cross-linking Electric power cable), which belongs to wire and cable manufacturing (national economic industry classification code C3831). After comparing with the "Industrial Structure Adjustment Guidance Catalogue" (2019 version), the project does not belong to the encouraged, restricted or prohibited projects. It is a permitted project. "Industrial Structure Adjustment Guidance Catalog" (2019 version). According to the "Notice of Yunnan Provincial Department of Commerce of Yunnan Provincial Development and Reform Commission on Forwarding the Negative List of Market Access (2020 Edition)" (Yunfa Gai Gai [2021] No. 42), the project does not belong to the prohibited items in the negative list , nor is it a licensing access matter, it is an industry outside the negative list of market access, and does not involve prohibitive provisions related to market access. In addition, on May 6, 2022, the Economic Development Bureau of Yangzonghai Scenic Area Management Committee filed the project with the project code of 2205-530133-23-02-862812, and agreed to carry out the preliminary work of the project. To sum up, the project is in line with the current industrial policy requirements. 2. The compliance analysis with the "Implementation Opinions of the Kunming Municipal People's Government on the Ecological Environment Zone Management and Control of "Three Lines and One Single" in Kunming City (Kunzheng Fa [2021] No. 21) Notice on Strengthening Environmental Impact Assessment Management with Environmental Quality as the Core” (Environmental Environmental Assessment [2016] No. 150), which requires that the management of environmental impact assessment should be effectively strengthened, and the “red line of ecological protection, bottom line of environmental quality, upper limit of resource utilization and negative list of environmental access” should be implemented. Constraints, establish project EIA approval and planning EIA, existing project environmental management, regional environmental quality linkage mechanism, better play the role of the EIA system to prevent environmental pollution and ecological damage from the source, and accelerate the improvement of environmental quality. (1) The ecological protection red line and general ecological space project is located in Kunming Qidian Industrial Park Kunbao Wire and Cable Manufacturing Co., Ltd., and does not belong to drinking water source protection areas, scenic spots, nature reserves, areas near cultural relics protection units and other needs In the specially protected area, no ecological control area is involved, and it conforms to the ecological protection red line plan. (2) The bottom line of environmental quality According to the "Implementation Opinions of the People's Government of Kunming on Kunming's "Three Lines and One Single" Ecological Environment Zone Control (Kunzheng Fa [2021] No. 21)", the bottom line of Kunming's water environment quality is: "Included in the national The water quality rate of the surface water monitoring section assessed at the provincial level has steadily improved, the water quality of the Dianchi Lake Basin and Yangzonghai Basin has been significantly improved, and the functions of the water ecosystem have gradually recovered. Chemical oxygen demand ≤ 40 mg/L), the water quality of Yangzong Sea reaches Class III, and the quality of centralized drinking water sources has been consolidated and improved”; the nearest surface water body involved in the project construction area is the Yaochong River, according to the Kunming Ecological Environment Bureau According to the 2021 Kunming Ecological Environment Status Bulletin, all the indicators of the surface water in the project area can meet the Grade III water quality standard of the "Surface Water Environmental Quality Standard" (GB3838-2002). There is no production wastewater in the project. The domestic sewage of employees is treated by the self-built septic tank in the factory and then enters the sewage treatment plant in Qidian area. The completion and operation of the project will not change the surface water quality of the project area. According to the "Implementation Opinions of the Kunming Municipal People's Government on the Ecological Environment Zone Management and Control of "Three Lines and One Order" in Kunming (Kunzheng Fa [2021] No. 21)", the bottom line of Kunming's atmospheric environmental quality is: "By 2025, the city's ecological environment quality will be improved. With continuous improvement, the ecological space has been optimized and effectively protected, and the regional ecological safety barrier has become more solid. The city's ambient air quality has generally remained excellent, and the number of days with good air quality in the built-up area of the main city accounted for more than 99%, and sulfur dioxide (SO2) and nitrogen oxides ( NOX) total emissions are controlled within the provincial target, and particulate matter (PM10, PM2.5) in the air in the main urban area is stably above the standard of the "Ambient Air Quality Standard"." According to the "2021 Kunming Ecological Environment Status Bulletin" issued by the Kunming Ecological Environment Bureau, the ambient air quality in the project area can meet the requirements of the "Ambient Air Quality Standard" (GB3095-2012) standard, and it is an area that meets the ambient air quality standard and still has capacity. The project construction is carried out, and the project only produces a small amount of waste gas. After relevant measures are taken, the ambient air function of the project area will not be changed. According to the "Implementation Opinions of the Kunming Municipal People's Government on the "Three Lines and One Single" Ecological Environment Zone Management and Control in Kunming (Kunzheng Fa [2021] No. 21)", the bottom line of soil environmental risk prevention and control in Kunming is: "The soil environmental risk prevention system further Improvement, the safe utilization rate of polluted farmland and the safe utilization rate of contaminated plots have been further improved, the quality of the city's soil environment has been gradually improved, the trend of soil pollution deterioration has been curbed, and soil environmental risks have been basically controlled. National and Yunnan Province assessment requirements." This project is a green new energy cable production line construction project. The project is located in Qidian Industrial Park Kunbao Wire and Cable Manufacturing Co., Ltd. The production workshop does not involve direct soil pollution, and the waste water, waste gas and solid waste generated by the project are all If properly disposed of, the soil environment safety in the project area can be effectively guaranteed. |
|
|
||||||
|
unit classification |
control requirements |
this project |
compliance |
|
||
key control unit |
Space layout constraints |
Focus on the development of green food industry, green traditional Chinese medicine industry, clean energy, and green materials. Restrict metallurgy, machinery manufacturing, chemical, paper, leather, building materials and other industries. The industrial park is close to the receptor sensitive area, so the development scope and scale of the heavily polluting industries in the park should not be expanded. |
This project belongs to the manufacture of wires and cables, not a heavy polluting industry, nor a restricted industry. |
meets the |
|
||
Pollutant Emission Control |
|
This project implements "Environment Empty. Air Quality Standard (GB3095-2012) secondary standard, only additional equipment installation is required in the existing factory building, and the factory area has built a perfect rain and sewage diversion system; the project does not generate production wastewater, and domestic sewage passes through grease traps and septic tanks. After pretreatment, it will enter the sewage treatment plant in Qidian area; 100% solid waste will be disposed of |
meets the |
|
|||
Environmental Risk Prevention and Control |
Hazardous waste must be disposed of centrally. The collection and storage of hazardous wastes must be classified in accordance with the standards for hazardous wastes. It is forbidden to collect, store, transport and dispose of hazardous wastes of different natures that have not been safely disposed of, and it is forbidden to mix hazardous wastes with non-hazardous wastes for storage. When transporting hazardous wastes, measures to prevent environmental pollution must be taken, and national regulations on the management of hazardous waste transport must be followed. |
The company has established a standardized temporary storage room for hazardous waste, and signed a hazardous waste disposal agreement with Yunnan Dadi Fengyuan Environmental Protection Co., Ltd., which is in line with the national hazardous waste management regulations |
meets the |
|
|||
|
|
|
|
|
|
|
|
The investment and construction in the shoreline protection area delineated in the Plan shall not only ensure the safety of flood control, river stability, water supply safety, and protection of the ecological environment; , river stability, water supply security, waterway stability and projects other than the protection of the ecological environment. It is forbidden to invest and construct projects that are not conducive to water resources and natural ecological protection in the river protection areas and reserved areas delineated in the "National Water Function Zoning of Important Rivers and Lakes". (3) It is prohibited to invest and construct within the ecological protection red line, except for the national major strategic resource exploration projects, ecological protection restoration and environmental governance projects, major infrastructure projects, military and national defense projects, and basic production and living projects for farmers and herdsmen. project. In principle, the ecological protection red line is managed according to the requirements of the prohibited development area. (4) It is prohibited to invest in and construct projects within the scope of permanent basic farmland, except for major national strategic resource exploration projects, ecological protection restoration and environmental governance projects, major infrastructure projects, military and national defense projects, and basic production and living projects for farmers and herdsmen. If the site selection of major construction projects is indeed difficult to avoid permanent basic farmland, the conversion of farmland and land acquisition shall be handled in accordance with laws and regulations, and supplementary planning and legal procedures shall be revised in accordance with the requirements of no reduction in quantity, quality, and stable layout. Corresponding overall planning for land use.(5) Prohibition of unauthorized occupation and adjustment of demarcated permanent basic farmland, especially permanent basic farmland around cities, no more permanent basic farmland should be reserved for construction and occupation, and it is strictly prohibited to adjust counties and townships without authorization. The overall plan for land use avoids the approval of occupation of permanent basic farmland, and illegal occupation without approval is strictly prohibited. It is prohibited to build secrets, build houses, build graves, dig sand, quarry, mine, borrow soil, and stack solid waste within the scope of permanent basic farmland. It is forbidden for any unit or individual to destroy the cultivation layer of permanent basic farmland; it is forbidden for any unit or individual to leave idle or barren permanent basic farmland. It is forbidden to illegally occupy permanent basic farmland in the name of facility farmland to construct leisure tourism. Resolutely prevent permanent basic farmland from "non-agriculturalization". (6) Prohibit the construction of the Jinsha River and the first-level tributaries of the Yangtze River unless approved by the Party Central Committee, the State Council, the national investment authority, and the relevant provincial departments. River infrastructure projects. | It does not involve the coastline protection areas delineated in the "Overall Plan for the Protection, Development and Utilization of the Yangtze River Shoreline" and the river section protection areas and reserved areas delineated in the "National Water Function Zoning for Important Rivers and Lakes"; (3) The project is located in Kunming Qidian Industrial Park Kunbao Wire and Cable Manufacturing Co., Ltd., Kunming City, and is not within the scope of the ecological protection red line; (4) The project is located in Kunbao Wire and Cable Manufacturing Co., Ltd., Kunming Qidian Industrial Park, Kunming City, adding a production line to the original factory building and does not involve basic farmland; (5) The project is located in Kunbao Wire and Cable Manufacturing Co., Ltd., Kunming Qidian Industrial Park, Kunming City, adding production lines to the original factory buildings without occupying permanent basic farmland; (6) The project is constructed in Kunming Qidian Industrial Park Kunbao Wire and Cable Manufacturing Co., Ltd., and does not involve Jinsha River and first-class tributaries of the Yangtze River. |
|
|
Various protected areas |
(7) It is prohibited to build any production facilities in the core areas and buffer zones of nature reserves. It is forbidden to build production facilities that pollute the environment, destroy resources or landscapes, and other projects whose pollutant discharge exceeds the national and local pollutant discharge standards in the experimental area of the nature reserve. Activities such as felling, grazing, hunting, fishing, medicine gathering, reclamation, burning, mining, quarrying, and sand dredging are prohibited in nature reserves, unless otherwise stipulated by laws and administrative regulations. (8) Prohibition of planning for scenic spots without prior approval or violation of Various construction activities shall be carried out against the approved scenic area planning. It is prohibited to set up various development zones and |
(7) The project adds production equipment to the original project workshop. The workshop has been completed, and it does not involve nature reserves, nor does it involve activities such as felling, grazing, hunting, fishing, medicine gathering, reclamation, waste burning, mining, quarrying, sand dredging, etc.; (8) The project adds production equipment to the original project workshop. The workshop has been completed. The survey does not involve scenic spots; |
meets the |
|
|
|
|
Invest in the construction of hotels, guest houses, training centers, sanatoriums and other buildings not related to the protection of scenic resources in the core scenic spots. Activities that destroy landscape, vegetation and topography, such as mountain opening, quarrying, mining, wasteland reclamation, tomb building and monument building, etc., are prohibited in scenic spots; it is prohibited to build facilities for storing explosive, flammable, radioactive, toxic and corrosive substances. (9) Prohibit new construction, reconstruction and expansion of projects unrelated to water supply facilities and protection of water sources within the shorelines and river sections of the first-class protected areas for drinking water sources, as well as investment and construction that may pollute drinking water bodies such as cage culture and tourism project. It is prohibited to build, rebuild or expand investment and construction projects that discharge pollutants within the shoreline and river reach of the secondary protection zone for drinking water sources. (10) It is prohibited to build new sewage outlets within the shoreline and river reach of the aquatic germplasm resources protection area, and projects such as reclamation of land around lakes, land reclamation from lakes, or reclamation of river channels. It is prohibited to engage in any construction projects and development activities that do not conform to the main function positioning, such as real estate, resorts, golf courses, wind power generation, photovoltaic power generation, etc. within the scope of the National Wetland Park; Interrupting wetland water sources, dredging sand, mining, and introducing alien species; prohibiting unauthorized grazing, fishing, borrowing soil, water, sewage, and releasing animals; prohibiting other activities that damage wetlands and their ecological functions. | (9) The project is constructed in Kunming Qidian Industrial Park Kunbao Wire and Cable Manufacturing Co., Ltd., and does not involve the first-class protection zone for drinking water sources and the second-class protection zone for drinking water sources; (10) The project is located in Kunming Qidian Industrial Park Kunbao Wire and Cable Manufacturing Co., Ltd. in Kunming City, and does not involve aquatic germplasm resource reserves and national wetland parks. |
|
|
Industrial layout |
(11) It is prohibited to build or expand chemical parks and chemical projects within 1 km of the shoreline of the Jinsha River and the first-class tributaries of the Yangtze River. The newly built chemical park will fully leave a safe distance from the future expansion and development of surrounding towns, and based on the construction direction of the eco-industrial park, promote the development model of green chemistry and green chemical industry. The establishment of the chemical park and the industrial development plan of the park shall be reviewed and approved by experts organized by the provincial business department in charge. (12) Prohibit the construction of non-coal mines that do not meet the relevant access standards for the transformation and upgrading of non-coal mines. Banned on the Jinsha River Shoreline 3 1 km and within 1 km of the shoreline of the first-class tributaries of the Yangtze River, build, rebuild and expand tailings ponds. (13) It is forbidden to build or expand steel, petrochemical, chemical, coking, building materials, non-ferrous metals and other high-polluting projects outside the compliant park. It is forbidden to add new production capacity in industries such as steel, cement, and flat glass. If it is really necessary to build, the production capacity should be replaced by equal or reduced capacity according to regulations. (14) Prohibit the construction or expansion of projects that do not conform to the national petrochemical, modern coal chemical and other industrial layout plans. (15) Prohibit the construction or expansion of backward production capacity projects that are explicitly prohibited by laws, regulations and relevant policies, and eliminate unqualified calcium carbide furnaces, open-type calcium carbide furnaces, and single coking production facilities without chemical recycling in accordance with laws and regulations. The production of pyrite acid, sulfuric acid, yellow phosphorus production, calcium sintered chromium compound production plant and organic-inorganic compound fertilizer, superphosphate and calcium magnesium phosphate fertilizer production line that do not meet the requirements. (16) Prohibit the construction of high-toxicity and high-residue pesticide technical production plants and strict control of urea, ammonium phosphate, Calcium carbide, coke, yellow phosphorus, caustic soda, soda ash, PVC, etc. |
(11) The project is constructed in Kunming Qidian Industrial Park Kunbao Wire and Cable Manufacturing Co., Ltd., and does not involve the Jinsha River and the first-class tributaries of the Yangtze River. This project is for the manufacture of wires and cables, not a chemical project; (12) The project is a wire and cable manufacturing project, and does not involve coal mines and tailings ponds; (13) The project is a wire and cable manufacturing project, and does not belong to high-pollution projects such as steel, petrochemical, chemical, coking, building materials, and non-ferrous metals; (14) The project is a wire and cable manufacturing project, not a petrochemical or modern coal chemical project; (15) The production equipment to be added to the project belongs to the advanced equipment, the technology belongs to the advanced technology, and does not belong to the backward production capacity project; (16) The project is a wire and cable manufacturing project. It does not involve the production of pesticide technical materials with high toxicity and residues and has a great impact on the environment. It does not involve urea, ammonium phosphate, electricity, etc. Stone, coke, yellow phosphorus, caustic soda, |
meets the |
|
|
|
|
Industry added capacity. (17) It is forbidden to relocate and renovate enterprises listed in the "List of Relocation and Reconstruction of Hazardous Chemicals Production Enterprises in Densely Populated Urban Areas of Yunnan Province" to build or expand hazardous chemical production projects at the original site, and strengthen the relocation into the park, closing and exiting enterprises to vacate land pollution Risk control, governance and restoration to ensure that the vacated land is in line with the planned use soil environmental quality standards. |
Soda ash, PVC and other industries; (17) Upon inquiry, the construction unit is not included in the List of Relocation and Reconstruction of Hazardous Chemical Manufacturing Enterprises in Densely Populated Urban Areas in Yunnan Province. |
|
|
||
To sum up, the construction of this project does not violate the "Implementation Rules for the Development of the Negative List of the Yangtze River Economic Belt in Yunnan Province (Trial)", and conforms to the "Implementation Rules for the Negative List for the Development of the Yangtze River Economic Belt in Yunnan Province (Trial)". Table 1-5 is consistent with the "Guidelines for the Development of the Yangtze River Economic Belt Negative List (Trial, 2022 Edition)" |
||||||||
|
serial number | Negative list | The actual situation of the project | compliance |
|
|||
1 |
Prohibit the construction of wharf projects that do not conform to the national and provincial port layout plans and the overall port planning, and prohibit the construction of cross-Yangtze River crossings that do not conform to the "Yangtze River Trunk Line Crossing Channel Layout Plan" channel item. |
This project does not belong to the wharf project, nor does it belong to the project of crossing the Yangtze River. |
meets the |
|
||||
2 |
It is prohibited to invest in the construction of tourism and production and operation projects in the core areas of nature reserves, the shorelines and river sections of buffer zones. It is prohibited to invest in and construct projects unrelated to the protection of scenic resources within the coastlines and river sections of core scenic spots in scenic spots. | The project is not within the shoreline and river reach of the core area of the nature reserve, buffer zone, and the shoreline and river reach of the core scenic area of the scenic spot. |
meets the |
|
||||
3 |
It is prohibited to build, rebuild and expand projects unrelated to water supply facilities and protection of water sources within the shoreline and river reach of the first-class protected area for drinking water sources, as well as investment in cage breeding, livestock breeding, tourism, etc. that may pollute drinking water bodies Construction projects. It is prohibited to build, rebuild or expand investment and construction projects that discharge pollutants within the shoreline and river reach of the secondary protection zone for drinking water sources. |
The project is not within the shoreline and river reach of drinking water source-level protection zones and secondary protection zones. |
meets the |
|
||||
4 |
It is prohibited to build new investment and construction projects such as reclaiming land from lakes, reclaiming land from seas, or reclamation within the shorelines and river sections of aquatic germplasm resources reserves. Sand dredging, mining, and any investment and construction projects that do not meet the main function positioning are prohibited within the shoreline and river reach of the National Wetland Park. | There is no new sewage outlet in this project, no land reclamation from lakes, land reclamation or sea reclamation, and it is not within the shoreline and river reach of the National Wetland Park. |
meets the |
|
||||
5 |
Illegal use and occupation of the shorelines of rivers and lakes in the Yangtze River Basin are prohibited. It is prohibited to invest in the construction of shoreline protection areas and reserved areas delineated in the "Overall Plan for the Protection, Development and Utilization of the Yangtze River Shoreline", except for flood control and bank protection, river management, water supply, ecological environment protection, waterway improvement, Projects other than nationally important infrastructure. It is forbidden to invest and construct in the river sections and lake protection areas and reserved areas delineated in the "National Important Rivers and Lakes Water Function Zoning", which is not conducive to water resources and water resources. Projects for the protection of natural ecology. |
Not involved in this project. |
meets the |
|
|
|
6 |
It is forbidden to build, reconfigure or expand sewage outfalls in the main and tributaries of the Yangtze River and lakes without permission | Not involved in this project. | meets the |
|
|
7 |
Production line fishing is prohibited in "one river, one mouth, two lakes and seven rivers" and 332 aquatic life reserves. | Not involved in this project. | meets the |
|
|||
8 |
It is forbidden to build or expand chemical parks and chemical projects within one kilometer of the main and tributaries of the Yangtze River and the shorelines of important lakes. It is prohibited to build, rebuild or expand tailings ponds, smelting slag ponds and phosphogypsum ponds within 1 km of the shoreline of important tributaries within 3 kilometers of the main stream of the Yangtze River, except for the reconstruction for the purpose of improving the level of safety and ecological environment protection. |
Not involved in this project. |
meets the |
|
|||
9 |
It is forbidden to build or expand high-polluting projects such as steel, petrochemical, chemical, coking, building materials, non-ferrous metals, and pulp and paper outside the compliant park. | This project does not belong to high pollution projects such as steel, petrochemical, chemical, coking, building materials, non-ferrous metals, pulp and paper. |
meets the |
|
|||
10 |
It is forbidden to build or expand projects that do not conform to the national petrochemical, modern coal chemical and other industrial layout plans. | This project does not belong to petrochemical and modern coal chemical projects. | meets the |
|
|||
11 |
Prohibit the construction and expansion of backward production capacity projects that are explicitly prohibited by relevant laws and regulations. It is forbidden to build or expand projects in industries with serious excess capacity that do not meet the national capacity replacement requirements. It is forbidden to build or expand projects with high energy consumption and high emission that do not meet the requirements. | This project does not belong to the backward production capacity project, and does not belong to the serious overcapacity industry project. as well as It does not belong to high energy consumption and high emission projects. |
meets the |
|
|||
12 |
Laws and regulations and related policy documents have stricter regulations. | Not involved in this project. | meets the |
|
|||
In summary, the construction of this project meets the requirements of the "Guidelines for the Development of the Negative List of the Yangtze River Economic Belt (Trial, 2022 Edition"). Table 1-6 Consistency Analysis with "The Yangtze River Protection Law of the People's Republic of China)" |
|||||||
|
serial number |
related information |
The actual situation of the project |
compliance |
|
||
1 |
It is forbidden to deploy industries that have a serious impact on the ecosystem in the key ecological functional areas of the Yangtze River Basin. The transfer of heavily polluting enterprises and projects to the middle and upper reaches of the Yangtze River is prohibited. |
This project is located in the Qidian production area of Yangzonghai, and is not a heavy pollutant enterprise. |
meets the |
|
|||
2 |
It is forbidden to build or expand chemical parks and chemical projects within one kilometer of the shoreline of the main and tributaries of the Yangtze River. | This project is located in the new area of Haikou Industrial Park, Xishan District, about 1.46km away from Yaochong River; this project is a wire and cable manufacturing project, not a chemical project. | meets the |
|
|||
3 |
It is prohibited to build, rebuild or expand tailings ponds within 3 kilometers of the shoreline of the main stream of the Yangtze River and within 1 kilometer of the shoreline of important tributaries; except for the reconstruction for the purpose of improving the level of safety and ecological environment protection. |
This project is located in the Qidian production area of Yangzonghai. It is a wire and cable manufacturing project, not a project of new construction, reconstruction and expansion of tailings ponds. |
meets the |
|
|||
4 |
Strengthen the management of water quotas for high water consumption industries and key water consumption units, and strictly control high water consumption | This project does not belong to high water consumption industries and key water consumption units. | meets the |
|
|
|
|
Project construction |
|
|
|
|||
5 |
It is prohibited to dump, landfill, stack, discard and dispose of solid waste within the management scope of rivers and lakes in the Yangtze River Basin. | This project is a wire and cable manufacturing project. The hazardous waste generated is entrusted to Yunnan Dadi Fengyuan Environmental Protection Technology Co., Ltd. for removal and disposal, and general industrial solid waste is recycled. |
meets the |
|
|||||
6 |
It is forbidden to transport highly toxic chemicals and other dangerous chemicals through inland rivers prohibited by state regulations in the Yangtze River Basin. | The company has signed a hazardous waste removal and disposal agreement with Yunnan Dadi Fengyuan Environmental Protection Technology Co., Ltd. |
meets the |
|
|||||
In conclusion, the construction of this project complies with the requirements of the Yangtze River Protection Law of the People's Republic of China. 7、Environmental Management Policy Compliance Table 1-7 Relevant compliance analysis table |
|||||||||
|
一 |
"Notice on Printing and Distributing the "Comprehensive Control Plan for Volatile Organic Compounds in Key Industries" (Huanqiqi [2019] No. 53) |
Situation of this project |
compliance |
|
||||
1 |
Vigorously promote source substitution |
By using water-based, powder, high-solid, solvent-free, radiation-curing and other low-VOCs-content coatings, water-based, radiation-curing, plant-based and other low-VOCs-content inks, water-based, hot-melt, solvent-free, radiation-curing, modified , biodegradable adhesives with low VOCs content, and cleaning agents with low VOCs content and low reactivity, etc., to replace solvent-based coatings materials, inks, adhesives, cleaning agents, etc., to reduce the generation of VOCs from the source. |
The project does not belong to a key industry, and the amount of ink used in the coding process of this project is relatively small. |
meets the |
|
||||
2 |
Comprehensively strengthen fugitive emission control |
Focus on five categories of VOCs-containing materials (including VOCs-containing raw and auxiliary materials, VOCs-containing products, VOCs-containing wastes, and organic polymer materials, etc.) The emission source is controlled, and the unorganized emission of VOCs is reduced by taking measures such as equipment and site sealing, process improvement, and effective waste gas collection. | In this project, PVC and PE do not generate VOCs without heating. After being collected by the gas collecting hood during the production process, after being treated by the activated carbon adsorption box treatment device, it is discharged from the 15m high exhaust pipe. |
meets the |
|
||||
Improve exhaust gas collection rate. Following the principle of "collecting all receivables and collecting by quality", the waste gas collection system is scientifically designed to convert unorganized emissions into organized emissions for control. |
The project adopts the method of collecting hood to collect organic waste gas. |
meets the |
|
||||||
3 |
Strengthen enterprise operation management |
Enterprises should systematically sort out the main links and procedures of VOCs emission, including start-up and shutdown, inspection and maintenance operations, etc., formulate specific operating procedures, and implement them to specific responsible persons. Improve the internal assessment system. Strengthen personnel capacity training and technical exchanges. Establish a management ledger to record the key parameters of the company's production and pollution control facilities. Online monitoring parameters should be ensured to be available in real time, and relevant ledger records should be kept for at least three years. |
The company has set up an environmental protection management system and formulated a management plan for VOCs prevention and control measures. After the project is completed, it will be incorporated into the existing management system. |
meets the |
|
|
|
|
|
|
|
|
|
二 |
"Notice on Printing and Distributing the 2020 Volatile Organic Compound Control Plan" (Huanqiqi [2020] No. 33) | Situation of this project | compliance |
|
|||
|
|
||||||
|
|
Strictly implement the national and local product VOCs content limit standards. |
This project strictly implements the national and local product VOCs content limit standards. |
meets the |
|
||
|
Vigorously promote source substitution, | Promote the replacement of raw and auxiliary materials with low (no) VOCs content. Enterprises should establish a raw and auxiliary material ledger to record the name, composition, VOCs content, purchase amount, usage, inventory, recycling method, recycling amount and other information of VOCs raw and auxiliary materials, and keep relevant certification materials. If the paints, inks, adhesives, etc. that comply with the national regulations on products with low VOCs content are used, the emission concentration is stable and the emission rate meets the relevant regulations, and the corresponding production process does not require the construction of end treatment facilities. For processes where the VOCs content (mass ratio) of the raw and auxiliary materials used is less than 10%, fugitive emission collection and treatment measures may not be required. |
In the coding process of the project, inks with low VOCs content are used, and the amount of use is small, and a raw and auxiliary material ledger is established to record the name, composition, VOCs content of VOCs raw and auxiliary materials, purchase amount, usage amount, inventory amount, recycling method, and recycling amount. and other information, and keep relevant supporting materials. |
|
|
||
|
|
||||||
|
|
||||||
1 |
Effectively reduce the production of VOCs, fully implement the standard requirements, strengthen the |
meets the |
|||||
|
|
||||||
|
|
||||||
|
|
||||||
|
Implement and implement the "Volatile Organic Compound Emission Control Standards"; formulate VOCs fugitive emission control procedures, detailing specific processes and production links, as well as start-up and shutdown, inspection and maintenance operations, etc., and implement them to specific responsible persons; Improve the internal assessment system , produced in strict accordance with the operating procedures. | The project implements and implements the "Volatile Organic Compound Emission Control Standard", and formulates the volatile organic compound fugitive emission control regulations. |
meets the |
|
|||
|
|
||||||
|
|
||||||
|
|
||||||
|
|
||||||
|
The storage link should use airtight containers, packaging bags, high-efficiency sealed storage tanks, closed storage warehouses, silos, etc. The loading and unloading, transfer and conveying links should use closed pipelines or closed containers, tankers, etc. | The raw and auxiliary materials used in this project are stored in airtight packaging drums. |
meets the |
|
|||
|
|
||||||
|
|
||||||
|
|
||||||
|
The production and use links should use closed equipment, or operate in a closed space and effectively collect waste gas, or conduct local gas collection; the container should be closed when not in use. In the disposal process, the packaging containers containing VOCs materials, waste adsorbents containing VOCs (slag, liquid), etc. should be sealed by capping, packaging, etc., and stored properly, and should not be discarded at will. | The organic waste gas produced by extrusion and injection molding is collected locally by the gas collecting hood. waste ink bucket , and other contaminated wastes are entrusted to Yunnan Dadi Fengyuan Environmental Protection Co., Ltd. for disposal as hazardous waste. |
|
|
|||
|
meets the | ||||||
|
|
||||||
2 |
Organize emission control to improve comprehensive management efficiency |
|
|||||
|
|
||||||
The collection, transportation, storage and treatment of wastewater with high VOCs content should be covered and sealed. If there are more than 2,000 sealing points of equipment and pipeline components containing gaseous and liquid VOCs materials in the enterprise, a comprehensive ledger should be established; petroleum refining, petrochemical, and synthetic resin enterprises should carry out development in strict accordance with the requirements of emission standards LDAR work, strengthen the inspection of standby pumps, pumps in use, regulating valves, agitators, open pipelines, etc., and strengthen quality control; VOCs treatment facilities and The sealing point of the tank is included in the inspection plan. |
|
|
|
||||
|
|
|
|||||
|
|
|
|||||
|
This project does not produce waste water with high VOCs content; there are no gaseous and liquid VOCs materials. |
meets the |
|||||
|
|
|
|||||
|
|
|
|||||
|
|
Enterprises in petrochemical, chemical, coal chemical, pharmaceutical, pesticide and other industries should strengthen VOCs emission control during start-up and shutdown, as well as in cleaning, material returning, purging, venting, drying and other links to ensure that the standard requirements are met. The anti-corrosion, waterproof and anti-rust coating of enterprise production facilities should avoid summer or use low VOCs content coatings. | Contaminated wastes such as waste ink drums used in this project are entrusted to Yunnan Dadi Fengyuan Environmental Protection Co., Ltd. for disposal as hazardous waste. |
meets the |
|
||
|
|
|
|||||
|
|
|
|||||
|
|
|
|||||
|
|
|
|
|
|
|
|
|
|
|
3 |
Focus on the "three rates" of pollution control facilities to improve the efficiency of comprehensive treatment |
Replace or upgrade the VOCs collection and treatment facilities that fail to meet the requirements to ensure compliance with emission standards. In addition to odor control, generally do not use low Warm plasma, photocatalysis, photooxidation and other technologies. |
Replace or upgrade the VOCs collection and treatment facilities that fail to meet the requirements to ensure compliance with emission standards. In addition to odor control, generally do not use low Warm plasma, photocatalysis, photooxidation and other technologies. |
meets the |
|
||
Increase the exhaust gas collection rate in accordance with the principle of "collect as much as possible". Promote the cancellation of the bypass of the exhaust gas emission system. If it must be retained due to safety production and other reasons, the list of retained bypass should be reported to the local ecological environment department. Strengthen supervision by means of planning and other methods, and promptly report to the local ecological environment department after opening. Report and keep records. |
The organic waste gas generated by the extrusion and injection molding process of this project is collected locally by the gas collecting hood. No exhaust system bypass. |
meets the |
|
||||
Transform unorganized emissions into organized emissions for control, preferably using closed equipment, operating in a closed space or using a fully closed gas collecting hood for collection; for those using partial gas collecting hoods, the collection point should be reasonably selected according to the characteristics of exhaust gas emissions , the farthest VOCs fugitive emission position from the opening surface of the gas collecting hood, the control wind speed is not less than 0.3m/s, which does not meet the requirements Timely renovation by replacing high-power fans, adding flue fans, and adding vertical curtains. |
The project adopts the gas collecting hood for local collection, and the VOCs fugitive emission position farthest from the opening surface of the gas collecting hood is controlled to control the wind speed to be greater than 0.3m/s. |
meets the |
|
||||
Improve the operation rate of treatment facilities in accordance with the principle of "starting and stopping at the same time" with production equipment. According to the requirements of the treatment process, the production equipment can be started only after the treatment facility reaches the normal operating conditions, and the treatment facility can be shut down only after the production equipment is stopped and the residual VOCs waste gas is collected and treated. | The VOCS waste gas collection and treatment system of the project runs synchronously with the production process equipment. After the production process equipment stops running, the VOCS waste gas collection and treatment system can stop running. Row. |
meets the |
|
||||
When an enterprise builds new pollution control facilities or implements renovations on existing pollution control facilities, a reasonable selection of control technologies should be made based on the characteristics of exhaust gas, VOCs components and concentrations, and production conditions. A combination of multiple techniques is used. If activated carbon adsorption technology is adopted, activated carbon with an iodine value of not less than 800 mg/g should be selected, and a sufficient amount should be added and replaced in time according to the design requirements, and the replacement time and usage amount should be recorded. | The project uses an activated carbon adsorption box to treat organic waste gas, and the selected activated carbon has an iodine value of 800 mg/g. This evaluation requires the enterprise to replace the activated carbon every 3 months, and record the replacement time and usage. |
meets the |
|
||||
三 |
"Implementation Plan for Comprehensive Treatment of Volatile Organic Compounds in Key Industries in Yunnan Province" |
Project Status |
compliance |
|
|||
1 |
Vigorously promote source substitution. By using water-based, powder, high-solid, solvent-free, radiation-curing and other low-VOCs content coatings, water-based, radiation-curing, plant-based and other low-VOCs content inks, water-based, hot-melt, solvent-free, radiation-curing, modified , biodegradable adhesives with low VOCs content, and cleaning agents with low VOCs content and low reactivity, etc., to replace solvent-based coatings, inks, Adhesives, cleaning agents, etc., reduce the generation of VOCs from the source. |
This project does not belong to key industries. This project uses less ink in the coding process. |
meets the |
|
|||
2 |
Comprehensively strengthen fugitive emission control. Focus on the storage, transfer and storage of VOCs-containing materials (including VOCs-containing raw and auxiliary materials, VOCs-containing products, VOCs-containing wastes, and organic polymer materials, etc.) | The raw materials of the project are stored in sealed bags before use. The organic waste gas of this project is collected through gas collection. |
meets the |
|
|
|
|
Five types of emission sources such as transportation, leakage of equipment and pipeline components, open liquid surface escape, and technological processes are controlled and controlled, and the unorganized emissions of VOCs are reduced by taking measures such as equipment and site sealing, process improvement, and effective waste gas collection. | After the hood is collected, it enters the activated carbon adsorption device for treatment and is discharged by three 15m high exhaust pipes. |
|
|
|||
3 |
Promote the construction of suitable and efficient pollution control facilities. When an enterprise builds new pollution control facilities or implements renovation of existing pollution control facilities, the control technology should be reasonably selected according to the concentration, composition, air volume, temperature, humidity, pressure, and production conditions of the exhaust gas. Encourage enterprises to adopt a combination of various technologies to improve the efficiency of VOCs treatment. |
The project belongs to the expansion project. By adopting the measures of replacing the old with the new, the generated organic waste gas is collected and processed by the activated carbon adsorption box, and then discharged through three exhaust pipes with a height of 15m. |
meets the |
|
|||||
After analysis and comparison, this project complies with the requirements of the above relevant environmental management policies. 8、Site selection rationality analysis The project is a wire and cable manufacturing project. It is located in Qidian Industrial Park, Kunming. It is an industrial land. The infrastructure construction of the park is complete. After taking corresponding environmental protection measures, the waste gas generated by the project has little impact on the surrounding environment. The waste water is discharged into the park pipe network after treatment, which has little impact on the surrounding surface water environment. All can be properly disposed of and the project is compatible with the surrounding environment. At present, the surrounding environment of the project is of good quality, with well-constructed infrastructure such as water and electricity, and the external environment is relatively simple, and there are no major environmental constraints. There are no cultural relics, scenic spots, historic sites and cultural and natural heritages that need special protection around the construction land, and they do not belong to the protection scope of nature reserves and scenic spots. Table 1-8 List of surveys on pollution sources of surrounding enterprises of the project |
|||||||||
|
Company Name |
Relationship to project location |
Main business |
position |
major air pollutants |
|
|||
Yunnan Tianqi Green Food Development Co., Ltd. |
135m |
Prepackaged food sales; Vegetable products, roasted seeds and nuts, nut products, squares |
southeast |
particulates |
|
|
|
|
|
instant food processing |
|
|
|
Kunming Gao Shang Gao Food Co., Ltd. |
157m |
Meat products, agricultural and sideline products acquisition and processing and cold storage services; |
southwest |
Particulate matter, SO2, NOx |
|
||
|
|
Dendrobium and other Chinese herbs |
|
|
|
||
Yunnan Jinjiudi Biotechnology Co., Ltd. |
131m |
Planting, development and sales of medicinal materials; wholesale of Chinese medicinal materials and proprietary Chinese medicines; medicine |
south |
particulates |
|||
|
|
Manufacturing, pharmaceutical distribution; |
|
|
|||
Qidian Industrial Park Management Committee |
245m |
administration | southeast |
/ |
|
||
Kunming Dingyue Plastic Products Co., Ltd. |
35m |
Production and processing of plastic products, supply and marketing of materials | north | Particulate matter, organic waste gas |
|
||
Sanchuan Cable Group |
160m |
Wire and cable manufacturing |
northwest |
Particulate matter, organic waste gas |
|
||
|
|
Copper, Nickel and Their Alloys Casting |
|
|
|
||
Chinalco Kunming Copper |
260 |
Manufacturing, processing products, selling sales, inspection, research and development, |
north |
Particulate matter, SO2, NOx |
|||
|
|
Promotion and Consulting Services |
|
|
|||
It can be seen from the investigation of the surrounding enterprises of the project that the surrounding enterprises have no restrictive factors to the project. The main pollutants of the project are exhaust gas, solid waste and noise. Production and processing enterprises have little impact on surrounding enterprises. In conclusion, the project is compatible with the surrounding environment. |
Table 2. Engineering analysis of construction projects
Construction Content |
||||||
1. Origin of the project Kunming Kunbao Wire and Cable Manufacturing Co., Ltd. is a private enterprise specializing in the production of various wires and cables. In June 2009, the company rented a temporary workshop in Shiba Village, Ala Street Office, Kunming Economic and Technological Development Zone for production. At the beginning of 2013, the company was located in Kunming. In June 2014, the company entrusted Kunming University of Science and Technology to compile the Environmental Impact Report Form for the Relocation of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd. Reply to Kunbao Wire and Cable Manufacturing Co., Ltd. Environmental Impact Report Form for Relocation and Technical Transformation Project (Kunbaofu [2014] No. 319). Construction began in September 2014, and it was completed and put into operation in October 2015. Due to changes in some project contents and production processes during the construction process, the project contents, production processes, pollution production links, pollution control measures and pollutant discharges were all different from those of the project. The original EIA report and its approval requirements have changed. In November 2017, Kunming Kunbao Wire and Cable Manufacturing Co., Ltd. entrusted Beijing Guohuan Tsinghua Environmental Engineering Design and Research Institute Co., Ltd. to compile the "Environment of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd. Relocation Technical Transformation Project" In January 2018, the Kunming Environmental Protection Bureau approved the “Supplementary Report on the Environmental Impact of the Relocation Project of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.” (Kunhuaufufu [2018] No. 9). In order to meet the needs of market development, the construction unit purchased some new production equipment to expand the production capacity, and used the vacant area of the existing workshop for construction, without involving the construction of new workshops and structures. The total investment is 80 million yuan to add more than 20 production equipment. After the project is completed, 30km of mining mobile metal shielded monitoring type rubber sheathed flexible cable, 800km of photovoltaic low-voltage aluminum alloy cable, 600km of photovoltaic DC cable, and 500km of special rubber sheathed cable for electric welding machine will be added. Improve the company's wire and cable manufacturing level and production capacity. According to the relevant regulations of the "Environmental Impact Assessment Classification Management Catalogue of Construction Projects" (2021 Edition), this project belongs to "Others" in "35. Electrical Machinery and Equipment Manufacturing; 77-Wire, Cable, Optical Cable and Electrical Equipment Manufacturing 383" ” (except for splitting, welding, and assembly; except for non-solvent-based low VOCs content paints with an annual use of less than 10 tons), so this project should prepare an environmental impact report form. According to relevant regulations, field investigations were carried out on the surrounding environmental conditions of the project construction site, relevant local environmental data were collected and verified, and the "Kunming Kunbao Wire and Cable Manufacturing Co., Ltd. Green New Energy Cable Production Line Construction Project Report was compiled in accordance with the relevant technical specifications of environmental impact assessment." Form" for the construction unit to submit for approval. 2. Construction content and scale (1) Main project content |
|
In order to improve the overall manufacturing level and production capacity of the company's wires and cables, the expansion project has added supporting production equipment of the original project, and added more than 20 sets of main production equipment. The public works rely on the supporting facilities of the original project. The specific project construction content is shown in Table 2-1. Table 2-1 List of main project contents of the project |
||||||
|
Project composition |
name |
Construction content and scale |
Remark |
|
||
structural work |
1# Factory |
Conductor workshop |
The conductor semi-finished products for the production of wire and cable are only simply twisted, and the wire and cable are not outsourced. This time, 1 large aluminum alloy wire drawing machine, 1 continuous annealing copper large wire drawing machine, 1 wire harnessing machine, and frame type are added. 2 stranding machines, 1 bow stranding machine |
new |
|
||
2# workshop |
cable workshop |
In the non-independent operation room, 1 new cable forming machine, steel tape armoring machine, SJ120 plastic extruder, SJ90 plastic extruder, horizontal high-speed braiding machine, 630 single stranding machine, 36 type braiding machine, 60 type Metal argon arc welded pipe unit |
new |
|
|||
wire workshop |
In the non-independent operation room, the new SX-150/16 rubber extruder, SX-120+90/16 type rubber extruder, SX-70/16 type rubber extruder, JXL-150+90+ 65 type rubber extruder, JXL-65+45 type rubber extruder, GJ-630 bow stranding machine |
new |
|
||||
Auxiliary Engineering |
Dormitory, canteen, office |
The building area is 40565.85m2, |
rely on |
|
|||
public works |
water supply |
Municipal water supply network supply. |
rely on |
|
|||
drain |
Rainwater and sewage are separated; rainwater is discharged into the rainwater pipe network of the park; domestic wastewater is discharged into the sewage treatment plant in Chenggong Industrial Park. |
rely on |
|
||||
powered by |
The industrial park has built a complete power supply system, and the power supply of the project is introduced from the 10kV branch line outside the area into the transformation and distribution room in the area. The voltage in the transformation and distribution room is 380V/220V, and the 50Hz low voltage is used by each unit in the enterprise |
rely on |
|
||||
heating |
The living facilities of the project use solar energy; the kitchen uses liquefied gas and electricity; |
rely on |
|
||||
fire |
The fire water of the project is supplied by the regional main pipe, and outdoor fire hydrants are set on the annular pipe network. The spacing is not more than 150m, and the valve wells are set up according to the specifications to make the necessary separation, which can ensure the requirements of fire water. |
rely on |
|
||||
Storage and transportation engineering |
Finished product warehouse |
Vacant area on the north side of the 2# factory building |
rely on |
|
|||
Raw material library |
2# The raw material warehouse on the east side of the plant |
rely on |
|
||||
Environmental Engineering |
Grease Trap | Volume 5m3, located outside the canteen |
rely on |
|
|||
septic tank | 7 septic tanks with a volume of 10m³ have been constructed | ||||||
greening | 8647.58m2 | ||||||
Garbage room |
The west side and south side of the 1# workshop are respectively provided with domestic garbage sorting and collection bins |
||||||
Kitchen fume control facilities |
kitchen fume purifier |
||||||
General solid waste temporary storage room |
There is a 20m2 solid waste temporary storage room on the west side of the 2# workshop |
||||||
Hazardous waste temporary storage room |
Covers an area of 20m2 |
new |
|
||||
Waste gas treatment facilities |
A 15m exhaust tube, a set of three-stage activated carbon adsorption device, and two gas collecting hoods were added in the cable workshop, and a 15m exhaust tube, a set of three-stage activated carbon adsorption device, and a gas collecting hood were added in the wire workshop. |
new |
|
Table 2-3 Comparison list of products and capacity before and after expansion
This project mainly adds 20 production equipments, and other equipments will use the original equipments. Major expansion projects
The equipment is shown in Table 2-4 below, and the equipment changes before and after the expansion are shown in Table 2-5 below.
Table 2-4 List of main equipment of this expansion project
|
|
|
noise |
Use low-noise equipment, vibration reduction and sound insulation, and noise reduction measures. |
new |
|
|||
According to the information provided by the construction unit, most of the equipment for the production of wires and cables is general equipment, and it is only the difference in the production link. Therefore, among the various products produced by this expansion project, there is no clear production line boundary. According to the needs of customers, production equipment is used to produce different products. After the project is completed, a new 30km/a flexible cable of mine-use mobile metal shielded monitoring type rubber sheath is added. , PV low-voltage aluminum alloy cable 800km/a, PV DC cable 600km/a, special rubber sheathed cable for electric welding machine 500km/a, see Table 2-2 for details, see Table 2-3 for changes in production capacity after the expansion . Table 2-2 Product scheme of this expansion project |
|||||||||
|
serial number |
device name |
Specifications |
quantity |
|
||||
1 |
Continuous annealing copper wire drawing machine |
LH0-450/11KT |
1 |
|
|||||
2 |
Aluminum alloy large wire drawing machine |
LH0-450/13 |
1 |
|
serial number |
Product number |
product name |
new capacity |
1 |
MYPTJ |
Mine mobile metal shielded monitoring rubber sheathed flexible cable (8.7/10) KV |
30 |
2 |
ZC-YJLHV22 |
Photovoltaic low voltage aluminum alloy cable (1.8/3) KV |
800 |
3 |
PV1-F |
Photovoltaic DC cable 1.8KV |
600 |
4 |
YH |
Special rubber sheathed cable for electric welding machine (0.45/0.75) KV |
500 |
serial number |
name |
production capacity |
unit of measurement |
|||
original approval |
new |
Whole plant capacity |
increase or decrease |
|||
1 |
Steel core aluminum stranded wire |
1600 |
/ |
1600 |
0 |
t/a |
2 |
Steel core aluminum alloy stranded wire |
540 |
/ |
540 |
0 |
t/a |
3 |
Overhead Insulated Cables (1KV and 10KV) |
380 |
/ |
380 |
0 |
t/a |
4 |
XLPE insulated power cable |
150 |
/ |
150 |
0 |
t/a |
5 |
PVC insulated power cable |
220 |
/ |
220 |
0 |
t/a |
6 |
Control cable (polyvinyl chloride insulated control cable, cross-linked polyvinyl chloride insulated control cable) |
220 |
/ |
220 |
0 |
t/a |
7 |
PVC insulated wire (fire-resistant, flame-retardant series) |
4280 |
/ |
4280 |
0 |
t/a |
8 |
Mine mobile metal shielded monitoring rubber sheathed flexible cable (8.7/10) KV |
/ |
30 |
30 |
+30 |
km/a |
9 |
Photovoltaic low voltage aluminum alloy cable (1.8/3) KV |
/ |
800 |
800 |
+800 |
km/a |
10 |
Photovoltaic DC cable 1.8KV |
/ |
600 |
600 |
+600 |
km/a |
11 |
Special rubber sheathed cable for electric welding machine (0.45/0.75) KV |
/ |
500 |
500 |
+500 |
km/a |
|
|
3 |
Beaming machine |
JGGB-400/6 |
1 |
|
|||||
4 |
Frame Stranding Machine |
JLK-630/12+18+242# |
2 |
|
|||||||
5 |
bow winch |
JGGB-630/6 |
1 |
|
|||||||
6 |
Horizontal high-speed braiding machine |
HGSB-16A |
1 |
|
|||||||
7 |
Cable forming machine |
1250/1+6 |
1 |
|
|||||||
8 |
Metal argon arc welded pipe unit |
DAG60/180 |
1 |
|
|||||||
9 |
Steel tape armoring machine |
800 type |
1 |
|
|||||||
10 |
plastic extruder |
SJ90 |
1 |
|
|||||||
11 |
single twister |
GJ-630 |
1 |
|
|||||||
12 |
weaving machine |
36 type |
1 |
|
|||||||
13 |
Extruder |
SJ-120/25 |
1 |
|
|||||||
14 |
rubber extruder |
SX-150/16 type |
1 |
|
|||||||
15 |
rubber extruder |
SX-120+90/16 type |
1 |
|
|||||||
16 |
rubber extruder |
SX-70/16 type |
1 |
|
|||||||
17 |
rubber extruder |
JXL-150+90+65 |
1 |
|
|||||||
18 |
rubber extruder |
JXL-65+45 |
1 |
|
|||||||
19 |
bow winch |
GJ-630 |
1 |
|
|||||||
表 2-5 本扩建项目主要设备一览表 |
|||||||||||
|
serial number |
Production equipment |
Model Specifications |
Before expansion |
after expansion |
Changes |
|
||||
1 |
Copper middle drawing machine |
ZL-280/17 |
1 |
1 |
constant |
|
|||||
2 |
Aluminum alloy large drawing machine |
LT-450/13 |
1 |
1 |
constant |
|
|||||
3 |
Pipe stranding machine |
JG-400/1+6 |
1 |
1 |
constant |
|
|||||
4 |
Pipe stranding machine |
JG-630/1+6 |
1 |
1 |
constant |
|
|||||
5 |
fork winch |
JC-400/12+18+24 |
1 |
1 |
constant |
|
|||||
6 |
Stranding machine |
JP-200/6+12 |
1 |
1 |
constant |
|
|||||
7 |
Stranding machine |
JP-12/6+12+18 |
1 |
1 |
constant |
|
|||||
8 |
cage winch |
JL-500/12+18 |
1 |
1 |
constant |
||||||
9 |
Rewinder |
400/500 |
1 |
1 |
constant |
|
|||||
10 |
Frame stranding machine |
JK-630/6+12+18+24 |
1 |
1 |
constant |
|
|||||
11 |
plastic extruder |
SJ-65 |
2 |
2 |
constant |
|
|||||
12 |
plastic extruder |
SJ-90 |
1 |
1 |
constant |
|
|||||
13 |
plastic extruder |
SJ-70+30 |
3 |
3 |
constant |
|
|||||
14 |
plastic extruder |
SJ-80 |
1 |
1 |
constant |
|
|||||
15 |
Cable forming machine |
JC-1250/1+1+3 |
1 |
1 |
constant |
|
|||||
16 |
Locking type armoring machine |
LZKH-100 |
1 |
1 |
constant |
|
|||||
17 |
Cross-linked cable production line |
CCV-80+175+100 |
4 |
4 |
constant |
|
|||||
18 |
Copper tape shielding machine |
PRT-600 |
1 |
1 |
constant |
|
|||||
19 |
Disc cable forming machine |
JPD-3150 |
1 |
1 |
constant |
|
|||||
20 |
Cable forming machine |
JC-1250/2+3 |
1 |
1 |
constant |
|
|||||
21 |
24 Ingot metal braiding machine |
HGSB-24 |
1 |
1 |
constant |
|
|||||
22 |
16 Ingot metal braiding machine |
HGSB-16 |
3 |
3 |
constant |
|
|||||
23 |
Mica strapping machine |
TRBW-630 |
1 |
1 |
constant |
|
|||||
24 |
Elevator or Hoist |
Fuji |
1 |
1 |
constant |
|
|||||
25 |
Rewinder |
500/630 |
2 |
2 |
constant |
|
|||||
26 |
Partial discharge test system |
SR-2000/2500KVA |
1 |
1 |
constant |
|