NEW

2013-01-17

Tightening method of bare wire for electric power

The high-altitude tight line method is mainly used in the tight line construction of distribution lines with small cross-sectional area and small tight line tension. It has the advantages of simple construction method, small operation site and few construction machines. However, most of the processes must be completed at high altitude, increasing the workload of high-altitude operations. When tightening the line, the remaining line should be tightened first, usually with manpower or traction equipment to operate directly on the ground. When the overhead line in front is separated from the ground, the wire tightener can be set at a certain distance (estimated wire tightening length) in front of the tension operating lever tower, the wire tightener can be pulled by the traction equipment, and the wire can be tightened by the pulley at the wire hanging place. When the overhead line is tightened close to the required sag value, slow down the traction speed. When the sag observer in front notifies that the required sag value has been reached, stop towing immediately. When the overhead line stops jumping and the sag does not change, mark the line hanging point hole on the operating lever tower. After marking, the construction personnel on the tower will install the lead and ground wire with strain clamp at high altitude, and hang the lead and ground wire on the tower. This method of operation because the overhead line does not need to be panasonic landing, so called a tight line method. If the guide and ground wire are loosened to the ground after high-altitude marking, the ground operator shall install the strain clamp according to the mark, assemble the insulator string at the same time, tighten the wire again and hang the wire. This method is called secondary lifting and tightening method. The advantage is to reduce the amount of high-altitude work. It is suitable for wire cross-section and tight line tension line, especially the crimping tension clamp, high-altitude construction is quite inconvenient, so most of the use of this method.

View Details

< 12 >