Environmental Impact Report Form of Construction Project
2022-08-02

Directory
Basic Information of 1. Construction Projects ............................................................. Error! No bookmarks defined.
Engineering analysis of 2. construction projects ............................................................................. 19
3. regional environmental quality status, environmental protection objectives and evaluation criteria
Major 4. Environmental Impacts and Protection Measures
List of Supervision and Inspection of 5. Environmental Protection Measures ............................................................................. 79
6. Conclusion ..................................................................................................................... 81
Schedule:
Attached Table 1 Summary of Pollutant Emissions of Construction Projects Attachment:
Attached Drawing:
Figure 1: Geographic Location of the Project
Attached Figure 2: Location of Project Surrounding Relationship
Figure: 3: Water system diagram of the Project
Attached Drawing 4: Layout Diagram of Plant Area
Attached Drawing 5: Plane Layout of Conductor Car/Cable Workshop
Attached Drawing 6: Layout Plan of Wire Workshop
Attached Drawing 7: Layout of Ambient Air Status Monitoring
Attached Figure 8: Location Relation Diagram of the Project and Yangzonghai Reserve
Attachments:
Annex 1: Project Power of Attorney
Annex 2: Project Investment Record Certificate
Annex 3: Project Business License
Annex 4: Approval of EIA for Relocation Technical Transformation Project of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.
Annex 5: Official Reply of Environmental Impact Supplementary Report on Relocation and Technical Transformation Project of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.
Annex 6: Acceptance Opinions on Environmental Protection Acceptance of the Relocation Technical Transformation Project of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.
Appendix 7: Monitoring Report Entrusted by Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.
Annex 8: Monitoring Report on Environmental Status of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd.
Annex 9: Entrustment Agreement for Hazardous Wastes
Annex 10: Yunnan Municipal Environmental Protection Bureau on the "Kunming Yangzonghai Regional Master Plan (2010-2020)
Review Opinions of the Environmental Impact Report
Annex 11: Level 3 Audit Table
Annex 12: Screenshot of Pre-trial Publicity








Table 1. Basic information of construction projects
| Name of construction project |
Kunming Kunbao Wire and Cable Manufacturing Co., Ltd. Green New Energy Cable Production Line Construction Project |
|||||||
| Project Code |
2205-530133-23-02-862812 |
|||||||
| CONSTRUCTION UNIT CONTACT |
Yao Wei |
Contact Information |
18088266790 |
|||||
| Construction site |
Kunming Yangzonghai Scenic Area Qidian Industrial Park Kunming Kunbao Wire and Cable Manufacturing Co., Ltd. |
|||||||
| geographical coordinates |
East longitude 102 degrees 55 minutes 13.766 seconds, north latitude 24 degrees 57 minutes 54.129 seconds |
|||||||
|
Industry category of national economy |
C3831 Wire and cable manufacturing |
Industry category of construction project |
Thirty-five, electrical machinery and equipment manufacturing 38-77, wire and cable, optical cable and electrical equipment manufacturing 383-other (except for segmentation, welding, assembly only; |
|||||
|
Nature of construction |
R Expansion
|
) |
R first declaration project
|
|||||
|
Project Approval(Approval |
Yangzonghai Scenic Area Management Committee |
Project Approval (Approval/Filing) Document No. |
2205-530133-23-02-862812 |
|||||
| Total investment |
8000 |
Environmental Protection Investment (RMB 10,000) |
54 |
|||||
| Proportion of Environmental Protection Investment |
0.675% |
Construction period |
September 2022-October 2022 |
|||||
|
Whether to start construction |
R No
|
Land area (m2) |
40565.85m2 |
|||||
|
Setting of special evaluation |
According to the Technical Guidelines for the Preparation of Environmental Impact Report Forms for Construction Projects (Pollution Impact) (for Trial Implementation) |
|||||||
|
|
Special evaluation |
Setting Principles |
Situation of the Project |
Special evaluation |
|
|||
| Atmosphere |
Exhaust gases containing toxic and harmful pollutants 1 and 2 |
The waste gas emitted by the project is not toxic or harmful. |
do not set |
|
||||
To sum up, the project construction and the "Xishan District Haikou Industrial Park Master Plan Environmental Impact Report."
(2013-2030) "review opinion is consistent.
| Serial Number |
Review comments |
Situation of the Project |
Compliance |
|
|
Planning area should be strict environmental access, industrial layout should be |
The project conforms to the provisions of the "Industrial Structure Adjustment Guidance Catalog (2019 version)", does not belong to the national "restricted category" and "eliminated category" projects, but also conforms to the "Yunnan Province Yangzong Haibao." |
|
|
|
In line with the Regulations on the Protection of Yangzonghai Sea in Yunnan Province and the State |
|
|
| 1 |
Home industry policy, in compliance with the premise of laws and regulations. |
Compliant |
|
|
|
tourism and real estate development, strengthen management and pollution control |
|
|
|
|
system, and effectively protect the ecological environment of Yangzonghai region. |
|
|
|
2 |
According to the General Planning of Yangzonghai Region |
The construction project is located in Qidian Industrial |
Compliant |
|
|
Bureau, so that enterprises to meet the industry health protection distance. |
Purpose of construction is only in the original plant |
|
|
|
requirements. |
Some new equipment will be added to the area. |
|
|
3 |
Establish an environmental risk prevention mechanism. Strengthen the environmental management of the planning area, improve the awareness of environmental risk prevention, and formulate emergency preparedness for possible environmental risks. |
After the completion of the project, the enterprise shall formulate the emergency plan for environmental emergencies according to the requirements of the park. |
Compliant |
|
Other compliance analysis |
1, industrial policy compliance analysis. The construction of this project only produces mine-used mobile metal shielding and monitoring rubber-sheathed flexible cables, photovoltaic low-voltage aluminum alloy cables, photovoltaic DC cables and special rubber-sheathed cables for electric welding machines (excluding dry cross-linked power cables of 6 kV and above (for land use)), which belong to wire and cable manufacturing (national economic industry classification code C3831). After comparing with the Industrial Structure Adjustment Guidance Catalog (2019), the project does not belong to encourage, in order to allow projects, the project meets the requirements of the Industrial Structure Adjustment Guidance Catalog (2019 edition). According to the Notice of Yunnan Provincial Department of Commerce of Yunnan Provincial Development and Reform Commission on Forwarding the Negative List of Market Access (2020 Edition) (Yunfa Gai Tai Gai [2021] No. 42), the project does not belong to the prohibited items in the negative list, nor does it belong to the permitted access items, belongs to the industry outside the negative list of market access, and does not involve the prohibitive provisions related to market access. In addition, the Economic Development Bureau of Yangzonghai Scenic Area Management Committee filed the project on May 6, 2022, with the filing project code of 2205-530133-23-02-862812, and agreed to carry out the preliminary work of the project. To sum up, the project meets the requirements of the current industrial policy. 2. Implementation Opinions of Kunming Municipal People's Government on the "Three Lines and One Order" Ecological Environment Zoning Control in Kunming(No. 21 [2021] of Kun Zheng Fa) According to the Notice on Strengthening the Management of Environmental Impact Assessment with the Improvement of Environmental Quality as the Core (No. 150 [2016] of EIA) issued by the former Ministry of Environmental Protection, it is required to strengthen the management of environmental impact assessment and implement the constraints of "red line of ecological protection, bottom line of environmental quality, on-line of resource utilization and negative list of environmental access, establish a linkage mechanism for project environmental assessment approval and planning environmental assessment, existing project environmental management, and regional environmental quality, to better play the role of the environmental assessment system in preventing environmental pollution and ecological damage from the source, and accelerate the improvement of environmental quality. (1) The ecological protection red line and general ecological space project are located in Kunming Qidian Industrial Park Kunbao Wire and Cable Manufacturing Co., Ltd., and do not belong to drinking water source protection areas, scenic spots, nature reserves, areas near cultural relics protection units and other areas that need special protection, and do not involve ecological control areas, which is in line with the ecological protection red line planning. (2) The bottom line of environmental quality According to the "Implementation Opinions of Kunming Municipal People's Government on the" Three Lines and One Order "Ecological Environment Zoning Management and Control in Kunming (KUNZHENG Fa [2021] No. 21)", the bottom line of Kunming's water environment quality is: "The water quality of surface water monitoring sections included in the national and provincial assessments has steadily increased, the water quality of Dianchi Lake and Yangzonghai basins has improved significantly, the water quality outside Dianchi Lake reaches Class IV (chemical oxygen demand ≤ 40 mg/L), the water quality of Yangzonghai Lake reaches Class III, and the water quality of centralized drinking water source is consolidated and improved"; the nearest surface water body involved in the project construction area is Yaochong River. According to the Kunming Ecological Environment Status Bulletin of 2021 issued by Kunming Ecological Environment Bureau, all indicators of the surface water in the project area can meet the Class III water quality standard of Surface Water Environmental Quality Standard (GB3838-2002, it is a surface water environmental quality standard area. No production wastewater is produced in the Project, and the domestic sewage of employees is treated by the self-built septic tank in the plant area and then enters the sewage treatment plant in Qidian District. The completion and operation of the Project will not change the surface water quality in the area where the Project is located. According to the "Implementation Opinions of the Kunming Municipal People's Government on the" Three Lines and One Order "Ecological Environment Zoning Management and Control in Kunming (Kun Zheng Fa [2021] No. 21)", the bottom line of Kunming's atmospheric environmental quality is: "By 2025, the city's ecological environment The quality continues to improve, the ecological space is optimized and effectively protected, and the regional ecological security barrier is more solid. The overall ambient air quality of the city remains excellent. The number of days with good air quality in the built-up area of the main city accounts for more than 99%. The total emissions of sulfur dioxide (SO2) and nitrogen oxides (NOX) are controlled within the target set by the province. The particulate matter (PM10, PM2.5) in the air of the main urban area is stable above the" Ambient Air Quality Standard "standard." According to the Kunming Ecological Environment Bulletin of 2021 issued by Kunming Ecological Environment Bureau, the ambient air quality in the project area can meet the requirements of Ambient Air Quality Standard (GB3095-2012). It is an area meeting the ambient air quality standard and has capacity for project construction. At the same time, the project only produces a small amount of waste gas. After relevant measures are taken, the ambient air function of the project area will not be changed. According to the opinions of Kunming Municipal People's Government on the implementation of "three lines and one order" ecological environment zoning control in Kunming (KZF [2021] No. 21), the bottom line of soil environmental risk prevention and control in Kunming is: "the soil environmental risk prevention system has been further improved, the safe utilization rate of polluted cultivated land and the safe utilization rate of polluted land have been further improved, and the soil environmental risk has been basically controlled. The safe utilization rate of contaminated plots and the soil environmental quality of cultivated land meet the assessment requirements of the state and Yunnan Province." The green new energy cable production line construction project of this project is located in the production workshop of Kunbao Wire and Cable Manufacturing Co., Ltd. in Qidian Industrial Park, which does not involve direct soil pollution, and the waste water, waste gas and solid waste generated by the project are reasonably disposed of, and the soil environmental safety in the project area can be effectively guaranteed. |
|
|
During the operation of the project, the water is mainly used for employees' daily public water, and the water is supplied by municipal tap water; the project electricity is mainly supplied by the municipal power grid, and the consumption of project resources is less than the total amount of regional resource utilization, so the positive benefits of the project construction are far greater than the negative benefits, so the project meets the requirements of resource utilization on-line.
According to the opinions of Kunming Municipal People's Government on the implementation of "three lines and one order" ecological environment zoning management and control in Kunming (KZF [2021] No. 21), the city is divided into 129 ecological environment control units, which are divided into three categories: priority protection, key control and general control. The unit name of the project is "Chenggong Industrial Park (Qidian)", the unit code is "ZH53011420003", and the unit is classified as "Key Control Unit". The control requirements and implementation are shown in Table 1-3 below. |
||||||
|
|
Unit classification |
Control Requirements |
This project |
Compliance |
|
||
| Key Control Unit |
space layout constraint |
|
This project belongs to the wire and cable manufacturing, does not belong to the heavy pollution industry, also does not belong to the restricted industry. |
Compliant |
|
||
|
Pollutant emission control |
management and disposal.
|
This project implements the Environmental Empty |
Compliant |
|
|||
|
Environmental risk prevention and control |
|
The enterprise has a standardized hazardous waste temporary storage room, and has signed a hazardous waste disposal agreement with Yunnan Dadifengyuan Environmental Protection Co., Ltd., which is in line with the national hazardous waste management regulations. |
Compliant |
|
|||
| Resources Open |
1. The park planning adopts the reclaimed water reuse system as the green space. |
The water consumption of this project is small, raw. |
Compliant |
|
|||
|
|
|
|
In addition to ensuring flood control safety, river regime stability, water supply safety and protection of the ecological environment, and projects other than important hub projects have been built in the shoreline protection zone designated in the Plan, it is prohibited to invest in the construction of projects other than ensuring flood control safety, river regime stability, water supply safety, waterway stability and protection of the ecological environment. It is forbidden to invest in the construction of projects that are not conducive to the protection of water resources and natural ecology in the river section protection areas and reserved areas designated by the "National Important Rivers and Lakes Water Function Zoning. |
Within the scope, it does not involve the shoreline protection area designated by the "Yangtze River Shoreline Protection and Development and Utilization Master Plan" and the river section protection area and reserve area designated by the "National Important Rivers and Lakes Water Function Zoning; |
|
|
|
Various types of protected areas |
The (VII) prohibits the construction of any production facilities in the core area and buffer zone of the nature reserve. It is forbidden to build production facilities that pollute the environment, damage resources or landscapes, and other projects that discharge pollutants in excess of the national and local pollutant discharge standards in the experimental areas of nature reserves. Activities such as felling, grazing, hunting, fishing, collecting medicinal materials, reclamation, burning wasteland, mining, quarrying and sand dredging are prohibited in nature reserves, except as otherwise provided by laws and administrative regulations. |
The (VII) project adds production equipment in the original project workshop, which has been completed, and does not involve nature reserves, felling, grazing, hunting, fishing, medicine gathering, reclamation, burning, mining, quarrying, sand digging and other activities; |
Compliant |
|
|
|
|
|
Investment in the construction of hotels, guest houses, training centers, sanatoriums and other buildings unrelated to the protection of scenic resources in the core scenic spots. It is forbidden to carry out activities that damage the landscape, vegetation, topography and landform, such as mountain mining, quarrying, mining, land reclamation, grave building and monument building in scenic spots; it is forbidden to build facilities for storing explosive, flammable, radioactive, toxic and corrosive materials. |
The (IX) project is built in Kunming Qidian Industrial Park Kunbao Wire and Cable Manufacturing Co., Ltd., and does not involve the first-level drinking water source protection zone and the second-level drinking water source protection zone; |
|
|
|
Industrial Layout |
(11) It is forbidden to build or expand chemical parks and chemical projects within 1km of the shoreline boundary of the Jinsha River and the first-level tributaries of the Yangtze River. The new chemical park fully remains a safe distance from the future expansion and development of surrounding towns, and promotes green chemistry and green chemical development models based on the direction of eco-industrial park construction. The establishment of the chemical park and the industrial development plan of the park shall be examined and approved by experts led by the competent department of business at the provincial level. |
(11) The project is built in Kunming Qidian Industrial Park Kunbao Wire and Cable Manufacturing Co., Ltd., and does not involve the Jinsha River and the first-class tributaries of the Yangtze River. This project is for wire and cable manufacturing, not a chemical project; |
Compliant |
|
|
|
|
|
New capacity in the industry. |
Soda ash, PVC and other industries; |
|
|
||
| To sum up, the construction of this project does not violate the detailed rules for the implementation of the negative list for the development of the Yangtze River Economic Belt in Yunnan Province (for trial implementation), and conforms to the detailed rules for the implementation of the negative list for the development of the Yangtze River Economic Belt in Yunnan Province (for trial implementation). |
||||||||
|
|
Serial Number |
Negative List |
Actual situation of the project |
Compliant |
|
|||
|
1 |
It is forbidden to build wharf projects that do not conform to the national and provincial port layout plans and the overall port plan, and to build cross-Yangtze River projects that do not conform to the layout plan of the Yangtze River Trunk Channel |
This project does not belong to the wharf project, nor does it belong to the Yangtze River channel project. |
Compliant |
|
||||
|
2 |
It is forbidden to invest in the construction of tourism and production and operation projects within the core area of the nature reserve, the shoreline of the buffer zone and the river section. It is prohibited to invest in the construction of items unrelated to the protection of scenic resources within the shoreline and river reach of the core scenic area of the scenic area. |
The project is not within the core area of the nature reserve, the shoreline of the buffer zone and the river reach, and is not within the core scenic area of the scenic area. |
Compliant |
|
||||
|
3 |
It is forbidden to build, rebuild or expand projects unrelated to water supply facilities and water source protection within the coastline and river reach of the first-level protection zone of drinking water sources, as well as investment and construction projects that may pollute drinking water bodies such as cage breeding, livestock breeding and tourism. |
The Project is not within the scope of the shoreline and river reach of the drinking water source protection zone and the secondary protection zone. |
Compliant |
|
||||
|
4 |
It is forbidden to build new investment and construction projects such as lake reclamation, sea reclamation or reclamation within the coastline and river reach of the aquatic germplasm resources protection zone. Sand dredging, mining, and any non-compliance with the main limits of the National Wetland Park are prohibited. |
This project does not add new sewage outlets, does not reclaim land from the lake, reclaim land from the sea or reclaim the sea, and is not on the shoreline and river of the National Wetland Park. |
Compliant |
|
||||
|
5 |
Illegal use and occupation of the shoreline of rivers and lakes in the Yangtze River Basin are prohibited. It is forbidden to invest in the construction of projects other than flood control revetment, river regulation, water supply, ecological environment protection, waterway regulation and important national infrastructure, which are related to public safety and public interests, in the coastline protection and reserved areas designated in the overall plan for the protection, development and utilization of the Yangtze River coastline. It is forbidden to invest in the river sections and lake protection areas and reserve areas designated in the "National Important Rivers and Lakes Water Function Zoning", which is not conducive to water resources and |
This project is not involved. |
Compliant |
|
||||
|
|
|
6 |
It is prohibited to set up or change new branches and lakes of the Yangtze River without permission. |
This project is not involved. |
Compliant |
|
|
| 7 |
It is forbidden to live in "one river, one mouth, two lakes and seven rivers" and 332 aquatic plants. |
This project is not involved. |
Compliant |
|
|||
|
8 |
It is forbidden to build or expand chemical parks and chemical projects within one kilometer of the shoreline of the main and tributaries of the Yangtze River and important lakes. It is forbidden to build, rebuild and expand tailings reservoirs, smelting slag reservoirs and phosphogypsum reservoirs within one kilometer of the shoreline of important tributaries of the inland river within three kilometers of the shoreline of the main stream of the Yangtze River, so as to improve the safety and ecological environment. |
This project is not involved. |
Compliant |
|
|||
|
9 |
It is forbidden to build or expand high-polluting projects such as steel, petrochemical, chemical, coking, building materials, nonferrous metals, pulp and paper outside the compliance park. |
This project does not belong to steel, petrochemical, chemical, coking, building materials, non-ferrous, pulp and paper and other high pollution. |
Compliant |
|
|||
| 10 |
Prohibit new construction, expansion does not conform to the national petrochemical, modern coal. |
This project does not belong to petrochemical, now. |
Compliant |
|
|||
|
11 |
Prohibit new construction, expansion of laws and regulations related policies expressly prohibited backward production capacity projects. Prohibit new construction and expansion of serious excess capacity industries that do not meet the national capacity replacement requirements. |
This project does not belong to the backward production capacity project, does not belong to the serious excess capacity industry project. Also |
Compliant |
|
|||
| 12 |
Laws and regulations and related policy documents have more stringent provisions |
This project is not involved. |
Compliant |
|
|||
| In summary, the construction of this project meets the requirements of the Guidelines on the Negative List for the Development of the Yangtze River Economic Belt (Trial, 2022 Edition). |
|||||||
|
|
Serial Number |
Related Content |
Actual situation of the project |
Compliant |
|
||
|
1 |
It is forbidden to distribute industries that have a serious impact on the ecosystem in the key ecological functional areas of the Yangtze River Basin. Banning heavy polluting enterprises and projects to the Yangtze River |
This project is located in the park of Yangzonghai Qidian production area, and is not a heavy pollutant enterprise. |
Compliant |
|
|||
|
2 |
It is forbidden to build or expand chemical parks and chemical projects within one kilometer of the shoreline of the main and tributaries of the Yangtze River. |
This project is located in the new area of Haikou Industrial Park, Xishan District, about 1.46km away from the Yaokong River; this project is a wire and cable manufacturing project and does not belong to |
Compliant |
|
|||
|
3 |
It is forbidden to build, rebuild or expand tailings ponds within three kilometers of the coastline of the main stream of the Yangtze River and within one kilometer of the coastline of important tributaries, except for reconstruction for the purpose of improving safety and ecological environment protection. |
This project is located in the park of Yangzonghai Qidian production area, which belongs to the wire and cable manufacturing project, and does not belong to the project of new construction, reconstruction and expansion of tailings pond. |
Compliant |
|
|||
| 4 |
Strengthen the high water consumption industry, key water units. |
This project does not belong to the high water consumption industry, focus. |
Compliant |
|
|||
|
|
|
|
|
The closing account records shall be kept for at least three years. |
|
|
|
| 2 |
On the issuance<2020Notice of the annual volatile organic compounds control plan> (Huan Da Qi [2020] No. 33) |
Situation of the Project |
Compliance |
|
|||
|
|
|
||||||
|
|
|
Strict implementation of national and local product VOCs content limit standards. |
This project strictly implements the national and local product VOCs content limit standards. |
Compliant |
|
||
|
|
Push hard |
Promote the replacement of raw and auxiliary materials with low (no) VOCs content. Enterprises should establish a ledger of raw and auxiliary materials, record the name, composition, VOCs content, purchase volume, usage, inventory, recovery method, recovery volume and other information of VOCs raw and auxiliary materials, and save relevant certification materials. The use of coatings, inks, adhesives, etc. that meet the national regulations on low VOCs content products, and the emission concentration is stable and the emission rate meets the relevant regulations, the corresponding production process may not require the construction of end treatment facilities. Processes where the VOCs content (mass ratio) of raw and auxiliary materials used is less than 10% may not be required. |
Low usage of project code spraying process |
|
|
||
|
|
Source header |
|
|||||
|
|
Substitute, |
|
|||||
| 1 |
effective reduction |
|
|||||
|
|
Less |
|
|||||
|
|
VOCs |
Compliant |
|||||
|
|
Generating |
|
|||||
|
|
|
Implementation and implementation of the "Volatile Organic Compounds Unorganized Emission Control Standard"; development of VOCs unorganized emission control procedures, detailed to specific processes and production links, as well as start and stop, inspection and maintenance operations, etc., implemented to the tool. |
Execution and implementation of the Project |
|
|
||
|
|
|
VOLIC NO GROUP |
|
||||
|
|
|
Weaving Emission Control Standards, |
Compliant |
||||
|
|
|
Formulation of volatile organic compounds free |
|
||||
|
|
|
Organize emission control procedures. |
|
||||
|
|
|
The storage link should use closed containers, packaging bags, high. |
The raw and auxiliary materials used in this project are stored in closed packaging barrels. |
|
|
||
|
|
|
Effective sealed storage tanks, closed storage, silos, etc. Fit |
Compliant |
||||
|
|
|
The unloading, transfer and transportation links shall be closed pipelines or |
|
||||
|
|
|
Closed containers, tankers, etc. |
|
||||
|
|
Full fall |
Closed equipment should be used in production and use, or operate in a confined space and effectively collect waste gas, or collect local gas. In the disposal process, the packaging containers containing VOCs materials and waste adsorbents containing VOCs waste (slag, liquid) shall be sealed by capping and encapsulating. |
The organic waste gas produced in the extrusion and injection molding processes is locally collected by the gas collecting hood. Waste ink bucket |
|
|
||
|
|
Real Standard |
Compliant |
|||||
|
|
Enhanced None |
|
|||||
| 2 |
Organization Row |
|
|||||
|
|
Release Control |
|
|||||
| The gathering, transportation, storage and treatment of wastewater with high VOCs content shall be sealed. If there are more than or equal to 2000 sealing points of equipment and pipeline components carrying gaseous and liquid VOCs materials in the enterprise, a ledger shall be established through comprehensive sorting. Petroleum refining, petrochemical and synthetic resin enterprises shall carry out in strict accordance with the requirements of emission standards. |
|
|
|
||||
|
|
Promotion |
|
|
||||
|
|
Governance |
|
|
||||
|
|
Efficiency |
This project does not produce high |
|
||||
|
|
|
Wastewater with VOCs content; |
Compliant |
||||
|
|
|
material. |
|
||||
|
|
|
Petrochemical, chemical, coal chemical, pharmaceutical, pesticide and other lines |
Waste oil used in this project |
|
|
||
|
|
|
Industrial enterprises should strengthen the start-up and shutdown period as well as cleaning, withdrawal. |
Ink barrels and other contaminated waste |
|
|||
|
|
|
VOCs in the links of material, purging, venting and drying |
Yunnan Dadifeng entrusted with hazardous waste |
Compliant |
|||
|
|
|
Emission control to ensure that standards are met. enterprise students |
Source Environmental Protection Co., Ltd. |
|
|||
|
|
|
Anti-corrosion, waterproof and anti-rust coating of production facilities should be avoided in summer. |
set. |
|
|||
|
|
|
|
|
Or the use of low VOCs content coatings. |
|
|
|
|
3 |
Focus on pollution control facilities |
The VOCs collection and treatment facilities that do not meet the requirements shall be replaced or upgraded to ensure that the discharge standards are met. In addition to odor control, generally do not use low |
In this project, VOCs are collected by gas collecting hood and treated by activated carbon adsorption box. |
Compliant |
|
||
| Increase the rate of waste gas collection in accordance with the principle of "all receivables. Promote the cancellation of the bypass of the exhaust emission system. If it must be retained due to safety in production and other reasons, the list of retained bypass shall be reported to the local ecological environment department. The bypass shall be kept closed in non-emergency situations, and supervision shall be strengthened through lead sealing, installation of automatic monitoring facilities, flow meters, etc. After opening, it shall be promptly reported to the local ecological environment department. |
The organic waste gas generated from the extrusion and injection molding processes of this project is locally collected by the gas collecting hood. No exhaust system bypass. |
Compliant |
|
||||
| The unorganized emission is changed into organized emission for control, and closed equipment, operation in closed space or full closed air collecting hood collection method is preferred. For local air collecting hood, the collection point shall be reasonably selected according to the characteristics of exhaust gas emission. VOCs unorganized emission position farthest from the opening surface of the air collecting hood shall be controlled at a wind speed of not less than 0.3 m/s, which cannot meet the requirements. |
In this project, the air collecting hood is used for local collection, and the VOCs unorganized discharge position farthest from the opening surface of the air collecting hood is used, and the controlled wind speed is greater than 0.3 m/s. |
Compliant |
|
||||
| Improve the operating rate of governance facilities in accordance with the principle of "starting and stopping" with production equipment. According to the requirements of the treatment process, the production equipment can be started only after the treatment facilities reach the normal operating conditions, and the treatment facilities can be shut down only after the production equipment is stopped and the residual VOCs waste gas is collected and treated. |
The VOCS waste gas collection and treatment system of the project operates synchronously with the production process equipment. The VOCS waste gas collection and treatment system can only be stopped after the production process equipment is stopped. |
Compliant |
|
||||
| Enterprises to build new pollution control facilities or to implement the transformation of existing pollution control facilities, should be based on the characteristics of exhaust gas emissions, VOCs components and concentration, production conditions, etc., reasonable selection of treatment technology, the treatment is difficult, a single treatment process is difficult to achieve stable standards, to adopt a combination of multiple technologies. If activated carbon adsorption technology is adopted, activated carbon with iodine value not less than 800 mg/g shall be selected, and sufficient amount shall be added, replaced in time and recorded according to the design requirements. |
The project uses activated carbon adsorption box to treat organic waste gas. The iodine value of activated carbon is 800 mg/g. This evaluation requires enterprises to replace activated carbon every 3 months and record the replacement time and usage. |
Compliant |
|
||||
| 3 |
Implementation of Comprehensive Treatment of Volatile Organic Compounds in Key Industries of Yunnan Province |
Project situation |
Compliant |
|
|||
|
1 |
Vigorously promote source substitution. Through the use of water-based, powder, high solid, solvent-free, radiation curing and other low VOCs content coatings, water-based, radiation curing, plant-based and other low VOCs content inks, water-based, hot melt, solvent-free, radiation curing, modification, biodegradation and other low VOCs content adhesives, and low VOCs content, low reactivity cleaning agents, etc., solvent-based coatings, inks, |
This project does not belong to the key industry. The amount of ink used in this project is less. |
Compliant |
|
|||
|
2 |
Comprehensively strengthen the control of unorganized emissions. Focus on materials containing VOCs |
Project raw materials before use are |
Compliant |
|
|||
|
|
|
|
|
Food Processing |
|
|
|
| Kunming Gaoshanggao Food Co., Ltd. |
157m |
Meat products, agricultural and sideline products acquisition and refrigeration |
Southwest |
Particulate matter, SO2, nitrogen oxides |
|
||
|
|
|
Dendrobium and other Chinese grass |
|
|
|
||
| Yunnan Jinjiudian Biotechnology Co., Ltd. |
131m |
Cultivation, development and sale of medicinal materials; Chinese herbal medicines and |
South |
Particulate matter |
|||
|
|
|
manufacturing, pharmaceutical distribution; |
|
|
|||
| Management Committee of Qidian Industrial Park |
245m |
Administrative Office |
Southeast |
/ |
|
||
| Will |
|||||||
| Kunming Dingyue Plastic Products |
35m |
Plastic products production plus |
North |
Particulate matter, organic waste gas |
|
||
| Limited Company |
Labor, material supply and marketing |
||||||
| Sanchuan Cable Group |
160m |
Wire and cable manufacturing |
Northwest |
Particulate matter, organic waste gas |
|
||
|
|
|
Cast of copper, nickel and their alloys |
|
|
|
||
| Chinalco Kunming Copper |
260 |
Manufacturing, processing products, sales. |
North |
Particulate matter, SO2, nitrogen oxides |
|||
|
|
|
Promotion and consulting services |
|
|
|||
| From the investigation of the surrounding enterprises of the project, it can be seen that the surrounding enterprises have no restriction factors on the project. The main pollutants of the project are waste gas, solid waste and noise. After corresponding measures are taken, the discharge can meet the standards. Most of the surrounding enterprises of the project are production and processing enterprises, which have little impact on the surrounding enterprises. |
|||||||
Table 2. Construction Project Engineering Analysis
|
Construction content |
||||||
| 1. Origin of the Project Kunming Kunbao Wire and Cable Manufacturing Co., Ltd. is a private enterprise specializing in the production of various wires and cables. In June 2009, the enterprise rented a temporary factory building in Shiba Village, Ala Sub-district Office, Kunming Economic Development Zone for production. In early 2013, the location of the enterprise was planned and requisitioned by Kunming City. In June 2014, the enterprise commissioned Kunming University of Technology to prepare the Environmental Impact Report Form of the Relocation and Technical Transformation Project of Kunming Kunbao Wire and Cable Manufacturing Co., Ltd. In July 2014, it obtained the reply of Kunming Environmental Protection Bureau on the environmental impact report form of relocation and technological transformation project of Kunming kunbao wire and cable manufacturing Co., Ltd. (Kun environmental protection [2014] No. 319). Construction began in September 2014 and was completed and put into operation in October 2015. Due to changes in some engineering contents and production processes during the construction process, the engineering contents, production processes, pollution production links, pollution control measures and pollutant discharge of the project are all changed with the original EIA report and its approval requirements, in November 2017, Kunming kunbao wire and cable manufacturing co., ltd. commissioned Beijing guohuan Tsinghua environmental engineering design and research institute co., ltd. to prepare the supplementary report on environmental impact of Kunming kunbao wire and cable manufacturing co., ltd. relocation and technological transformation project, and in January 2018, it obtained the reply of Kunming environmental protection bureau on the supplementary report on environmental impact of Kunming kunbao wire and cable manufacturing co., ltd. relocation and technological transformation project (kun environmental protection [2018] no 9). In order to meet the needs of market development, the construction unit purchased some new production equipment to expand the production capacity, and used the vacant area of the existing plant for construction, which does not involve the construction of new plants and structures. With a total investment of 80 million yuan, more than 20 new production equipment will be added. After the completion of the project, 30km of mobile metal shielding and monitoring rubber sheathed flexible cables for mines, 800km of photovoltaic low-voltage aluminum alloy cables, 600km of photovoltaic DC cables and 500km of special rubber sheathed cables for electric welding machines will be added to improve the company's wire and cable manufacturing level and production capacity. According to the relevant provisions of the Catalogue of Classified Management of Environmental Impact Assessment of Construction Projects (2021 Edition), this project belongs to "35. Electrical machinery and equipment manufacturing industry; 77-Wire, cable, optical cable and electrical equipment manufacturing 383" in "Other" (except for only division, welding and assembly; Except for annual non-solvent low VOCs content coatings of less than 10 tons), therefore, this project should prepare an environmental impact report form. After accepting the entrustment, our unit has carried out on-the-spot investigation on the surrounding environment of the project construction site according to the relevant regulations of the national construction project environmental management, collected and verified the relevant local environmental data, and compiled the "Kunming Kunbao Wire and Cable Manufacturing Co., Ltd. Green New Energy Cable Production Line Construction Project Report Form" according to the relevant technical specifications of environmental impact assessment, for the construction unit to submit for approval. 2. Construction content and scale (1) Main works |
||||||
|
|
In order to improve the overall manufacturing level and production capacity of the company's wire and cable, the expansion project added supporting production equipment of the original project, and added more than 20 sets of main production equipment. The public works rely on the supporting facilities of the original project. See Table 2-1 for the specific construction contents. |
||||||
|
|
Project |
Name |
Construction content and scale |
Remarks |
|
||
|
Main works |
1# workshop |
Conductor production workshop |
The semi-finished conductor products for the production of wires and cables are only simply twisted and do not outsource wires and cables. This time, one aluminum alloy large wire drawing machine, one continuous annealing copper large wire drawing machine, one wire harness machine, two frame stranding machines and one bow stranding machine are newly added. |
New |
|
||
|
2# workshop |
Cable workshop |
In the non-independent operation room, one cable forming machine, steel tape armoring machine, SJ120 plastic extruder, SJ90 plastic extruder, horizontal high-speed braiding machine, 630 single stranded machine, 36-type braiding machine and 60-type metal argon arc welding pipe assembly machine are added this time. |
New |
|
|||
|
Wire workshop |
In the non-independent operating room, SX-150/16 rubber extruder, SX-120 90/16 rubber extruder, SX-70/16 rubber extruder, JXL-150 90,65 rubber extruder, JXL-65 45 rubber extruder and GJ-630 bowing machine are added this time. |
New |
|
||||
| Auxiliary works |
Dormitory, canteen and office |
Building area of 40565.85 m2, |
Relying on |
|
|||
|
Utilities |
Feed water |
Supply of municipal water supply network. |
Relying on |
|
|||
| Drainage |
Rainwater and sewage diversion; rainwater is discharged into the rainwater pipe network of the park; domestic wastewater is discharged into the sewage treatment plant of Chenggong Industrial Park. |
Relying on |
|
||||
|
Power supply |
The industrial park has built a complete power supply system, and the project power supply is introduced into the transformation and distribution room in the area from the 10kV branch line outside the area. The voltage is transformed into 380V/220V through the power transformation and distribution room, and 50Hz low voltage is used by each monomer in the enterprise. |
Relying on |
|
||||
| Heating |
Solar energy is used for the living facilities of the Project; liquefied gas and electricity are used for the kitchen; |
Relying on |
|
||||
|
Fire Fighting |
Fire water for the project is supplied by the regional main, and outdoor fire hydrants are installed on the ring pipe network, |
Relying on |
|
||||
| Storage and transportation engineering |
Finished product warehouse |
Vacant area on the north side of 2# powerhouse |
Relying on |
|
|||
| Raw material library |
Raw material warehouse on the east side of 2# plant |
Relying on |
|
||||
|
Environmental protection engineering |
grease trap |
Volume 5m3, located outside the canteen |
Relying on |
|
|||
| Septic tank |
Seven septic tanks with a volume of 10m ³ have been built. |
||||||
| Greening |
8647.58m2 |
||||||
| Garbage room |
The west side and the south side of 1# factory building are respectively equipped with domestic waste sorting collection barrels. |
||||||
| Kitchen Fume Treatment |
Kitchen fume purifier |
||||||
| General solid waste temporary |
There is a 20m2 solid waste temporary storage room on the west side of 2# workshop. |
||||||
| Hazardous waste temporary storage room |
Covers an area of 20m2 |
New |
|
||||
| Waste gas treatment facilities |
One 15m exhaust cylinder, a set of three-stage activated carbon adsorption device and two gas collecting hoods are added to the cable workshop, and one 15m exhaust cylinder, a set of three-stage activated carbon adsorption device and a gas collecting hood are added to the wire workshop. |
New |
|
||||
Table2-3Comparison list of products and capacity expansion before and after
This project mainly adds 20 new production equipment, and other equipment will continue to use the original equipment. Expansion project mainly
See Table 2-4 for equipment, and Table 2-5 for equipment changes before and after expansion.
Table2-4List of Main Equipment of the Expansion Project
|
|
|
|
Noise |
Selection of low noise equipment, vibration and sound insulation, noise elimination measures. |
New |
|
|||
|
According to the information provided by the construction unit, most of the equipment for the production of wires and cables is general-purpose equipment, which is only the difference in the production process. Therefore, there is no clear production line boundary for all kinds of products produced in this expansion project. According to the customer's requirements, different products are produced by using production equipment. After the completion of the project, 30km/a, 800km/a photovoltaic low-voltage aluminum alloy cable, 600km/a photovoltaic DC cable and 500km/a special rubber cable for electric welding machine will be added. See Table 2-2 below for details, see Table 2-3 for the changes in full-site capacity after expansion. |
|||||||||
|
|
Serial Number |
Equipment Name |
Specifications and models |
Quantity |
|
||||
| 1 |
continuous annealing copper large wire drawing machine |
LH0-450/11KT |
1 |
|
|||||
| 2 |
aluminum alloy large wire drawing machine |
LH0-450/13 |
1 |
|
|||||
| Serial Number |
Product Model |
Product Name |
New capacity |
| 1 |
MYPTJ |
Mine mobile metal shield monitoring rubber sheathed flexible cable (8.7/10)KV |
30 |
| 2 |
ZC-YJLHV22 |
Photovoltaic low voltage aluminum alloy cable (1.8/3)KV |
800 |
| 3 |
PV1-F |
Photovoltaic DC Cable 1.8KV |
600 |
| 4 |
YH |
Special rubber cable for electric welding machine (0.45/0.75)KV |
500 |
| Serial Number |
Name |
production capacity |
Unit of measurement |
|||
| Original Approval |
New |
Plant-wide capacity |
Increase or decrease |
|||
| 1 |
Steel-reinforced aluminum stranded wire |
1600 |
/ |
1600 |
0 |
t/a |
| 2 |
Steel-core aluminum alloy stranded wire |
540 |
/ |
540 |
0 |
t/a |
| 3 |
Overhead insulated cables (1KV and 10KV) |
380 |
/ |
380 |
0 |
t/a |
| 4 |
XLPE insulated power cable |
150 |
/ |
150 |
0 |
t/a |
| 5 |
PVC insulated power cable |
220 |
/ |
220 |
0 |
t/a |
| 6 |
Control cable (PVC insulated control cable, cross-linked PVC insulated control cable) |
220 |
/ |
220 |
0 |
t/a |
| 7 |
PVC insulated wire (fire-resistant, flame-retardant series) |
4280 |
/ |
4280 |
0 |
t/a |
| 8 |
Mine mobile metal shield monitoring rubber sheathed flexible cable (8.7/10)KV |
/ |
30 |
30 |
30 |
km/a |
| 9 |
Photovoltaic low voltage aluminum alloy cable (1.8/3)KV |
/ |
800 |
800 |
800 |
km/a |
| 10 |
Photovoltaic DC Cable 1.8KV |
/ |
600 |
600 |
600 |
km/a |
| 11 |
Special rubber cable for electric welding machine (0.45/0.75)KV |
/ |
500 |
500 |
500 |
km/a |
|
|
|
3 |
Wire harness machine |
JGGB-400/6 |
1 |
|
|||||
| 4 |
frame stranding machine |
JLK-630/12 18 242# |
2 |
|
|||||||
| 5 |
Bowing machine |
JGGB-630/6 |
1 |
|
|||||||
| 6 |
horizontal high-speed knitting machine |
HGSB-16A |
1 |
|
|||||||
| 7 |
Cable forming machine |
1250/1 6 |
1 |
|
|||||||
| 8 |
Metal argon arc welding pipe unit |
DAG60/180 |
1 |
|
|||||||
| 9 |
steel tape armoring machine |
800 type |
1 |
|
|||||||
| 10 |
Plastic Extruder |
SJ90 |
1 |
|
|||||||
| 11 |
single-stranded machine |
GJ-630 |
1 |
|
|||||||
| 12 |
Braiding machine |
Type 36 |
1 |
|
|||||||
| 13 |
Extruder |
SJ-120/25 |
1 |
|
|||||||
| 14 |
Rubber extruder |
Type SX-150/16 |
1 |
|
|||||||
| 15 |
Rubber extruder |
SX-120 90/16 |
1 |
|
|||||||
| 16 |
Rubber extruder |
Type SX-70/16 |
1 |
|
|||||||
| 17 |
Rubber extruder |
JXL-150 90 65 |
1 |
|
|||||||
| 18 |
Rubber extruder |
JXL-65 45 |
1 |
|
|||||||
| 19 |
Bowing machine |
GJ-630 |
1 |
|
|||||||
| Table2-5List of Main Equipment of the Expansion Project |
|||||||||||
|
|
Serial Number |
Production Equipment |
Model specifications |
Before expansion |
After the expansion |
Change |
|
||||
| 1 |
Copper Medium Puller |
ZL-280/17 |
1 |
1 |
unchanged |
|
|||||
| 2 |
Aluminum alloy large drawing machine |
LT-450/13 |
1 |
1 |
unchanged |
|
|||||
| 3 |
pipe winch |
JG-400/1 6 |
1 |
1 |
unchanged |
|
|||||
| 4 |
pipe winch |
JG-630/1 6 |
1 |
1 |
unchanged |
|
|||||
| 5 |
fork winch |
JC-400/12 18 24 |
1 |
1 |
unchanged |
|
|||||
| 6 |
Stranding machine |
JP-200/6 12 |
1 |
1 |
unchanged |
|
|||||
| 7 |
Stranding machine |
JP-12/6 12 18 |
1 |
1 |
unchanged |
|
|||||
| 8 |
cage stranding machine |
JL-500/12 18 |
1 |
1 |
unchanged |
|
|||||
| 9 |
Rewinding machine |
400/500 |
1 |
1 |
unchanged |
|
|||||
| 10 |
frame winch |
JK-630/6 12 18 24 |
1 |
1 |
unchanged |
|
|||||
| 11 |
Plastic Extruder |
SJ-65 |
2 |
2 |
unchanged |
|
|||||
| 12 |
Plastic Extruder |
SJ-90 |
1 |
1 |
unchanged |
|
|||||
| 13 |
Plastic Extruder |
SJ-70 30 |
3 |
3 |
unchanged |
|
|||||
| 14 |
Plastic Extruder |
SJ-80 |
1 |
1 |
unchanged |
|
|||||
| 15 |
Cable forming machine |
JC-1250/1 1 3 |
1 |
1 |
unchanged |
|
|||||
| 16 |
Lock-type armored machine |
LZKH-100 |
1 |
1 |
unchanged |
|
|||||
| 17 |
Cross-linked cable production line |
CCV-80 175 100 |
4 |
4 |
unchanged |
|
|||||
| 18 |
Copper tape shielding machine |
PRT-600 |
1 |
1 |
unchanged |
|
|||||
| 19 |
Disc cable forming machine |
JPD-3150 |
1 |
1 |
unchanged |
|
|||||
| 20 |
Cable forming machine |
JC-1250/2 3 |
1 |
1 |
unchanged |
|
|||||
| 21 |
24 Ingot Metal Braiding Machine |
HGSB-24 |
1 |
1 |
unchanged |
|
|||||
| 22 |
16 Ingot Metal Braiding Machine |
HGSB-16 |
3 |
3 |
unchanged |
|
|||||
| 23 |
Mica Tape Machine |
TRBW-630 |
1 |
1 |
unchanged |
|
|||||
| 24 |
Elevator or Hoist |
Fuji |
1 |
1 |
unchanged |
|
|||||
| 25 |
Rewinding machine |
500/630 |
2 |
2 |
unchanged |
|
|||||
| 26 |
local release test system |
SR-2000/2500KVA |
1 |
1 |
unchanged |
|
|||||