Environmental Impact Report Form of Construction Project

2022-08-02

Environmental Impact Report Form of Construction Project

 Directory

Basic Information of 1. Construction Projects ............................................................. Error! No bookmarks defined.

Engineering analysis of 2. construction projects ............................................................................. 19

3. regional environmental quality status, environmental protection objectives and evaluation criteria

Major 4. Environmental Impacts and Protection Measures

List of Supervision and Inspection of 5. Environmental Protection Measures ............................................................................. 79

6. Conclusion ..................................................................................................................... 81

Schedule:

Attached Table 1 Summary of Pollutant Emissions of Construction Projects Attachment:

Attached Drawing:

Figure 1: Geographic Location of the Project

Attached Figure 2: Location of Project Surrounding Relationship

Figure: 3: Water system diagram of the Project

Attached Drawing 4: Layout Diagram of Plant Area

Attached Drawing 5: Plane Layout of Conductor Car/Cable Workshop

Attached Drawing 6: Layout Plan of Wire Workshop

Attached Drawing 7: Layout of Ambient Air Status Monitoring

Attached Figure 8: Location Relation Diagram of the Project and Yangzonghai Reserve

Attachments:

Annex 1: Project Power of Attorney

Annex 2: Project Investment Record Certificate

Annex 3: Project Business License

Annex 4: Approval of EIA for Relocation Technical Transformation Project of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.

Annex 5: Official Reply of Environmental Impact Supplementary Report on Relocation and Technical Transformation Project of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.

Annex 6: Acceptance Opinions on Environmental Protection Acceptance of the Relocation Technical Transformation Project of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.

Appendix 7: Monitoring Report Entrusted by Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.

Annex 8: Monitoring Report on Environmental Status of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.

Annex 9: Entrustment Agreement for Hazardous Wastes

Annex 10: Yunnan Municipal Environmental Protection Bureau on the "Kunming Yangzonghai Regional Master Plan (2010-2020)

Review Opinions of the Environmental Impact Report

Annex 11: Level 3 Audit Table

Annex 12: Screenshot of Pre-trial Publicity

Table 1. Basic information of construction projects

Name of construction project

Kunming Kunbao Wire and Cable Manufacturing Co., Ltd. Green New Energy Cable Production Line Construction Project

Project Code

2205-530133-23-02-862812

CONSTRUCTION UNIT CONTACT
People

Yao Wei

Contact Information

18088266790

Construction site

Kunming Yangzonghai Scenic Area Qidian Industrial Park Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.

geographical coordinates

East longitude 102 degrees 55 minutes 13.766 seconds, north latitude 24 degrees 57 minutes 54.129 seconds

 

Industry category of national economy

 

C3831 Wire and cable manufacturing

 

Industry category of construction project

Thirty-five, electrical machinery and equipment manufacturing 38-77, wire and cable, optical cable and electrical equipment manufacturing 383-other (except for segmentation, welding, assembly only;
Except for coating with a content of less than 10 tons)

 

Nature of construction

  • New (Relocation
  • Alteration

R Expansion

  • technical transformation

)
Declaration of construction project

R first declaration project

  • Report the project again after disapproval
  • Over five years to re-audit the project
  • Major Change Reapproval Project

 

Project ApprovalApproval
/Filing) department

Yangzonghai Scenic Area Management Committee
Economic Development Bureau

 

Project Approval (Approval/Filing) Document No.

 

2205-530133-23-02-862812

Total investment
($million)

8000

Environmental Protection Investment (RMB 10,000)

54

Proportion of Environmental Protection Investment
%)

0.675%

Construction period

September 2022-October 2022

 

Whether to start construction

R No

  • Yes:

 

Land area (m2)

 

40565.85m2

 

Setting of special evaluation

According to the Technical Guidelines for the Preparation of Environmental Impact Report Forms for Construction Projects (Pollution Impact) (for Trial Implementation)
Table 1 determines whether to set up a project-specific evaluation.
Table1-1Special evaluation setting principle table

 

Special evaluation
Category

Setting Principles

Situation of the Project

Special evaluation
Setting

 

Atmosphere

Exhaust gases containing toxic and harmful pollutants 1 and 2
Dioxins, benzo [a] pyrene, cyanide, chlorine

The waste gas emitted by the project is not toxic or harmful.
Pollutants, dioxins, benzo [a] pyrene, cyanogen

do not set

 

 

 

 

And there is environmental air within 500 meters outside the factory boundary.

chlorine, so the project does not need to be carried out.

 

 

Construction projects for gas protection objective 2

Special evaluation of atmosphere.

 

 

Project cooling water recycling, no production waste

 

 

 

New industrial wastewater direct discharge construction project (tank

Aquatic production, the domestic wastewater of the staff is produced by the production area.

 

Surface water

except that the tanker is sent to the sewage treatment plant);

After treatment, the cesspool is discharged into the sewage of Qidian District.

do not set

 

New centralized wastewater treatment plant with direct wastewater discharge

Therefore, this evaluation of surface water will not be carried out.

 

 

 

Special evaluation.

 

 

Environmental risk

Construction projects with storage capacity of toxic, harmful and inflammable and explosive hazardous substances exceeding critical quantity 3

After analysis, the storage capacity of hazardous substances in this project
The total amount does not exceed the critical amount, so no special environmental risk assessment is carried out.

 

do not set

 

 

Ecology

Natural spawning grounds, feeding grounds, overwintering grounds and newly-added river channels with important aquatic organisms within 500 m downstream of the water intake.
Water pollution construction project

Water for this project is supplied by the park pipe network, no.
,
Involving river water intake, so do not carry out ecological specialization.
evaluation.


 

do not set

 

 

Ocean

Marine engineering construction projects that discharge pollutants directly into the sea

This project does not belong to marine engineering and does not involve
Discharge of pollutants to the sea, so no special marine assessment is carried out.

 

do not set

 

Note: 1. The indicators of toxic and harmful pollutants in exhaust gas are included in the List of Toxic and Harmful Air Pollutants (excluding

 

pollutants without emission standards).

2. Ambient air protection targets refer to the population in nature reserves, scenic spots, residential areas, cultural areas and rural areas.

concentrated area.

3. The critical quantity and its calculation method can refer to the Technical Guidelines for Environmental Risk Assessment of Construction Projects (HJ169) Appendix B,

Appendix C.

 

Planning situation

  1. Plan name:Overall Planning of Yangzonghai Area in Kunming (2010-2020);
  2. Approval Authority:Kunming Municipal People's Government
  3. Review document name and document number:Reply on Kunming Yangzonghai Regional Master Plan (2010-2020), Kun Zheng Fu [2012] No. 85.

 

Planning Environmental Impact Assessment

  1. Planning EIA Name:Environmental Impact Report of Kunming Yangzonghai District Master Plan (2010-2020);
  2. Review Authority:Kunming Environmental Protection Bureau;
  3. Review document name and document number:Letter of Kunming Environmental Protection Bureau on Provincial Investigation Opinions on Environmental Impact Report of Kunming Yangzonghai District Master Plan (2010-2020)

 

Conformance analysis of planning and planning environmental impact assessment

1Planning compliance analysis
(1) Planning and development orientation: The overall development of Kunming Yangzonghai District is an internationally renowned eco-cultural tourism leisure resort with the premise of plateau lake management and protection, and the leading functions of leisure, health preservation and vacation.
Qidian Industrial Planning Zone-New Kunming Green Industry and Tourism Equipment R & D and Manufacturing Industrial Base, Main
To develop industries for food, medicine, textiles, materials and other low-carbon green industries.


Tangchi Tourism Town-a holiday and leisure town with the functions of vacation tourism, hot spring recuperation, business meeting and mountain leisure residence.

Yangzong tourist town-a characteristic folk culture town formed by focusing on ecological environment protection and restoration construction, combined with local folk culture.

Meadow tourist town-Yangzonghai regional center, a comprehensive service town with tourism services, administrative offices and urban supporting facilities.

Tourism and vacation circle around the lake-a characteristic coastal sports and leisure tourism circle with the functions of tourism and vacation, leisure sports, hot spring recuperation, business meetings and so on.

(2) Planning and development goals: Fully grasp the opportunity of Kunming's bridgehead status, give full play to the superior geographical location and natural resources of Yangzonghai, take the ecological environment as the lifeblood, take the transportation network as the basis, and vigorously implement the full coverage of the plan, strong ecological governance, and industrial layout, Regional urbanization, and strive to build Yangzonghai Scenic Area into an international high-end tourist resort, tourist equipment manufacturing base, and urban boutique agricultural sightseeing exhibition area for 10 years, regional urbanization development experimental area, natural ecological livable area, build an international eco-tourism area with reasonable planning and layout, perfect infrastructure, concentrated industrial development, complete urban functions, beautiful and pleasant environment, and unique regional characteristics. It has become a new business card for the charm of Kunming's leisure and vacation, a new benchmark for ecological and environmental protection, a new model for living and working, and a new model for urban and rural coordination.

(3) Regional planning structure

The regional planning combines the Yangzonghai Scenic Area to determine the strategy of "axis series, segmented growth, and multi-group agglomeration", and generally forms a group layout structure of "one core, one garden, three towns, and one circle.

"One Core": refers to the landscape core of Yangzonghai Sea, I .e. the area within 100 meters of the horizontal extension along the waters of Yangzonghai Sea and the maximum operating water level of 1769.9 meters (1985 to the national elevation benchmark); "One Park": refers to the Qidian Industrial Planning Area, which is the sub-central area of the region. As the focus of recent development and construction, it will build a low-carbon industrial planning area suitable for living as a whole, transform and relocation, transform and relocate, optimize and upgrade, promote the development and construction of ecological economy and highlight the functions of life, production and service; "Three towns": including Tangchi tourist town, meadow tourist town and Yangzong tourist town, of which Tangchi tourist town is an important waterfront tourist city in the region and will be built into an international hot spring recuperation and leisure vacation base; meadow tourist town as the regional center; Yangzong tourist town is a concentrated area of eco-tourism service facilities, it mainly focuses on folk culture, life and residence, characteristic tourism and other functions; "one circle": refers to the tourism and holiday circle around the lake with Yangzonghai as the core and connected by the landscape road around the lake and the expressway. Tourism vacation, leisure sports,

 

Spa recuperation, business meetings and other functions.
The project is located in Kunming kunbao wire and cable manufacturing co., ltd., qidian industrial park, yangzonghai scenic spot, kunming kunming kunbao wire and cable manufacturing co., ltd., which is in line with the development orientation of qidian industrial planning area and the development of regional industrial structure. in addition, the economic development bureau of yangzonghai scenic spot management Committee filed the project on may 6, 2022. the project code is 2205-530133-23-02-02-02-862812-02-862812.
2Planning EIA compliance analysis
See Table 1-2 for the compliance analysis between the Project and the Environmental Impact Report of Kunming Yangzonghai District Master Plan (2010-2020).
Table1-2Schedule of Project and Planning EIA Compliance Analysis



 

Serial Number

Planning EIA Requirements

Situation of the Project

Compliance

 

1. project entry requirements

 

 

1

In line with the national "industrial structure adjustment guidance directory."
(2011) (Amendment) and provincial and municipal production.
Business policy projects. Projects listed in the elimination and restriction categories shall not enter the planning area.

The project complies with the provisions of the Industrial Structure Adjustment Guidance Catalogue (2019 edition) and does not belong to the national "restricted category" and
"Elimination" items

 

Compliant

 

 

2

The settled enterprises must have advanced production technology, good safety performance and meet the requirements of clean production; support the environmental protection industry and high-tech industry supporting the light pollution plus
Industrial enterprises enter the residence.

This project is a green new energy cable production line production project with advanced production technology and good safety.

 

Compliant

 

 

 

3

 

The planning area prohibits the introduction of high-pollution and high-energy-consuming industries such as steel, metallurgy, chemical industry, large and medium-sized machinery manufacturing, building materials, papermaking, tanning, slaughter, sugar and other industries, restricts high-water-consuming beverages, brewing and other industries, and prohibits other non-compliance Planning of other industry projects

During the operation period of the project, the cooling water is recycled and not discharged; the canteen wastewater is treated by the grease trap and enters the septic tank of the plant area together with other domestic wastewater, and then is discharged to the sewage pipe network of the park, and finally enters the sewage station of the Qidian area.
Factory treatment, not direct emissions.

 

 

Compliant

 

 

4

Enterprises entering the park in the planning area shall follow the relevant national laws.
The environmental impact assessment of individual projects is required by laws and regulations, and the relevant environmental protection procedures are handled.

The project is preparing the environmental impact assessment report

 

Compliant

 

 

5

According to the relevant geological data, there are Xiaojiang active fault zones and faults of unknown nature in the planning area. Therefore, the construction in the fault crossing area
Before the development of the project, detailed geological survey is required to determine the nature of the fault and make reasonable avoidance.

 

The project will only be expanded in the original approved plant area, and no new land will be involved.

 

Compliant

 

 

6

It is forbidden to build facilities for storing explosive, flammable, radioactive, toxic and corrosive materials in the scenic spots in the planning area; it is forbidden to set up various development zones in the scenic spots and build hotels and recruitment in the core scenic spots in violation of the planning of the scenic spots
Stay, training center, sanatorium and landscape

 

The Project is located in the area of Qidian Industrial Park and does not involve scenic spots.

 

Compliant

 

To sum up, the project construction and the "Xishan District Haikou Industrial Park Master Plan Environmental Impact Report."
(2013-2030) "review opinion is consistent.

 

 

 

Other buildings unrelated to the protection of scenic resources. The construction activities of scenic spots should conform to the scenic spots
District regulations and other relevant laws and regulations.

 

 

 

Requirements for EIA of 2. Construction Projects

 

 

1

The construction projects in the planning area shall be subject to environmental impact assessment of individual projects in accordance with the requirements of relevant national laws and regulations, and part of the EIA report can be suitable.
When simplifying

 

The project is preparing the environmental impact assessment report

 

Compliant

 

 

 

2

Since the specific engineering design content and construction content of each construction project have not been determined in the planning stage, there will be certain deviations in the process of calculating the amount of related pollutants. Therefore, the environmental impact assessment of specific construction projects should be based on the detailed design of the construction project., Accounting for the amount of pollutants, etc,
and make predictive analysis

 

The project is preparing an environmental impact assessment report and accounting for emissions according to the specific conditions of the construction project.

 

 

Compliant

 

 

3

The EIA of construction projects should pay attention to the analysis of conformity with the Master Plan of Kunming Yangzonghai District: site selection, functional zoning, industrial layout, public support.
Facilities, environmental protection facilities, etc.

After site selection, functional zoning and industrial layout analysis, the construction of the project meets the requirements of the overall planning.

 

Compliant

 

According to the above table, the construction of the project meets the planning and planning EIA requirements of the park.

3Conformance analysis of planning EIA review comments

See Table 1-3 for the compliance analysis of the project and the "Kunming Environmental Protection Bureau on the provincial inspection opinions on the Environmental Impact Report of Kunming Yangzonghai District Master Plan (2010-2020).
Table 1-3 Conformance Analysis of Project and Planning EIA Review Comments

Serial Number

Review comments

Situation of the Project

Compliance

 

Planning area should be strict environmental access, industrial layout should be

The project conforms to the provisions of the "Industrial Structure Adjustment Guidance Catalog (2019 version)", does not belong to the national "restricted category" and "eliminated category" projects, but also conforms to the "Yunnan Province Yangzong Haibao."
Protection Ordinance

 

 

In line with the Regulations on the Protection of Yangzonghai Sea in Yunnan Province and the State

 

1

Home industry policy, in compliance with the premise of laws and regulations.
The construction and development of the planning area, moderate control of the brigade.

Compliant

 

tourism and real estate development, strengthen management and pollution control

 

 

system, and effectively protect the ecological environment of Yangzonghai region.

 

 

2

According to the General Planning of Yangzonghai Region
(2010-2020) "to carry out industrial layout, do a good job of zoning planning and layout, clear park functions and layout

The construction project is located in Qidian Industrial
Planning area, in line with the park's development orientation and industrial layout, this item

 

Compliant

 

Bureau, so that enterprises to meet the industry health protection distance.

Purpose of construction is only in the original plant

 

 

requirements.

Some new equipment will be added to the area.

 

 

3

Establish an environmental risk prevention mechanism. Strengthen the environmental management of the planning area, improve the awareness of environmental risk prevention, and formulate emergency preparedness for possible environmental risks.
case, the implementation of risk prevention measures.

After the completion of the project, the enterprise shall formulate the emergency plan for environmental emergencies according to the requirements of the park.

 

Compliant

 

 

 

 

 

 

Other compliance analysis

1, industrial policy compliance analysis.

  The construction of this project only produces mine-used mobile metal shielding and monitoring rubber-sheathed flexible cables, photovoltaic low-voltage aluminum alloy cables, photovoltaic DC cables and special rubber-sheathed cables for electric welding machines (excluding dry cross-linked power cables of 6 kV and above (for land use)), which belong to wire and cable manufacturing (national economic industry classification code C3831). After comparing with the Industrial Structure Adjustment Guidance Catalog (2019), the project does not belong to encourage, in order to allow projects, the project meets the requirements of the Industrial Structure Adjustment Guidance Catalog (2019 edition). According to the Notice of Yunnan Provincial Department of Commerce of Yunnan Provincial Development and Reform Commission on Forwarding the Negative List of Market Access (2020 Edition) (Yunfa Gai Tai Gai [2021] No. 42), the project does not belong to the prohibited items in the negative list, nor does it belong to the permitted access items, belongs to the industry outside the negative list of market access, and does not involve the prohibitive provisions related to market access. In addition, the Economic Development Bureau of Yangzonghai Scenic Area Management Committee filed the project on May 6, 2022, with the filing project code of 2205-530133-23-02-862812, and agreed to carry out the preliminary work of the project. To sum up, the project meets the requirements of the current industrial policy.

       2. Implementation Opinions of Kunming Municipal People's Government on the "Three Lines and One Order" Ecological Environment Zoning Control in Kunming(No. 21 [2021] of Kun Zheng Fa) According to the Notice on Strengthening the Management of Environmental Impact Assessment with the Improvement of Environmental Quality as the Core (No. 150 [2016] of EIA) issued by the former Ministry of Environmental Protection, it is required to strengthen the management of environmental impact assessment and implement the constraints of "red line of ecological protection, bottom line of environmental quality, on-line of resource utilization and negative list of environmental access, establish a linkage mechanism for project environmental assessment approval and planning environmental assessment, existing project environmental management, and regional environmental quality, to better play the role of the environmental assessment system in preventing environmental pollution and ecological damage from the source, and accelerate the improvement of environmental quality.

(1) The ecological protection red line and general ecological space project are located in Kunming Qidian Industrial Park Kunbao Wire and Cable Manufacturing Co., Ltd., and do not belong to drinking water source protection areas, scenic spots, nature reserves, areas near cultural relics protection units and other areas that need special protection, and do not involve ecological control areas, which is in line with the ecological protection red line planning.

(2) The bottom line of environmental quality According to the "Implementation Opinions of Kunming Municipal People's Government on the" Three Lines and One Order "Ecological Environment Zoning Management and Control in Kunming (KUNZHENG Fa [2021] No. 21)", the bottom line of Kunming's water environment quality is: "The water quality of surface water monitoring sections included in the national and provincial assessments has steadily increased, the water quality of Dianchi Lake and Yangzonghai basins has improved significantly, the water quality outside Dianchi Lake reaches Class IV (chemical oxygen demand ≤ 40 mg/L), the water quality of Yangzonghai Lake reaches Class III, and the water quality of centralized drinking water source is consolidated and improved"; the nearest surface water body involved in the project construction area is Yaochong River. According to the Kunming Ecological Environment Status Bulletin of 2021 issued by Kunming Ecological Environment Bureau, all indicators of the surface water in the project area can meet the Class III water quality standard of Surface Water Environmental Quality Standard (GB3838-2002, it is a surface water environmental quality standard area. No production wastewater is produced in the Project, and the domestic sewage of employees is treated by the self-built septic tank in the plant area and then enters the sewage treatment plant in Qidian District. The completion and operation of the Project will not change the surface water quality in the area where the Project is located. According to the "Implementation Opinions of the Kunming Municipal People's Government on the" Three Lines and One Order "Ecological Environment Zoning Management and Control in Kunming (Kun Zheng Fa [2021] No. 21)", the bottom line of Kunming's atmospheric environmental quality is: "By 2025, the city's ecological environment The quality continues to improve, the ecological space is optimized and effectively protected, and the regional ecological security barrier is more solid. The overall ambient air quality of the city remains excellent. The number of days with good air quality in the built-up area of the main city accounts for more than 99%. The total emissions of sulfur dioxide (SO2) and nitrogen oxides (NOX) are controlled within the target set by the province. The particulate matter (PM10, PM2.5) in the air of the main urban area is stable above the" Ambient Air Quality Standard "standard." According to the Kunming Ecological Environment Bulletin of 2021 issued by Kunming Ecological Environment Bureau, the ambient air quality in the project area can meet the requirements of Ambient Air Quality Standard (GB3095-2012). It is an area meeting the ambient air quality standard and has capacity for project construction. At the same time, the project only produces a small amount of waste gas. After relevant measures are taken, the ambient air function of the project area will not be changed. According to the opinions of Kunming Municipal People's Government on the implementation of "three lines and one order" ecological environment zoning control in Kunming (KZF [2021] No. 21), the bottom line of soil environmental risk prevention and control in Kunming is: "the soil environmental risk prevention system has been further improved, the safe utilization rate of polluted cultivated land and the safe utilization rate of polluted land have been further improved, and the soil environmental risk has been basically controlled. The safe utilization rate of contaminated plots and the soil environmental quality of cultivated land meet the assessment requirements of the state and Yunnan Province." The green new energy cable production line construction project of this project is located in the production workshop of Kunbao Wire and Cable Manufacturing Co., Ltd. in Qidian Industrial Park, which does not involve direct soil pollution, and the waste water, waste gas and solid waste generated by the project are reasonably disposed of, and the soil environmental safety in the project area can be effectively guaranteed.

 

  1. resource utilization online

During the operation of the project, the water is mainly used for employees' daily public water, and the water is supplied by municipal tap water; the project electricity is mainly supplied by the municipal power grid, and the consumption of project resources is less than the total amount of regional resource utilization, so the positive benefits of the project construction are far greater than the negative benefits, so the project meets the requirements of resource utilization on-line.

  1. Ecological environment access list

According to the opinions of Kunming Municipal People's Government on the implementation of "three lines and one order" ecological environment zoning management and control in Kunming (KZF [2021] No. 21), the city is divided into 129 ecological environment control units, which are divided into three categories: priority protection, key control and general control. The unit name of the project is "Chenggong Industrial Park (Qidian)", the unit code is "ZH53011420003", and the unit is classified as "Key Control Unit". The control requirements and implementation are shown in Table 1-3 below.
1-3Control requirements and implementation of key control units

 

Unit classification

 

Control Requirements

 

This project

Compliance

 

Key Control Unit

 

space layout constraint

  1. Focus on the development of green food industry, green Chinese medicine, clean energy, green materials.
  2. Restrictions on metallurgy, machinery manufacturing, chemical, paper, leather, building materials and other industries.
  3. The industrial park is close to the receptor sensitive area, and the development scope and scale of the heavy pollution industry in the park should not be expanded.

 

This project belongs to the wire and cable manufacturing, does not belong to the heavy pollution industry, also does not belong to the restricted industry.

 

 

Compliant

 

 

 

 

Pollutant emission control

 

  1. In the construction of the park, "rain and sewage diversion" must be strictly implemented to strengthen the supervision of industrial pollution sources, and industrial wastewater from enterprises must not be discharged. The discharge of sewage containing pathogens must be disinfected and discharged after meeting the relevant national standards. Strengthen the construction of heavy metal pollution control facilities in industrial enterprises, and encourage enterprises to carry out in-depth treatment on the basis of meeting the discharge standards. Strictly control the discharge of toxic pollutants from chemical industries, and strengthen the management of key environmental management chemical wastes and contaminated sites.

management and disposal.

  1. Implement secondary air quality standards and strengthen total pollutant emission control.

This project implements the Environmental Empty
.
Gas Quality Standard (GB3095)
-2012) Class II standard, only equipment installation is added in the existing factory building, and a perfect rain and sewage diversion system has been built in the factory area. The project does not produce production wastewater, and the domestic sewage enters the sewage treatment plant in Qidian district after pretreatment by grease trap and septic tank. Solid waste
100 per cent disposal



 

 

 

Compliant

 

 

 

Environmental risk prevention and control

  1. Hazardous waste must be disposed of centrally. The collection and storage of hazardous wastes must be classified in accordance with the standards for hazardous wastes, and it is prohibited to mix the collection, storage, transportation and disposal of hazardous wastes of different natures without safe disposal, and to mix hazardous wastes with non-hazardous wastes for storage.
  2. When transporting hazardous waste, measures must be taken to prevent environmental pollution and to comply with the state regulations on the management of hazardous waste transportation.

 

The enterprise has a standardized hazardous waste temporary storage room, and has signed a hazardous waste disposal agreement with Yunnan Dadifengyuan Environmental Protection Co., Ltd., which is in line with the national hazardous waste management regulations.

 

 

Compliant

 

Resources Open

1. The park planning adopts the reclaimed water reuse system as the green space.

The water consumption of this project is small, raw.

Compliant

 

 

 

 

Requirements for hair efficiency

Water and road sprinkling water and other non-potable water use. The secondary standard water treated by the sewage treatment station and sewage treatment facilities is used as the water source and then treated in depth.
Reuse the water resources that meet the middle water standard.
2. The comprehensive utilization rate of industrial solid waste has reached 100 per cent. Ten thousand yuan of industrial output solid waste emissions decreased by 25%, industrial park household waste harmless treatment rate reached
100%。


The waste water produced is recycled after cooling, and the plant is used for greening.
, from the park water station, the project generated by the general industrial solid waste all recycling resources, domestic waste has the park sanitation unified disposal.

 

 

Therefore, the construction of this project meets the requirements of the national industrial policy. After the project is put into operation, the waste gas, waste water and noise can meet the corresponding emission standards under the condition of taking corresponding pollution control measures; all solid wastes are effectively and reasonably disposed of. To sum up, the project construction meets the requirements of "three lines and one order.
3Analysis of Compliance with the Regulations on the Protection of Yangzonghai Sea in Yunnan Province
According to the "Regulations on the Protection of Yangzonghai in Yunnan Province", the Yangzonghai Key Reserve is subject to hierarchical protection and is divided into first-level, second-level, and third-level protection areas: the first-level protection area is the Yangzonghai water body and the highest operating water level
1769.90 meters of the area extending horizontally outward within 100 meters, as well as the main river channel into the lake and the extension on both sides
An area of 20 meters; the second-level protected area is the first-level protected area extending 500 meters horizontally from east to west and from north to south.
The area extending 1200 meters horizontally, and the area extending 50 meters from 20 meters on both sides of the main river into the lake; The third-level protection zone is the Yangzonghai runoff zone outside the first-level and second-level protection zones.
The project area is located in Kunming Qidian Industrial Park Kunbao Wire and Cable Manufacturing Co., Ltd., about 6km away from Yangzonghai Reserve. The location relationship between the project and Yangzonghai classified protection scope is shown in Figure 8. It can be seen from the figure that it is not within the protection scope of Yangzonghai and does not involve Yangzonghai Reserve, which is in line with the Regulations on the Protection of Yangzonghai in Yunnan Province.
4Analysis of Compliance with the Implementation Rules of the Negative List for the Development of the Yangtze River Economic Belt in Yunnan Province (Trial)






On November 1, 2019, the Office of the Leading Group for Promoting the Development of the Yangtze River Economic Belt in Yunnan Province issued a notice on the issuance of the "Detailed Rules for the Implementation of the Negative List for the Development of the Yangtze River Economic Belt in Yunnan Province (Trial)" (Yunfa Gai Foundation [2019] No. 924). See Table 1-4 for the analysis of the conformity between the Project and the Detailed Rules for the Implementation of the Negative List for the Development of the Yangtze River Economic Belt in Yunnan Province (for Trial Implementation).
Table1-4Analysis of Conformity with the Implementation Rules of the Negative List for the Development of the Yangtze River Economic Belt in Yunnan Province (Trial)

 

Unit
Name

Negative List

Actual situation of the project

Judgment
Fixed

 

 

Various functional areas

All investment and construction projects that do not conform to the main function positioning are (I) prohibited, and arbitrary changes of use are strictly prohibited. Due to the needs of the country's major strategic resource exploration, exploration projects will be arranged after approval in accordance with the law without affecting the main function positioning.
The (II) prohibits the protection and development of the Yangtze River shoreline in general.

(I) project construction conforms to the main function orientation;
(II) project is located in kunming qidian industrial park kunbao power
Wire & Cable Manufacturing Co., Ltd.

 

Compliant

 

 

 

 

In addition to ensuring flood control safety, river regime stability, water supply safety and protection of the ecological environment, and projects other than important hub projects have been built in the shoreline protection zone designated in the Plan, it is prohibited to invest in the construction of projects other than ensuring flood control safety, river regime stability, water supply safety, waterway stability and protection of the ecological environment. It is forbidden to invest in the construction of projects that are not conducive to the protection of water resources and natural ecology in the river section protection areas and reserved areas designated by the "National Important Rivers and Lakes Water Function Zoning.
It is (III) prohibited to invest in the construction of projects other than the necessary livelihood projects such as major national strategic resource exploration projects, ecological protection and restoration and environmental governance projects, major infrastructure projects, military and national defense projects, and basic production and life of farmers and herdsmen within the scope of the ecological protection red line. In principle, the ecological protection red line shall be managed according to the requirements of the prohibited development area.
The (IV) prohibits investment in the construction of projects within the scope of permanent basic farmland, except for major national strategic resource exploration projects, ecological protection and restoration and environmental governance projects, major infrastructure projects, military defense projects, and basic production and life of farmers and herdsmen. If it is really difficult to avoid permanent basic farmland in the site selection of major construction projects, the conversion of agricultural land and land acquisition shall be handled in accordance with laws and regulations, and in accordance with the requirements of "no reduction in quantity, no reduction in quality, and stable layout", the corresponding overall land use plan will be revised and legal procedures will be revised.
It is (V) prohibited to occupy and adjust the designated permanent basic farmland, especially the permanent basic farmland around the city, and not to reserve more permanent basic farmland for construction occupation. It is strictly forbidden to evade the examination and approval of permanent basic farmland by adjusting the overall land use planning of counties and townships without authorization, and it is strictly forbidden to occupy it in violation of laws and regulations without examination and approval. It is forbidden to build dense buildings, build houses, build graves, dig sand, quarry, mine, borrow soil, pile up solid waste or carry out other activities that damage permanent basic farmland within the scope of permanent basic farmland; it is forbidden for any unit or individual to destroy the arable layer of permanent basic farmland; it is forbidden for any unit or individual to idle or barren permanent basic farmland. It is forbidden to illegally occupy permanent basic farmland to build leisure tourism, storage plants and other facilities in the name of facility agricultural land, and resolutely prevent the "non-agriculturalization" of permanent basic farmland ".
The (VI) prohibits the construction of first-level tributaries of the Jinsha River and the Yangtze River, except for the Party Central Committee, the State Council, the national investment department, and the provincial level.
Infrastructure projects across the river other than those approved by the department.




Within the scope, it does not involve the shoreline protection area designated by the "Yangtze River Shoreline Protection and Development and Utilization Master Plan" and the river section protection area and reserve area designated by the "National Important Rivers and Lakes Water Function Zoning;
(III) project is located in kunming qidian industrial park kunbao wire and cable manufacturing co., ltd., not within the scope of ecological protection red line;
(IV) project is located in kunming qidian industrial park kunbao wire and cable manufacturing co., ltd., adding production lines in the original factory building, not involving basic farmland;
the (V) project is located in kunbao electric wire and cable manufacturing co., ltd. of kunming qidian industrial park, adding production lines in the original factory building without occupying permanent basic farmland;
(VI) project is built in kunming qidian industrial park kunbao wire and cable manufacturing co., ltd., and does not involve the first-class tributaries of jinsha river and yangtze river.



 

 

 

 

Various types of protected areas

The (VII) prohibits the construction of any production facilities in the core area and buffer zone of the nature reserve. It is forbidden to build production facilities that pollute the environment, damage resources or landscapes, and other projects that discharge pollutants in excess of the national and local pollutant discharge standards in the experimental areas of nature reserves. Activities such as felling, grazing, hunting, fishing, collecting medicinal materials, reclamation, burning wasteland, mining, quarrying and sand dredging are prohibited in nature reserves, except as otherwise provided by laws and administrative regulations.
The (VIII) prohibits the planning of scenic spots without approval or violation.
Various construction activities are carried out against the approved scenic spots planning. It is prohibited to set up all kinds of development zones and in scenic spots.

The (VII) project adds production equipment in the original project workshop, which has been completed, and does not involve nature reserves, felling, grazing, hunting, fishing, medicine gathering, reclamation, burning, mining, quarrying, sand digging and other activities;
(VIII) project in the original project plant to increase production equipment, the plant has been completed, according to the site step.
Survey, not involving scenic spots;

 

 

 

Compliant

 

 

 

 

Investment in the construction of hotels, guest houses, training centers, sanatoriums and other buildings unrelated to the protection of scenic resources in the core scenic spots. It is forbidden to carry out activities that damage the landscape, vegetation, topography and landform, such as mountain mining, quarrying, mining, land reclamation, grave building and monument building in scenic spots; it is forbidden to build facilities for storing explosive, flammable, radioactive, toxic and corrosive materials.
(IX) prohibit the construction, reconstruction and expansion of projects unrelated to water supply facilities and water source protection, as well as investment and construction projects that may pollute drinking water bodies, such as cage culture and tourism, within the coastline and river reach of the first-level protection zone for drinking water sources. It is forbidden to build, rebuild or expand investment and construction projects that discharge pollutants within the shoreline and river reach of the secondary protection zone of drinking water sources.
It is (X) prohibited to build new sewage outlets within the shoreline and river reach of the aquatic germplasm resources protection zone, as well as projects such as reclaiming land from lakes, reclaiming land from lakes, or reclaiming rivers. It is forbidden to engage in real estate, resorts, golf courses, wind power generation, photovoltaic power generation and other construction projects and development activities that do not meet the main functional positioning within the National Wetland Park; it is forbidden to open (enclose) reclamation, landfill or drain wetlands; it is forbidden to cut off wetland water sources, Sand digging, mining, introduction of alien species; unauthorized grazing, fishing, soil collection, water collection, sewage discharge, release; other destruction of wetlands and
activities of its ecological function.


The (IX) project is built in Kunming Qidian Industrial Park Kunbao Wire and Cable Manufacturing Co., Ltd., and does not involve the first-level drinking water source protection zone and the second-level drinking water source protection zone;
(X) project is located in kunming qidian industrial park kunbao wire and cable manufacturing co., ltd., and does not involve aquatic germplasm resources protection area or national wetland park.

 

 

 

 

 

 

 

 

 

Industrial Layout

(11) It is forbidden to build or expand chemical parks and chemical projects within 1km of the shoreline boundary of the Jinsha River and the first-level tributaries of the Yangtze River. The new chemical park fully remains a safe distance from the future expansion and development of surrounding towns, and promotes green chemistry and green chemical development models based on the direction of eco-industrial park construction. The establishment of the chemical park and the industrial development plan of the park shall be examined and approved by experts led by the competent department of business at the provincial level.
(12) It is prohibited to build non-coal mines that do not meet the relevant access standards for the transformation and upgrading of non-coal mines. Prohibited on Jinsha River coastline 3
Kilometers, the Yangtze River first-level tributary shoreline within 1km of the new construction, reconstruction, expansion of tailings pond.
(13) It is forbidden to build or expand high-polluting projects such as steel, petrochemical, chemical, coking, building materials, and non-ferrous materials outside the compliance park. It is forbidden to increase the construction capacity of steel, cement, flat glass and other industries. If it is really necessary to build, the replacement of equal or reduced capacity shall be implemented in accordance with the regulations.
(14) It is prohibited to build or expand projects that do not conform to the national petrochemical, modern coal chemical and other industrial layout plans.
(15) Prohibit the construction and expansion of backward production capacity projects that are explicitly prohibited by laws, regulations and related policies, eliminate unqualified calcium carbide furnaces and open calcium carbide furnaces, and single coking production facilities without chemical recovery in accordance with laws and regulations, Eliminate unqualified pyrite acid, sulfur-based acid, yellow phosphorus production, calcium fusion-fired chromium compound production equipment and organic-inorganic compound fertilizer, superphosphate and calcium magnesium phosphate production lines.
(xvi) Prohibit the construction of pesticide production plants with high toxicity and high residues and a large impact on the environment, and strictly control urea, ammonium phosphate,
Calcium carbide, coke, yellow phosphorus, caustic soda, soda ash, polyvinyl chloride, etc.






(11) The project is built in Kunming Qidian Industrial Park Kunbao Wire and Cable Manufacturing Co., Ltd., and does not involve the Jinsha River and the first-class tributaries of the Yangtze River. This project is for wire and cable manufacturing, not a chemical project;
(12) The project is a wire and cable manufacturing project and does not involve coal mines and tailings ponds;
(13) The project is a wire and cable manufacturing project and does not belong to high-pollution projects such as steel, petrochemical, chemical, coking, building materials, and non-ferrous materials;
(14) The project is a wire and cable manufacturing project, not a petrochemical or modern coal chemical project;
(15) The production equipment to be added to the project belongs to advanced equipment, the process belongs to advanced technology, and does not belong to backward production capacity projects;
(16) The project is a wire and cable manufacturing project, which does not involve the production of pesticide raw materials with high toxicity and high residues and great impact on the environment, and does not involve urea, ammonium phosphate, electricity.
Stone, coke, yellow phosphorus, caustic soda,





 

 

 

 

 

 

 

Compliant

 

 

 

 

New capacity in the industry.
(17) It is forbidden for the relocation and transformation enterprises listed in the list of relocation and transformation of hazardous chemical production enterprises in densely populated urban areas of Yunnan Province to build or expand hazardous chemical production projects at the original site, strengthen the risk control, treatment and repair of land pollution caused by relocation into the park, closure and withdrawal of enterprises, so as to ensure that the vacated land conforms to the planning use
Soil environmental quality standards.

Soda ash, PVC and other industries;
(17) after inquiry, the construction unit is not in the list of relocation and transformation of hazardous chemical production enterprises in densely populated urban areas of Yunnan Province.

 

 

To sum up, the construction of this project does not violate the detailed rules for the implementation of the negative list for the development of the Yangtze River Economic Belt in Yunnan Province (for trial implementation), and conforms to the detailed rules for the implementation of the negative list for the development of the Yangtze River Economic Belt in Yunnan Province (for trial implementation).
5, and the Yangtze River Economic Belt Development Negative List Guide.(on a trial basis,2022 Year Edition)Conformance analysis
On January 19, 2022, the Office of the Leading Group for Promoting the Development of the Yangtze River Economic Belt issued a notice on the issuance of the "Guidelines for the Negative List of the Development of the Yangtze River Economic Belt (Trial, 2022 Edition). See Table 1-5 for the analysis of the consistency between this project and the Guidelines for the Negative List of Yangtze River Economic Belt Development (Trial, 2022 Edition).
Table1-5 With the "Yangtze River Economic Belt Development Negative List Guide."(Trial,2022Year Edition)Conformity analysis


 

Serial Number

Negative List

Actual situation of the project

Compliant
Sex

 

 

1

It is forbidden to build wharf projects that do not conform to the national and provincial port layout plans and the overall port plan, and to build cross-Yangtze River projects that do not conform to the layout plan of the Yangtze River Trunk Channel
Channel items.

This project does not belong to the wharf project, nor does it belong to the Yangtze River channel project.

 

Compliant

 

 

2

It is forbidden to invest in the construction of tourism and production and operation projects within the core area of the nature reserve, the shoreline of the buffer zone and the river section. It is prohibited to invest in the construction of items unrelated to the protection of scenic resources within the shoreline and river reach of the core scenic area of the scenic area.
Objective.

The project is not within the core area of the nature reserve, the shoreline of the buffer zone and the river reach, and is not within the core scenic area of the scenic area.
Within the coastline and river reach.

 

Compliant

 

 

 

3

It is forbidden to build, rebuild or expand projects unrelated to water supply facilities and water source protection within the coastline and river reach of the first-level protection zone of drinking water sources, as well as investment and construction projects that may pollute drinking water bodies such as cage breeding, livestock breeding and tourism.
It is forbidden to build, rebuild or expand the discharge of pollutants within the coastline and river reach of the secondary protection zone of drinking water sources.
investment construction project

 

The Project is not within the scope of the shoreline and river reach of the drinking water source protection zone and the secondary protection zone.

 

 

Compliant

 

 

4

It is forbidden to build new investment and construction projects such as lake reclamation, sea reclamation or reclamation within the coastline and river reach of the aquatic germplasm resources protection zone. Sand dredging, mining, and any non-compliance with the main limits of the National Wetland Park are prohibited.
investment and construction projects with functional positioning.

This project does not add new sewage outlets, does not reclaim land from the lake, reclaim land from the sea or reclaim the sea, and is not on the shoreline and river of the National Wetland Park.
Within the scope of the paragraph.

 

Compliant

 

 

 

5

Illegal use and occupation of the shoreline of rivers and lakes in the Yangtze River Basin are prohibited. It is forbidden to invest in the construction of projects other than flood control revetment, river regulation, water supply, ecological environment protection, waterway regulation and important national infrastructure, which are related to public safety and public interests, in the coastline protection and reserved areas designated in the overall plan for the protection, development and utilization of the Yangtze River coastline. It is forbidden to invest in the river sections and lake protection areas and reserve areas designated in the "National Important Rivers and Lakes Water Function Zoning", which is not conducive to water resources and
Natural ecological protection projects.

 

 

This project is not involved.

 

 

Compliant

 

 

 

6

It is prohibited to set up or change new branches and lakes of the Yangtze River without permission.
Set or expand the sewage outlet.

This project is not involved.

Compliant

 

7

It is forbidden to live in "one river, one mouth, two lakes and seven rivers" and 332 aquatic plants.
production line fishing is carried out in the protected area.

This project is not involved.

Compliant

 

 

8

It is forbidden to build or expand chemical parks and chemical projects within one kilometer of the shoreline of the main and tributaries of the Yangtze River and important lakes. It is forbidden to build, rebuild and expand tailings reservoirs, smelting slag reservoirs and phosphogypsum reservoirs within one kilometer of the shoreline of important tributaries of the inland river within three kilometers of the shoreline of the main stream of the Yangtze River, so as to improve the safety and ecological environment.
Except for alterations for the purpose of protecting the level of environmental protection.

 

This project is not involved.

 

Compliant

 

 

9

It is forbidden to build or expand high-polluting projects such as steel, petrochemical, chemical, coking, building materials, nonferrous metals, pulp and paper outside the compliance park.

This project does not belong to steel, petrochemical, chemical, coking, building materials, non-ferrous, pulp and paper and other high pollution.
Dye project.

 

Compliant

 

10

Prohibit new construction, expansion does not conform to the national petrochemical, modern coal.
Industrial layout planning projects.

This project does not belong to petrochemical, now.
Generation of coal chemical projects.

Compliant

 

 

11

Prohibit new construction, expansion of laws and regulations related policies expressly prohibited backward production capacity projects. Prohibit new construction and expansion of serious excess capacity industries that do not meet the national capacity replacement requirements.
Objective. It is forbidden to build or expand high-energy-consuming and high-emission projects that do not meet the requirements.

This project does not belong to the backward production capacity project, does not belong to the serious excess capacity industry project. Also
It is not a high energy consumption and high emission project.

 

Compliant

 

12

Laws and regulations and related policy documents have more stringent provisions
from its provisions.

This project is not involved.

Compliant

 

In summary, the construction of this project meets the requirements of the Guidelines on the Negative List for the Development of the Yangtze River Economic Belt (Trial, 2022 Edition).
6Analysis of Conformance with the the People's Republic of China Yangtze River Protection Law
See Table 1-6 for the analysis of the conformity between the Project and the the People's Republic of China Yangtze River Protection Law.
Table1-6 the People's Republic of China Yangtze River Protection Law)Conformity analysis


 

Serial Number

Related Content

Actual situation of the project

Compliant
Sex

 

 

1

It is forbidden to distribute industries that have a serious impact on the ecosystem in the key ecological functional areas of the Yangtze River Basin. Banning heavy polluting enterprises and projects to the Yangtze River
Mid-upstream transfer.

 

This project is located in the park of Yangzonghai Qidian production area, and is not a heavy pollutant enterprise.

 

Compliant

 

 

2

It is forbidden to build or expand chemical parks and chemical projects within one kilometer of the shoreline of the main and tributaries of the Yangtze River.

This project is located in the new area of Haikou Industrial Park, Xishan District, about 1.46km away from the Yaokong River; this project is a wire and cable manufacturing project and does not belong to
Chemical projects.

 

Compliant

 

 

 

3

 

It is forbidden to build, rebuild or expand tailings ponds within three kilometers of the coastline of the main stream of the Yangtze River and within one kilometer of the coastline of important tributaries, except for reconstruction for the purpose of improving safety and ecological environment protection.

 

This project is located in the park of Yangzonghai Qidian production area, which belongs to the wire and cable manufacturing project, and does not belong to the project of new construction, reconstruction and expansion of tailings pond.

 

 

Compliant

 

4

Strengthen the high water consumption industry, key water units.
Water quota management, strict control of high water consumption.

This project does not belong to the high water consumption industry, focus.
unit of water use.

Compliant

 

 

 

 

Project construction

 

 

 

 

5

It is prohibited to dump, fill, pile up, discard or treat solid waste within the scope of management of rivers and lakes in the Yangtze River Basin.

This project is a wire and cable manufacturing project, and the hazardous waste generated is entrusted to Yunnan Dadifengyuan Environmental Protection Technology Co,
General industrial solid waste recycling.

 

Compliant

 

 

6

Prohibit highly toxic water transport in the Yangtze River Basin
and other hazardous chemicals prohibited by the State from being transported by inland waterways.

The company has been working with Yunnan Dadifengyuan Environmental Protection Department.
Ltd. has signed a hazardous waste removal and disposal agreement.

 

Compliant

 

In conclusion, the construction of the Project meets the requirements of the the People's Republic of China Yangtze River Protection Law.

7Environmental Management Policy Compliance
According to the requirements of relevant documents, carry out relevant policy compliance analysis on the construction of the project. The products of this project are mainly wires and cables, which belong to wire and cable manufacturing C3831, and do not belong to the key industries (petrochemical, chemical, industrial coating, packaging and printing, oil storage, transportation and marketing, etc.) involved in the Comprehensive Treatment Plan for Volatile Organic Compounds in Key Industries. See Table 1-7 below for details of relevant compliance analysis.
Table1-7Relevant compliance analysis table

 

 

1

On the issuance<Comprehensive Treatment Scheme of Volatile Organic Compounds in Key Industries>The notice (ring atmosphere[2019]53No.)

 

Situation of the Project

Compliance

 

 

 

1

 

Vigorously promote source substitution

By using water-based, powder, high solids, solvent-free, radiation-cured and other low VOCs content coatings, water-based, radiation-cured, plant-based and other low VOCs.
The content of the ink, water-based, hot melt, solvent-free, radiation curing, modification, biodegradation and other low VOCs content of the adhesive, as well as low VOCs content, low reactivity of the cleaning agent, etc., instead of solvent-based coating.
materials, inks, adhesives, cleaning agents, etc., from the source to reduce VOCs generation.

 

 

The project does not belong to the key industry, the project code process uses less ink.

 

 

Compliant

 

 

 

 

2

 

 

Comprehensive strengthening of unorganized emission control

Focus on VOCs-containing materials (including VOCs-containing raw and auxiliary materials, VOCs-containing products, VOCs-containing wastes and organic polymer materials, etc.) storage, transfer and transportation, equipment and pipeline component leakage, open liquid surface escape and process and other five types of emission sources.
Implementation of control, through the adoption of equipment and site closure, process improvements, effective exhaust gas collection and other measures to reduce
VOCs non-organization emissions.

PVC and PE of this project will not be produced without heating.
VOCs, after being collected by the gas collecting hood during the production process, are treated by the activated carbon adsorption box treatment device, and are discharged from the 15m high exhaust cylinder.

 

 

Compliant

 

Increase the rate of waste gas collection. Following the principle of "collection of receivables and collection of quality", the scientific design of the exhaust gas collection system will transform unorganized emissions into organized emissions.
line control.

 

This project uses a gas collecting hood to collect organic waste gas.

 

Compliant

 

 

 

3

 

Strengthen enterprise operation management

Enterprises should systematically sort out the main links and processes of VOCs emission, including starting and stopping, inspection and maintenance operations, etc., formulate specific operating procedures, and implement them to specific responsible persons. Improve the internal assessment system. Strengthen personnel capacity training and technical exchanges. Establish management ledgers to record key parameters for the operation of the enterprise's production and pollution control facilities,
Online monitoring parameters should ensure that they can be retrieved in real time.

 

The enterprise has set up an environmental protection management system and formulated a management plan for VOCs prevention and control measures. After the completion of this project, it will be incorporated into the existing management system.

 

 

Compliant

 

 

 

 

 

The closing account records shall be kept for at least three years.

 

 

 

2

On the issuance<2020Notice of the annual volatile organic compounds control plan> (Huan Da Qi [2020] No. 33)

Situation of the Project

Compliance

 

 

 

 

 

 

Strict implementation of national and local product VOCs content limit standards.

This project strictly implements the national and local product VOCs content limit standards.

 

Compliant

 

 

 

Push hard

Promote the replacement of raw and auxiliary materials with low (no) VOCs content. Enterprises should establish a ledger of raw and auxiliary materials, record the name, composition, VOCs content, purchase volume, usage, inventory, recovery method, recovery volume and other information of VOCs raw and auxiliary materials, and save relevant certification materials. The use of coatings, inks, adhesives, etc. that meet the national regulations on low VOCs content products, and the emission concentration is stable and the emission rate meets the relevant regulations, the corresponding production process may not require the construction of end treatment facilities. Processes where the VOCs content (mass ratio) of raw and auxiliary materials used is less than 10% may not be required.
Take unorganized emission collection and treatment measures.

 

Low usage of project code spraying process
VOCs content of the ink, the use of less, and the establishment of raw materials ledger, record.
VOCs raw and auxiliary materials name, composition, VOCs content, purchase volume, usage, inventory, recycling method, recycling volume and other information, and save the relevant certification materials.

 

 

 

Source header

 

 

Substitute,

 

1

effective reduction

 

 

Less

 

 

VOCs

Compliant

 

Generating

 

 

 

Implementation and implementation of the "Volatile Organic Compounds Unorganized Emission Control Standard"; development of VOCs unorganized emission control procedures, detailed to specific processes and production links, as well as start and stop, inspection and maintenance operations, etc., implemented to the tool.
The person responsible; improve the internal assessment system, in strict accordance with the operating procedures of production.

Execution and implementation of the Project

 

 

 

 

VOLIC NO GROUP

 

 

 

Weaving Emission Control Standards,

Compliant

 

 

Formulation of volatile organic compounds free

 

 

 

Organize emission control procedures.

 

 

 

The storage link should use closed containers, packaging bags, high.

The raw and auxiliary materials used in this project are stored in closed packaging barrels.

 

 

 

 

Effective sealed storage tanks, closed storage, silos, etc. Fit

Compliant

 

 

The unloading, transfer and transportation links shall be closed pipelines or

 

 

 

Closed containers, tankers, etc.

 

 

 

Full fall

Closed equipment should be used in production and use, or operate in a confined space and effectively collect waste gas, or collect local gas. In the disposal process, the packaging containers containing VOCs materials and waste adsorbents containing VOCs waste (slag, liquid) shall be sealed by capping and encapsulating.
Closed, properly stored, not discarded.

The organic waste gas produced in the extrusion and injection molding processes is locally collected by the gas collecting hood. Waste ink bucket
, and other contaminated waste as hazardous waste entrusted to Yunnan Dadifengyuan Ring
Disposal by Insurance Co., Ltd.

 

 

 

Real Standard
requirements,

Compliant

 

Enhanced None

 

2

Organization Row

 

 

Release Control

 

The gathering, transportation, storage and treatment of wastewater with high VOCs content shall be sealed. If there are more than or equal to 2000 sealing points of equipment and pipeline components carrying gaseous and liquid VOCs materials in the enterprise, a ledger shall be established through comprehensive sorting. Petroleum refining, petrochemical and synthetic resin enterprises shall carry out in strict accordance with the requirements of emission standards.
LDAR work, strengthen the standby pump, in-use pump, regulating valve, agitator, open pipeline and other testing work, strengthen quality control;
The sealing point of the tank is included in the inspection plan.

 

 

 

 

Promotion

 

 

 

Governance

 

 

 

Efficiency

This project does not produce high

 

 

 

Wastewater with VOCs content;
No gaseous or liquid VOCs

Compliant

 

 

material.

 

 

 

Petrochemical, chemical, coal chemical, pharmaceutical, pesticide and other lines

Waste oil used in this project

 

 

 

 

Industrial enterprises should strengthen the start-up and shutdown period as well as cleaning, withdrawal.

Ink barrels and other contaminated waste

 

 

 

VOCs in the links of material, purging, venting and drying

Yunnan Dadifeng entrusted with hazardous waste

Compliant

 

 

Emission control to ensure that standards are met. enterprise students

Source Environmental Protection Co., Ltd.

 

 

 

Anti-corrosion, waterproof and anti-rust coating of production facilities should be avoided in summer.

set.

 

 

 

 

 

Or the use of low VOCs content coatings.

 

 

 

 

 

 

 

 

 

 

 

 

3

 

 

 

 

 

 

 

 

Focus on pollution control facilities
"Three
rate "to improve the efficiency of comprehensive governance.

The VOCs collection and treatment facilities that do not meet the requirements shall be replaced or upgraded to ensure that the discharge standards are met. In addition to odor control, generally do not use low
Warm plasma, photocatalysis, photo-oxidation and other technologies.

In this project, VOCs are collected by gas collecting hood and treated by activated carbon adsorption box.
To meet the discharge standards.

 

Compliant

 

Increase the rate of waste gas collection in accordance with the principle of "all receivables. Promote the cancellation of the bypass of the exhaust emission system. If it must be retained due to safety in production and other reasons, the list of retained bypass shall be reported to the local ecological environment department. The bypass shall be kept closed in non-emergency situations, and supervision shall be strengthened through lead sealing, installation of automatic monitoring facilities, flow meters, etc. After opening, it shall be promptly reported to the local ecological environment department.
Report, do a good job of ledger records.

 

The organic waste gas generated from the extrusion and injection molding processes of this project is locally collected by the gas collecting hood. No exhaust system bypass.

 

 

Compliant

 

The unorganized emission is changed into organized emission for control, and closed equipment, operation in closed space or full closed air collecting hood collection method is preferred. For local air collecting hood, the collection point shall be reasonably selected according to the characteristics of exhaust gas emission. VOCs unorganized emission position farthest from the opening surface of the air collecting hood shall be controlled at a wind speed of not less than 0.3 m/s, which cannot meet the requirements.
Through the replacement of high-power fans, the addition of flue fans, increase the vertical curtain and other ways to transform in time.

 

In this project, the air collecting hood is used for local collection, and the VOCs unorganized discharge position farthest from the opening surface of the air collecting hood is used, and the controlled wind speed is greater than 0.3 m/s.

 

 

Compliant

 

Improve the operating rate of governance facilities in accordance with the principle of "starting and stopping" with production equipment. According to the requirements of the treatment process, the production equipment can be started only after the treatment facilities reach the normal operating conditions, and the treatment facilities can be shut down only after the production equipment is stopped and the residual VOCs waste gas is collected and treated.

The VOCS waste gas collection and treatment system of the project operates synchronously with the production process equipment. The VOCS waste gas collection and treatment system can only be stopped after the production process equipment is stopped.
All right.

 

 

Compliant

 

Enterprises to build new pollution control facilities or to implement the transformation of existing pollution control facilities, should be based on the characteristics of exhaust gas emissions, VOCs components and concentration, production conditions, etc., reasonable selection of treatment technology, the treatment is difficult, a single treatment process is difficult to achieve stable standards, to adopt a combination of multiple technologies. If activated carbon adsorption technology is adopted, activated carbon with iodine value not less than 800 mg/g shall be selected, and sufficient amount shall be added, replaced in time and recorded according to the design requirements.
Replacement time and usage.

The project uses activated carbon adsorption box to treat organic waste gas. The iodine value of activated carbon is 800 mg/g. This evaluation requires enterprises to replace activated carbon every 3 months and record the replacement time and usage.

 

 

Compliant

 

3

Implementation of Comprehensive Treatment of Volatile Organic Compounds in Key Industries of Yunnan Province
Programme

Project situation

Compliant
Sex

 

 

 

1

Vigorously promote source substitution. Through the use of water-based, powder, high solid, solvent-free, radiation curing and other low VOCs content coatings, water-based, radiation curing, plant-based and other low VOCs content inks, water-based, hot melt, solvent-free, radiation curing, modification, biodegradation and other low VOCs content adhesives, and low VOCs content, low reactivity cleaning agents, etc., solvent-based coatings, inks,
Adhesives, cleaning agents, etc., from the source to reduce VOCs generation.

 

This project does not belong to the key industry. The amount of ink used in this project is less.

 

 

Compliant

 

 

2

Comprehensively strengthen the control of unorganized emissions. Focus on materials containing VOCs
(including raw and auxiliary materials containing VOCs, products containing VOCs, products containing VOCs
VOCs waste and organic polymer materials, etc.) storage, transfer and.

Project raw materials before use are
The packaging bag is sealed and stored, and the organic waste gas of this project is collected by gas.

 

Compliant

 

 

 

 

Control of five types of emission sources, such as transmission, leakage of equipment and pipeline components, escape of open liquid surface and process, by taking measures such as sealing of equipment and sites, process improvement and effective collection of exhaust gas,
Reduce VOCs non-organization emissions.

After the cover is collected, it enters the activated carbon adsorption device for treatment and is discharged by three 15m high exhaust cylinders.
Put.

 

 

 

 

3

 

Promote the construction of appropriate and efficient pollution control facilities. Enterprises should build new pollution control facilities or renovate existing pollution control facilities, and should reasonably select treatment technologies based on the concentration, composition, air volume, temperature, humidity, pressure, and production conditions of the discharged exhaust gas. Encourage enterprises to adopt a combination of multiple technologies to improve the efficiency of VOCs governance.

The project is an expansion project, through the new with the old measures, the resulting organic waste gas will be collected and treated through the activated carbon adsorption box, after three root.
15m high exhaust pipe row
Put.

 

 

Compliant

 

After analysis and comparison, the project meets the requirements of the above-mentioned environmental management policies.

8Rationality analysis of site selection

The project is a wire and cable manufacturing project. It is located in Kunming Qidian Industrial Park, which is an industrial land. The infrastructure of the park is perfect. The selected factory site is very convenient in power supply, water supply, transportation and other basic conditions. After taking corresponding environmental protection measures, the waste gas generated by the project has little impact on the surrounding environment, and the waste water is discharged into the park pipe network after treatment, which has little impact on the surrounding surface water environment. The noise at the plant boundary can meet the standards and will not cause nuisance to the residents. The solid waste can be reasonably disposed of, and the project is compatible with the surrounding environment. At present, the surrounding environment of the project is of good quality, the infrastructure construction such as water and electricity is perfect, the external environment is relatively simple, and there are no major environmental constraints. Cultural relics, places of interest, historic sites, cultural and natural heritages that do not need special protection around the construction land do not fall within the scope of protection of nature reserves and scenic spots.
To sum up, the project construction site conditions, transportation, environmental protection and water, electricity, communication and other conditions are good, there are no major environmental constraints, and the project site is reasonable.
9Environmental compatibility analysis
There are no environmental protection targets such as concentrated residential areas, schools, hospitals and schools within 500m of the project land; the site selection of the project does not involve environmentally sensitive areas requiring special protection such as nature reserves, scenic spots and ecological function reserves, as well as ecologically sensitive and vulnerable areas such as natural forests and important wetlands. There is no distribution of ancient and famous trees and cultural relics protection units in the project land area and its surrounding area, and there are no obvious environmental constraints and no environmental protection objectives requiring special protection. See Table 1-8 below for the main environmental protection objectives of the project construction area.
Table1-8List of Investigation on Pollution Sources of Surrounding Enterprises of the Project



 

Name of Enterprise

and Project Location
Relationship

Main business

Bearing

Main atmospheric pollutants

 

Yunnan Tianqi Green Food Development Co., Ltd.

 

135m

sales of prepackaged food;
Vegetable products, roasted food, nut products, square

 

Southeast

 

Particulate matter

 

 

 

 

 

Food Processing

 

 

 

Kunming Gaoshanggao Food Co., Ltd.

 

157m

Meat products, agricultural and sideline products acquisition and refrigeration
services;

 

Southwest

Particulate matter, SO2, nitrogen oxides

 

 

 

Dendrobium and other Chinese grass

 

 

 

Yunnan Jinjiudian Biotechnology Co., Ltd.

 

131m

Cultivation, development and sale of medicinal materials; Chinese herbal medicines and
Chinese patent medicine wholesale; medicine

 

South

 

Particulate matter

 

 

manufacturing, pharmaceutical distribution;

 

 

Management Committee of Qidian Industrial Park

245m

Administrative Office

Southeast

/

 

Will

Kunming Dingyue Plastic Products

35m

Plastic products production plus

North

Particulate matter, organic waste gas

 

Limited Company

Labor, material supply and marketing

Sanchuan Cable Group

160m

Wire and cable manufacturing

Northwest

Particulate matter, organic waste gas

 

 

 

Cast of copper, nickel and their alloys

 

 

 

Chinalco Kunming Copper

260

Manufacturing, processing products, sales.
Sales, inspection, research and development,

North

Particulate matter, SO2, nitrogen oxides

 

 

Promotion and consulting services

 

 

From the investigation of the surrounding enterprises of the project, it can be seen that the surrounding enterprises have no restriction factors on the project. The main pollutants of the project are waste gas, solid waste and noise. After corresponding measures are taken, the discharge can meet the standards. Most of the surrounding enterprises of the project are production and processing enterprises, which have little impact on the surrounding enterprises.
To sum up, the project is compatible with the surrounding environment.

 

Table 2. Construction Project Engineering Analysis

 

 

 

 

 

Construction content  

     1. Origin of the Project

Kunming Kunbao Wire and Cable Manufacturing Co., Ltd. is a private enterprise specializing in the production of various wires and cables. In June 2009, the enterprise rented a temporary factory building in Shiba Village, Ala Sub-district Office, Kunming Economic Development Zone for production. In early 2013, the location of the enterprise was planned and requisitioned by Kunming City. In June 2014, the enterprise commissioned Kunming University of Technology to prepare the Environmental Impact Report Form of the Relocation and Technical Transformation Project of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd. In July 2014, it obtained the reply of Kunming Environmental Protection Bureau on the environmental impact report form of relocation and technological transformation project of Kunming kunbao wire and cable manufacturing Co., Ltd. (Kun environmental protection [2014] No. 319). Construction began in September 2014 and was completed and put into operation in October 2015. Due to changes in some engineering contents and production processes during the construction process, the engineering contents, production processes, pollution production links, pollution control measures and pollutant discharge of the project are all changed with the original EIA report and its approval requirements, in November 2017, Kunming kunbao wire and cable manufacturing co., ltd. commissioned Beijing guohuan Tsinghua environmental engineering design and research institute co., ltd. to prepare the supplementary report on environmental impact of Kunming kunbao wire and cable manufacturing co., ltd. relocation and technological transformation project, and in January 2018, it obtained the reply of Kunming environmental protection bureau on the supplementary report on environmental impact of Kunming kunbao wire and cable manufacturing co., ltd. relocation and technological transformation project (kun environmental protection [2018] no 9).

In order to meet the needs of market development, the construction unit purchased some new production equipment to expand the production capacity, and used the vacant area of the existing plant for construction, which does not involve the construction of new plants and structures. With a total investment of 80 million yuan, more than 20 new production equipment will be added. After the completion of the project, 30km of mobile metal shielding and monitoring rubber sheathed flexible cables for mines, 800km of photovoltaic low-voltage aluminum alloy cables, 600km of photovoltaic DC cables and 500km of special rubber sheathed cables for electric welding machines will be added to improve the company's wire and cable manufacturing level and production capacity. According to the relevant provisions of the Catalogue of Classified Management of Environmental Impact Assessment of Construction Projects (2021 Edition), this project belongs to "35. Electrical machinery and equipment manufacturing industry; 77-Wire, cable, optical cable and electrical equipment manufacturing 383" in "Other" (except for only division, welding and assembly; Except for annual non-solvent low VOCs content coatings of less than 10 tons), therefore, this project should prepare an environmental impact report form. After accepting the entrustment, our unit has carried out on-the-spot investigation on the surrounding environment of the project construction site according to the relevant regulations of the national construction project environmental management, collected and verified the relevant local environmental data, and compiled the "Kunming Kunbao Wire and Cable Manufacturing Co., Ltd. Green New Energy Cable Production Line Construction Project Report Form" according to the relevant technical specifications of environmental impact assessment, for the construction unit to submit for approval.

2. Construction content and scale

(1) Main works

 

In order to improve the overall manufacturing level and production capacity of the company's wire and cable, the expansion project added supporting production equipment of the original project, and added more than 20 sets of main production equipment. The public works rely on the supporting facilities of the original project. See Table 2-1 for the specific construction contents.
Table2-1List of main works of the project

 

Project
Composition

Name

Construction content and scale

Remarks

 

 

 

 

Main works

 

1# workshop

 

Conductor production workshop

The semi-finished conductor products for the production of wires and cables are only simply twisted and do not outsource wires and cables. This time, one aluminum alloy large wire drawing machine, one continuous annealing copper large wire drawing machine, one wire harness machine, two frame stranding machines and one bow stranding machine are newly added.

 

New

 

 

 

2# workshop

 

Cable workshop

In the non-independent operation room, one cable forming machine, steel tape armoring machine, SJ120 plastic extruder, SJ90 plastic extruder, horizontal high-speed braiding machine, 630 single stranded machine, 36-type braiding machine and 60-type metal argon arc welding pipe assembly machine are added this time.

 

New

 

 

Wire workshop

In the non-independent operating room, SX-150/16 rubber extruder, SX-120 90/16 rubber extruder, SX-70/16 rubber extruder, JXL-150 90,65 rubber extruder, JXL-65 45 rubber extruder and GJ-630 bowing machine are added this time.

 

New

 

Auxiliary works

Dormitory, canteen and office

Building area of 40565.85 m2,
The first floor is the canteen, the staff dormitory on the 2-4 floor and the office on the 5-6 floor.

 

Relying on

 

 

 

Utilities

Feed water

Supply of municipal water supply network.

Relying on

 

Drainage

Rainwater and sewage diversion; rainwater is discharged into the rainwater pipe network of the park; domestic wastewater is discharged into the sewage treatment plant of Chenggong Industrial Park.

Relying on

 

 

Power supply

The industrial park has built a complete power supply system, and the project power supply is introduced into the transformation and distribution room in the area from the 10kV branch line outside the area. The voltage is transformed into 380V/220V through the power transformation and distribution room, and 50Hz low voltage is used by each monomer in the enterprise.

 

Relying on

 

Heating

Solar energy is used for the living facilities of the Project; liquefied gas and electricity are used for the kitchen;

Relying on

 

 

Fire Fighting

Fire water for the project is supplied by the regional main, and outdoor fire hydrants are installed on the ring pipe network,
The spacing is not more than 150m, and the valve well is set up according to the specification to make the necessary separation, which can ensure the requirements of fire water.

 

Relying on

 

Storage and transportation engineering

Finished product warehouse

Vacant area on the north side of 2# powerhouse

Relying on

 

Raw material library

Raw material warehouse on the east side of 2# plant

Relying on

 

 

 

 

Environmental protection engineering

grease trap

Volume 5m3, located outside the canteen

 

 

Relying on

 

Septic tank

Seven septic tanks with a volume of 10m ³ have been built.

Greening

8647.58m2

Garbage room

The west side and the south side of 1# factory building are respectively equipped with domestic waste sorting collection barrels.

Kitchen Fume Treatment
Facility

Kitchen fume purifier

General solid waste temporary
Depository

There is a 20m2 solid waste temporary storage room on the west side of 2# workshop.

Hazardous waste temporary storage room

Covers an area of 20m2

New

 

Waste gas treatment facilities

One 15m exhaust cylinder, a set of three-stage activated carbon adsorption device and two gas collecting hoods are added to the cable workshop, and one 15m exhaust cylinder, a set of three-stage activated carbon adsorption device and a gas collecting hood are added to the wire workshop.

 

New

 

Table2-3Comparison list of products and capacity expansion before and after

  1. Main production equipment

This project mainly adds 20 new production equipment, and other equipment will continue to use the original equipment. Expansion project mainly
See Table 2-4 for equipment, and Table 2-5 for equipment changes before and after expansion.
Table2-4List of Main Equipment of the Expansion Project

 

 

 

Noise

Selection of low noise equipment, vibration and sound insulation, noise elimination measures.

New

 

  1. Product Scheme

According to the information provided by the construction unit, most of the equipment for the production of wires and cables is general-purpose equipment, which is only the difference in the production process. Therefore, there is no clear production line boundary for all kinds of products produced in this expansion project. According to the customer's requirements, different products are produced by using production equipment. After the completion of the project, 30km/a, 800km/a photovoltaic low-voltage aluminum alloy cable, 600km/a photovoltaic DC cable and 500km/a special rubber cable for electric welding machine will be added. See Table 2-2 below for details, see Table 2-3 for the changes in full-site capacity after expansion.
Table2-2Product scheme of this expansion project

 

Serial Number

Equipment Name

Specifications and models

Quantity

 

1

continuous annealing copper large wire drawing machine

LH0-450/11KT

1

 

2

aluminum alloy large wire drawing machine

LH0-450/13

1

 

Serial Number

Product Model

Product Name

New capacity
km/a)

1

MYPTJ

Mine mobile metal shield monitoring rubber sheathed flexible cable (8.7/10)KV

30

2

ZC-YJLHV22

Photovoltaic low voltage aluminum alloy cable (1.8/3)KV

800

3

PV1-F

Photovoltaic DC Cable 1.8KV

600

4

YH

Special rubber cable for electric welding machine (0.45/0.75)KV

500

Serial Number

Name

production capacity

Unit of measurement

Original Approval

New

Plant-wide capacity

Increase or decrease

1

Steel-reinforced aluminum stranded wire

1600

/

1600

0

t/a

2

Steel-core aluminum alloy stranded wire

540

/

540

0

t/a

3

Overhead insulated cables (1KV and 10KV)

380

/

380

0

t/a

4

XLPE insulated power cable

150

/

150

0

t/a

5

PVC insulated power cable

220

/

220

0

t/a

6

Control cable (PVC insulated control cable, cross-linked PVC insulated control cable)

220

/

220

0

t/a

7

PVC insulated wire (fire-resistant, flame-retardant series)

4280

/

4280

0

t/a

8

Mine mobile metal shield monitoring rubber sheathed flexible cable (8.7/10)KV

/

30

30

30

km/a

9

Photovoltaic low voltage aluminum alloy cable (1.8/3)KV

/

800

800

800

km/a

10

Photovoltaic DC Cable 1.8KV

/

600

600

600

km/a

11

Special rubber cable for electric welding machine (0.45/0.75)KV

/

500

500

500

km/a

 

 

3

Wire harness machine

JGGB-400/6

1

 

4

frame stranding machine

JLK-630/12 18 242#

2

 

5

Bowing machine

JGGB-630/6

1

 

6

horizontal high-speed knitting machine

HGSB-16A

1

 

7

Cable forming machine

1250/1 6

1

 

8

Metal argon arc welding pipe unit

DAG60/180

1

 

9

steel tape armoring machine

800 type

1

 

10

Plastic Extruder

SJ90

1

 

11

single-stranded machine

GJ-630

1

 

12

Braiding machine

Type 36

1

 

13

Extruder

SJ-120/25

1

 

14

Rubber extruder

Type SX-150/16

1

 

15

Rubber extruder

SX-120 90/16

1

 

16

Rubber extruder

Type SX-70/16

1

 

17

Rubber extruder

JXL-150 90 65

1

 

18

Rubber extruder

JXL-65 45

1

 

19

Bowing machine

GJ-630

1

 

Table2-5List of Main Equipment of the Expansion Project

 

Serial Number

Production Equipment

Model specifications

Before expansion

After the expansion

Change

 

1

Copper Medium Puller

ZL-280/17

1

1

unchanged

 

2

Aluminum alloy large drawing machine

LT-450/13

1

1

unchanged

 

3

pipe winch

JG-400/1 6

1

1

unchanged

 

4

pipe winch

JG-630/1 6

1

1

unchanged

 

5

fork winch

JC-400/12 18 24

1

1

unchanged

 

6

Stranding machine

JP-200/6 12

1

1

unchanged

 

7

Stranding machine

JP-12/6 12 18

1

1

unchanged

 

8

cage stranding machine

JL-500/12 18

1

1

unchanged

 

9

Rewinding machine

400/500

1

1

unchanged

 

10

frame winch

JK-630/6 12 18 24

1

1

unchanged

 

11

Plastic Extruder

SJ-65

2

2

unchanged

 

12

Plastic Extruder

SJ-90

1

1

unchanged

 

13

Plastic Extruder

SJ-70 30

3

3

unchanged

 

14

Plastic Extruder

SJ-80

1

1

unchanged

 

15

Cable forming machine

JC-1250/1 1 3

1

1

unchanged

 

16

Lock-type armored machine

LZKH-100

1

1

unchanged

 

17

Cross-linked cable production line

CCV-80 175 100

4

4

unchanged

 

18

Copper tape shielding machine

PRT-600

1

1

unchanged

 

19

Disc cable forming machine

JPD-3150

1

1

unchanged

 

20

Cable forming machine

JC-1250/2 3

1

1

unchanged

 

21

24 Ingot Metal Braiding Machine

HGSB-24

1

1

unchanged

 

22

16 Ingot Metal Braiding Machine

HGSB-16

3

3

unchanged

 

23

Mica Tape Machine

TRBW-630

1

1

unchanged

 

24

Elevator or Hoist

Fuji

1

1

unchanged

 

25

Rewinding machine

500/630

2

2

unchanged

 

26

local release test system

SR-2000/2500KVA

1

1

unchanged

 